Watercraft Operations and Maintenance

Closed Solicitation Posted

Solicitation number
FA481925R00090003
Agency
Air Combat Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
488330 Navigational Services to Shipping
PSC
J020 Maint/Repair/Rebuild Of Equipment- Ship And Marine Equipment
Place of performance
Tyndall AFB, Florida 32403, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Air Force Air Combat Command is seeking watercraft operations and maintenance services through Solicitation FA481925R0009 to support the 53rd Weapons Evaluation Group's aerial target testing mission for weapons systems and munitions programs evaluation. Amendment 0003 has modified several proposal requirements, including extending the Past Performance Questionnaire due date from October 1 to October 15, 2025, and adjusting technical submission guidelines such as allowing 10-point font for tables and removing the Mission Essential Services Plan from technical evaluation criteria. The procurement will evaluate proposals based on three primary factors: price, technical capabilities (including staffing plan, security clearances, and quality control plan), and past performance, with all technical subfactors requiring an "Acceptable" rating for consideration. This is structured as a subjective trade-off source selection where the government intends to make award decisions without discussions, emphasizing the importance of comprehensive initial proposals. Key dates include the proposal submission deadline of October 20, 2025, and the Past Performance Questionnaire deadline of October 15, 2025.

This opportunity is designated as a total small business set-aside, specifically reserved for Women-Owned Small Business (WOSB) enterprises under NAICS code 488330 for Navigational Services to Shipping. The total contract value is $47 million with a base performance period from June 1, 2026, to May 31, 2027, and includes multiple option periods extending through May 31, 2030. Services encompass watercraft operations and maintenance, full-scale and sub-scale aerial target mission support, vessel parts, shipyard overhaul, dockside repairs, training, and Security Forces Squadron support services. The contract includes multiple labor categories such as Contract Manager, MR Captain, Chief Engineer, Engine Utility Man, Wiper, Ordinary Seaman, and Diver, with a 60-day transition period preceding the contract start date. Primary performance locations include Tyndall Air Force Base, Florida, and Hampton, Virginia, supporting the critical mission of weapons lethality evaluation testing.

Notice text

2 versions

Update #2 · Latest ·

09/23/2025

Due to restrictions with the Excel Spreadsheet for questions and responses, this document has been converted to a PDF format.

9/19/2025

Amendment 0003 to solicitation FA481925R0009 Watercraft Operations and Maintenance. 

The following changes will be made to the Watercraft Operations and Maintenance solicitation:
A. Attachment 10:
1. Attachment 10 due date is changed from 01 October 2025 to 15 October 2025.
B. Attachment 08 Addendum 52.212-1 instructions to offerors:
1. Section N, paragraph 4 Tables, Charts, Graphs and Figures is changed from 12 point font to 10 point font.
2. Included language to exclude table of contents and glossary from Volumes II and III, for overall page count.
3. Updated Volume II Tab 3, Technical Subfactor 2 - Security Clearance changed the refence to 3.4.2.2 & 5.1.1
4. Volume II - Technical, Page 7 Changed "(2) Technical Approach" and replaced with "(2) Security Clearances."
5. Volume II Tab 2 subfactor 1 Staffing Plan, a. removed "Functional Area" and replaced with "Labor Category".
6. Vol I Tab 2 Title Changed to reflect the narrative in Volume I section D. Tab 2.
7. Section T Vol 2 Tabs have been corrected to proper order.
8. Remove Mission Essential Services Plan from the evaluation criteria in Section T Volume II and include the language for Mission Essential Contractor Services
Plan into Section T Volume I Tab 6. Mission Essential Services Plan will no longer be evaluated under Technical Evaluation in Volume II.
9. The narrative of the Mission Essential Contractors Services Plan have been updated to reflect those of DFARS 252.232-7024.
10. Updated Volume II Tab 4 a. Quality Control Plan to include the following language, "The offeror will be required to submit a DRAFT copy of the Quality control
plan with their proposal."
C. Attachment 09 Addendum to 52.212-2 Evaluations:
1. Removed title language at 1.2 and language at 1.2(v).
2. Included language at 2.1 to read as "This is a subjective trade-off source selection and, for those Offerors who are determined to be technically acceptable, tradeoffs
may be made between past performance, and price in which competing offerors past performance information will be evaluated at approximately equal to
price."
3. Included language at Section 4 Technical Evaluation, "Evaluation will continue until ALL responsive proposals have been evaluated."
4. Removed Mission Essential Services Plan from Section 4 Technical Evaluation of the addendum.
5. Updated Section 4.3 Technical Subfactor 3: Quality Control Plan to include the following language, "The offeror will be required to submit a DRAFT copy of the
Quality control plan with their proposal."
6. Updated Section 6 Evaluation Methodology:
Step 1: Evaluate all proposals for responsiveness to the solicitation terms and conditions.
Step 2: Evaluate all responsive proposals for technical acceptability and past performance.
Step 3: Make a Best Value determination based on the offerors technical acceptability, past performance, and price.

Update #1 ·

Amendment 0003 to solicitation FA481925R0009 Watercraft Operations and Maintenance. 

The following changes will be made to the Watercraft Operations and Maintenance solicitation:
A. Attachment 10:
1. Attachment 10 due date is changed from 01 October 2025 to 15 October 2025.
B. Attachment 08 Addendum 52.212-1 instructions to offerors:
1. Section N, paragraph 4 Tables, Charts, Graphs and Figures is changed from 12 point font to 10 point font.
2. Included language to exclude table of contents and glossary from Volumes II and III, for overall page count.
3. Updated Volume II Tab 3, Technical Subfactor 2 - Security Clearance changed the refence to 3.4.2.2 & 5.1.1
4. Volume II - Technical, Page 7 Changed "(2) Technical Approach" and replaced with "(2) Security Clearances."
5. Volume II Tab 2 subfactor 1 Staffing Plan, a. removed "Functional Area" and replaced with "Labor Category".
6. Vol I Tab 2 Title Changed to reflect the narrative in Volume I section D. Tab 2.
7. Section T Vol 2 Tabs have been corrected to proper order.
8. Remove Mission Essential Services Plan from the evaluation criteria in Section T Volume II and include the language for Mission Essential Contractor Services
Plan into Section T Volume I Tab 6. Mission Essential Services Plan will no longer be evaluated under Technical Evaluation in Volume II.
9. The narrative of the Mission Essential Contractors Services Plan have been updated to reflect those of DFARS 252.232-7024.
10. Updated Volume II Tab 4 a. Quality Control Plan to include the following language, "The offeror will be required to submit a DRAFT copy of the Quality control
plan with their proposal."
C. Attachment 09 Addendum to 52.212-2 Evaluations:
1. Removed title language at 1.2 and language at 1.2(v).
2. Included language at 2.1 to read as "This is a subjective trade-off source selection and, for those Offerors who are determined to be technically acceptable, tradeoffs
may be made between past performance, and price in which competing offerors past performance information will be evaluated at approximately equal to
price."
3. Included language at Section 4 Technical Evaluation, "Evaluation will continue until ALL responsive proposals have been evaluated."
4. Removed Mission Essential Services Plan from Section 4 Technical Evaluation of the addendum.
5. Updated Section 4.3 Technical Subfactor 3: Quality Control Plan to include the following language, "The offeror will be required to submit a DRAFT copy of the
Quality control plan with their proposal."
6. Updated Section 6 Evaluation Methodology:
Step 1: Evaluate all proposals for responsiveness to the solicitation terms and conditions.
Step 2: Evaluate all responsive proposals for technical acceptability and past performance.
Step 3: Make a Best Value determination based on the offerors technical acceptability, past performance, and price.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Watercraft Operations and Maintenance This notice · Latest solicitation Solicitation
Watercraft Operations and Maintenance Solicitation
Watercraft Operations and Maintenance Solicitation
Watercraft Operations and Maintenance Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity