Well relocation/Add chlorine injection system

Closed Solicitation Posted

Solicitation number
30251PR250000004
Agency
Coast Guard Department of Homeland Security
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
K046 Modification Of Equipment- Water Purification And Sewage Treatment Equipment
Place of performance
Worton, Maryland 21678, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Coast Guard is seeking a contractor to relocate an existing well and install a chlorine injection system at Coast Guard Station Still Pond in Worton, Maryland. The project requires drilling a new well to 65 feet depth, connecting it to existing infrastructure, installing a submersible pump with electrical connections, sealing the old well, and implementing a chlorine injection system that maintains water quality standards with minimum total chlorine of 0.5 ppm and maximum residual disinfectant level of 4.0 ppm. Contractors must obtain all necessary permits and ensure compliance with federal, state, and local regulations. The government will use a Lowest Price Technically Acceptable (LPTA) evaluation methodology, requiring offerors to submit a five-page technical capabilities volume and a price volume using the provided Excel spreadsheet. Site visits are available from September 3-8, 2025, questions are due by September 10, 2025 at 12:00 PM EDT, and quote submissions must be received by September 12, 2025 at 12:00 PM EDT.

This solicitation does not utilize any set-aside designations and no incumbent contractors are identified in the documentation. While specific award values are not disclosed, the project falls under NAICS code 237110 for water and sewer line construction and requires completion within 21 days of contract acceptance. The work location is at U.S. Coast Guard Station Still Pond, 24192 Still Pond Road, Worton, Maryland 21678. The contract structure is a firm-fixed price purchase order with a total potential duration limited to five years including any option periods. Key personnel contacts include MK1 Shawn Gabert as the primary point of contact and MK1 Juan Caraballo as the Quality Assurance Evaluator Representative, with CWO2 Nicholas D. Johnson serving as the Environmental Protection Specialist.

Notice text

Relocate existing well to a position on property that meets all federal, state and local laws and install a chlorine injection, located at Station Still Pond U.S. Coast Guard 24192 Still Pond RD ,Worton, MD 21678.

Attachments

Files attached to this notice, newest first
File Type Posted
STA Stillpond Well SOW.pdf PDF
12a. RFQ Schedule 30251PR250000004 well relocation updated 03SEP25.doc DOC document
Pricing Spreadsheet.xlsx XLSX spreadsheet
Construction Clauses and Provisions FAC 2022-04.doc DOC document
SAM.gov wage determinations.pdf PDF
12a. RFQ Schedule 30251PR250000004 well relocation.doc DOC document
Sta. Still Pond SOW.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity