Waterfront multiple award construction contract primarily for the shipyard infrastructure optimization program at hawaii, washington and other areas under the cognizance of NAVFAC

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N6274221R1345
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks up to five indefinite-delivery, indefinite-quantity multiple award construction contracts from the Naval Facilities Engineering Command Pacific. The contracts will provide predominantly construction services including design-bid-build and design-build for waterfront facilities primarily in support of the Shipyard Infrastructure Optimization Program at Joint Base Pearl Harbor-Hickam, Puget Sound Naval Base, and other areas under the command's cognizance. Key objectives include awarding task orders for Military Construction Projects P-209 and P-454 involving dry dock replacements. Proposals are due by August 12, 2021 and will be evaluated based on technical experience, past performance, and price.

There is no set-aside designation. The primary NAICS codes are 237990 and 237310. Contract values may aggregate to a maximum of $8 billion over five years, and individual task order values will typically range from $100,000 to $5 billion. A minimum of $2 million in work is guaranteed for each awardee. The place of performance will be within the United States at locations including Hawaii and Washington.

Notice text

2 versions

Update #2 · Latest ·

NAVFAC Pacific has a requirement to provide predominantly construction services (design-bid-build (DBB) and design-build (DB)) for waterfront facilities primarily in support of the Shipyard Infrastructure Optimization Program (SIOP).  Therefore, NAVFAC Pacific is in need of a fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) multiple award construction contract (MACC) for Hawaii, Washington and other areas under the cognizance of NAVFAC.

This single solicitation may result in the award of a maximum of five (5) IDIQ MACC contracts; however, if determined to be in the best interest of the Government, less than five (5) contracts may be awarded or the Government may cancel the procurement.  The main purpose of the SIOP MACC is to award task orders for military construction project P-209, Fiscal Year (FY) 2023 Dry Dock 3 Replacement at Pearl Harbor Naval Shipyard, and P-454, FY2024 Multi-Mission Dry Dock at Puget Sound Naval Shipyard.  Work may also include task orders for pre-construction planning/preparation and constructability reviews associated with P-209 and P-454 and construction of waterfront facilities such as warehouses, dry docks, piers/wharves, site improvements, dredging and incidental design, environmental, and services related to the waterfront facilities at the Joint Base Pearl Harbor-Hickam, Puget Sound Naval Base, and other areas under NAVFAC cognizance. 

The contract period of performance is anticipated to consist of a five (5) year base period and three (3) 12-month option periods or an aggregate maximum value of $8,000,000,000 for all contracts, whichever comes first.  Each task order will specify the required construction duration.  The typical size of the task orders will typically range between $100,000 and $5,000,000,000.  All work under the MACC will be initiated by task orders that are competed amongst the MACC holders (firms awarded one of the potential contracts).  For some requirements, task orders may be awarded to all MACC holders for the same scope of work, competed and awarded to one MACC holder or where justified, awarded sole source to one MACC holder.  Task orders may require both design and construction services. The government makes no representation as to the number of task orders or actual amount of work to be ordered; however, during the term of the contract, a minimum of $2,000,000 is guaranteed for each awardee for the life of the contract.  There are no additional minimum guarantees obligated for each contract.

Update #1 ·

NAVFAC Pacific has a requirement to provide predominantly construction services (design-bid-build (DBB) and design-build (DB)) for waterfront facilities primarily in support of the Shipyard Infrastructure Optimization Program (SIOP).  Therefore, NAVFAC Pacific is in need of a fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ) multiple award construction contract (MACC) for Hawaii, Washington and other areas under the cognizance of NAVFAC.

This single solicitation may result in the award of a maximum of five (5) IDIQ MACC contracts; however, if determined to be in the best interest of the Government, less than five (5) contracts may be awarded or the Government may cancel the procurement.  The main purpose of the SIOP MACC is to award task orders for military construction project P-209, Fiscal Year (FY) 2023 Dry Dock 3 Replacement at Pearl Harbor Naval Shipyard, and P-454, FY2024 Multi-Mission Dry Dock at Puget Sound Naval Shipyard.  Work may also include task orders for pre-construction planning/preparation and constructability reviews associated with P-209 and P-454 and construction of waterfront facilities such as warehouses, dry docks, piers/wharves, site improvements, dredging and incidental design, environmental, and services related to the waterfront facilities at the Joint Base Pearl Harbor-Hickam, Puget Sound Naval Base, and other areas under NAVFAC cognizance. 

The contract period of performance is anticipated to consist of a five (5) year period or an aggregate maximum value of $8,000,000,000 for all contracts, whichever comes first.  Each task order will specify the required construction duration.  The typical size of the task orders will typically range between $100,000 and $5,000,000,000.  All work under the MACC will be initiated by task orders that are competed amongst the MACC holders (firms awarded one of the potential contracts).  For some requirements, task orders may be awarded to all MACC holders for the same scope of work, competed and awarded to one MACC holder or where justified, awarded sole source to one MACC holder.  Task orders may require both design and construction services. The government makes no representation as to the number of task orders or actual amount of work to be ordered; however, during the term of the contract, a minimum of $2,000,000 is guaranteed for each awardee for the life of the contract.  There are no additional minimum guarantees obligated for each contract.

Files

File Type Posted
21R1345-Note4.pdf PDF
21R1345-Note3.pdf PDF
21R1345-Note2.pdf PDF
21R1345-AMD2.pdf PDF
21R1345-AMD1.pdf PDF
21R1345-Note1.pdf PDF
RFPN6274221R1345.pdf PDF

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract Bremerton, Washington 98314 · NAICS 237990 Naval Facilities Engineering Command No set-aside
General Construction Job Order Contract (JOC) San Diego, California 92152, United States · NAICS 236220 Naval Information Warfare Systems Command Competitive 8(a)
Marine Resource Technical Services Throughout the Naval Facilities Engineering Systems Command (NAVFAC) Pacific Area of Responsibility Naval Facilities Engineering Systems Command (Navfac) Pacific Area of Responsibility 96860 · NAICS 541990 Naval Facilities Engineering Command Partial Small Business
Hawaii Services Follow-On Keyport, Washington 98345, United States · NAICS 541330 Naval Sea Systems Command No set-aside
$495M Small Business Multiple Award Task Order Contract for Design-Build and Design Bid-Build Construction Services for the State of Hawaii, U. S. Army Corps of Engineers, Honolulu District NAICS 236220 ENDIST Honolulu Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors