Wildcat Canyon Dam Reconstruction
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140L0624R0004
- Agency
- National Office Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management seeks to award a firm fixed price construction contract to remove an earthen dam and regrade channels at the Wildcat Canyon Dam site in Wyoming. The single award contract valued between $1-5 million will have a performance period of 425 calendar days from notice to proceed. Offerors must have the ability to provide all labor, materials and equipment to complete the tasks of removing the dam, regrading channels, reseeding disturbed areas and using salvaged materials to stabilize surfaces. The solicitation is expected to issue in late December 2023 with responses due 30 days after issuance in January 2024.
The acquisition is set aside as a total small business opportunity for firms under $39.5 million in size. The predominate NAICS code is 237990 and Davis Bacon Act wages apply. The contract is sought to address accumulated sediment and advance knickpoint issues and will reestablish floodplain contours with dispersed micro-channels.
Notice text
The Bureau of Land Management (BLM) has a construction requirement for all labor, materials, equipment, and supervision to repair Wildcat Canyon Dam located in Sublette and Lincoln counties in Southwest Wyoming. The requirement entails the following significant tasks:
1. Remove the earthen dam by excavating sediment accumulated in the stock pond and located within the dam.
2. Eliminate the advancing knickpoint by re-grading the existing incised channels with excavated material from the stock pond and dam.
3. Re-grade the existing incised channels to re-establish a broad draw with numerous dispersed micro-channels.
4. Seed disturbed areas with a reclamation seed mix.
5. Use salvaged sage brush and rock for floodplain roughness to temporarily stabilize re-graded surfaces.
Attachments
| File | Type | Posted |
|---|---|---|
| B01_24R0004_PreSolNotice_4.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Wildcat Canyon Dam Reconstruction | Award Notice | |
| Wildcat Canyon Dam Reconstruction | Solicitation | |
| Wildcat Canyon Dam Reconstruction | Pre-Solicitation | |
| Wildcat Canyon Dam Reconstruction | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity