STA Stillpond Well SOW.pdf
PDF 145 KB Posted
- Attached to
- Well relocation/Add chlorine injection system Federal contract opportunity
- Solicitation number
- 30251PR250000004
About this file
This Scope of Work details a well installation and replacement project for the U.S. Coast Guard Station Stillpond in Worton, Maryland. The contract requires the contractor to relocate an existing well that is currently near a septic system, drilling and installing a new well that meets all federal, state, and local regulations. Specific requirements include identifying underground utility lines, drilling a new well to a depth of 65 feet, connecting piping to existing infrastructure, installing a submersible pump with proper electrical connections, sealing the old well, and installing a chlorine injection system to treat well water.
The project must be completed within 21 days of contract acceptance, with the contractor responsible for obtaining all necessary permits, ensuring environmental compliance, maintaining safety standards, and coordinating with U.S. Coast Guard personnel. The designated point of contact is MK1 Shawn Gabert, and contractors are strongly encouraged to conduct a site visit prior to bidding. The work must adhere to specific requirements including water quality standards (minimum total chlorine of 0.5 ppm, maximum residual disinfectant level of 4.0 ppm) and comply with environmental and safety regulations published by OSHA and EPA.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12a. RFQ Schedule 30251PR250000004 well relocation updated 03SEP25.doc | DOC document | |
| Construction Clauses and Provisions FAC 2022-04.doc | DOC document | |
| SAM.gov wage determinations.pdf | ||
| Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| 12a. RFQ Schedule 30251PR250000004 well relocation.doc | DOC document | |
| Sta. Still Pond SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14Apr2025
SCOPE OF WORK: INSTALLATION OF NEW WELL AND SEALING OF OLD WELL
STA STILLPOND
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment as required to relocate existing well to a position on property that meets all federal, state and local laws and install a chlorine injection. Existing well is near the septic system and is required to be moved IAW local code. Work will be conducted at USCG Station Stillpond, 24192 Still Pond Rd, Worton, MD 21678.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall agree to relocate existing well to a position on property that meets all federal, state and local laws and seal existing well. Once on site, the contractor shall have all equipment and personnel required to properly complete work, and contract will be considered complete once well water is reestablished to the facility. Work shall commence no later than 21 days after acceptance of the contract.
3. SCOPE OF WORK: Contractor shall provide all services, personnel, materials, and equipment required to:
1) Identify below ground electrical, gas, data, and water lines prior to any drilling or digging on site.
2) Drill and install new well to a depth and size that meets federal, state, and local laws. The existing well depth is 65 feet and the State of Maryland permit number is KE-95-0582.
Coordinate location of new well in accordance with local ordinances, to include 50 feet standoff distance from on-site sewage/septic systems per Code of Maryland Regulations, Well Construction, COMAR 26.04.04. Submit proposed location of new well for Government review.
3) Connect piping from new well to existing tank and associated filtration system.
4) Install new submersible pump and ensure all electrical connections are made IAW federal, state, and local laws.
5) Upon completion of installation of new well, pump, piping, and electrical connections, seal old well to avoid further use IAW all federal, state, and local laws.
6) Conduct clean up of property to remove all unused soil and materials.
7) Ensure no damage was done to existing underground electrical, gas, data, and water lines due to digging/drilling. Repair as necessary to restore connection.
8) Install chlorine injection system to treat well water IAW with all federal, state, and local laws.
Provide water quality standards IAW Title 40 CFR 141-143, National Drinking Water Regulations. Minimum total chlorine (TC) shall be 0.5 ppm. Maximum residual disinfectant level (MRDL) shall be 4.0 ppm.
Prior to departure and completion of the contract the contractor will operate all new equipment with U.S. Coast Guard personnel present to ensure proper operation. Contractor will also visually confirm with U.S. Coast Guard personnel that the old well has been sealed properly and is no longer in use.
4. SITE VISIT: All bidders are strongly encouraged to visit the site to survey the property for old and new well locations. Work will be conducted at USCG Station Stillpond, 24192 Still Pond Rd, Worton, MD 21678. The Government is not responsible for additional costs due to a site visit not being conducted. Interested parties shall make arrangements for a site visit with MK1 Shawn Gabert @ 912-508-4928.
5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE)
REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MK1 Shawn Gabert @ 912-508-4928. Inquiries concerning any phase of the specification before or after award shall be made to MK1 Shawn Gabert.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any misunderstanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of the intended start date. Intended start date shall not exceed 21 days from contract acceptance. The work shall be done in accordance with the specification.
8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. USCG Sector Maryland-NCR will be given a copy of the employee list and an escort for entry on base will be provided. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
1. Responsibilities:
a. All contractors working on USCG Station Stillpond shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Station’s Safety Officer prior to starting work.
b. Written notification must be provided to USCG Sector Maryland-NCR Assistant Safety Officer, MK1 Shawn Gabert @ 912-508-4928 in their capacity as Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Base, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.
c. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on USCG Station Stillpond. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.
2. Rights:
a. Every employee working on USCG Station Stillpond has the right to a safe and healthy workplace. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working on USCG Station Stillpond shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist, CWO4 Matthew Thornton @ 443-610-8459 prior to starting work and must be in accordance with ICSPORTSVA INSTM5090.2, the Unit Environmental Guide.
b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on USCG Station Stillpond. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
| 1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment as required to relocate existing well to a position on property that meets all federal, state and local laws and install a chlorine injection. Existing well ... |
| 4. SITE VISIT: All bidders are strongly encouraged to visit the site to survey the property for old and new well locations. Work will be conducted at USCG Station Stillpond, 24192 Still Pond Rd, Worton, MD 21678. The Government is not responsible fo... |
File details come from the government source that posted it. Updated .