B08_24R0004_Attachment_8_-_Limitations_on_Subcontracting.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- Wildcat Canyon Dam Reconstruction Federal contract opportunity
- Solicitation number
- 140L0624R0004
About this file
This document contains an attachment and related federal contract opportunity notice. The attachment provides a template for tracking limitations on subcontracting for solicitation number 140L0624R0004, which has a total small business set aside. The solicitation is for the reconstruction of Wildcat Canyon Dam and requires the removal of accumulated sediment, regrading of incised channels to reestablish drainage, and seeding of disturbed areas. The work includes excavating approximately 65,000 cubic yards of material, eliminating an advancing erosion point, and using salvaged vegetation and rock for temporary slope stabilization. The Bureau of Land Management is the contracting agency. The response is due within 425 days of the notice to proceed.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0624R0004 - Wildcat Canyon Dam |
| Type of Set Aside | Total Small Business |
| Performance Period | 425 Days After NTP |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .