Wildcat Canyon Dam Reconstruction
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140L0624R0004
- Agency
- National Office Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- LaBarge WY
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management seeks to repair the Wildcat Canyon Dam located in Sublette and Lincoln counties, Wyoming. The solicitation requires contractors to remove approximately 65,000 cubic yards of accumulated sediment from the dam and stock pond, re-grade existing incised channels to reestablish floodplains and drainage patterns, seed all disturbed areas, and install temporary erosion control features using salvaged vegetation and rock. Proposals will be evaluated based on technical qualifications, past performance, and price. The response deadline is April 1, 2024.
The acquisition is set aside for total small business. The primary NAICS code is 237990 and PSC code is R499. Key tasks include excavating 65,000 cubic yards of material from the dam site. The estimated value is between $1-5 million. Work must be completed within 425 calendar days of the notice to proceed and will take place in La Barge, Wyoming.
Notice text
The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair Wildcat Canyon Dam located in Sublette and Lincoln counties in Southwest Wyoming. The requirement entails the following significant tasks:
1. Remove the earthen dam by excavating approximately 65,000 cubic yards of sediment accumulated in the stock pond and located within the dam.
2. Eliminate the advancing knickpoint by re-grading the existing incised channels with excavated material from the stock pond and dam.
3. Re-grade the existing incised channels to re-establish a broad draw with numerous dispersed micro-channels.
4. Seed disturbed areas with a reclamation seed mix.
5. Use salvaged sage brush and rock for floodplain roughness to temporarily stabilize re-graded surfaces.
Attachments
Show all 18
Notice history
| Notice | Type | Posted |
|---|---|---|
| Wildcat Canyon Dam Reconstruction | Award Notice | |
| Wildcat Canyon Dam Reconstruction | Solicitation | |
| Wildcat Canyon Dam Reconstruction | Pre-Solicitation | |
| Wildcat Canyon Dam Reconstruction | Pre-Solicitation |