WA ERFO FS MTBKR605 2022-1(3), Mt. Baker – Forest Road 11 MP 23. 9 Repair
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 69056726B000002
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Concrete, Washington, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is seeking contractors to perform emergency repair work on Forest Road 11 at Mile Post 23.9 in the Mt. Baker-Snoqualmie National Forest near Concrete, Washington. The scope of work includes subexcavation, aggregate surfacing, and root-wad/riprap embankment stabilization over a 0.038-mile section of roadway. Key requirements mandate that all backfill, aggregate, and topsoil materials must be sourced from commercial vendors certified as noxious weed-free through the North American Weed Free Forage Program. While specific evaluation criteria details are not explicitly outlined in the pre-solicitation materials, the project will require contractors to demonstrate capability in roadway reconstruction, erosion control, and temporary stream diversion. Technical questions should be directed to wfl.plansspec@dot.gov, and general inquiries to wfl.contracts@dot.gov or 360-619-7520, with the formal solicitation anticipated for Winter/Spring 2025 through SAM.gov.
This contract is not designated as a set-aside, and no incumbent contractors are identified in the pre-solicitation notice. The estimated contract value ranges between $700,000 and $2,000,000, with the project scheduled for completion by Fall 2026. Key work quantities include 2,850 cubic yards of subexcavation, 2,100 cubic yards of select borrow, 400 cubic yards of riprap, and 3,280 square yards of earthwork geosynthetics. The project will also involve landscape restoration with 300 plants, trees, shrubs, and groundcovers, and will require standard equipment such as dump trucks, backhoe loaders, motor graders, and hydraulic excavators. Prospective bidders are encouraged to visit the project site during fall conditions to assess site conditions prior to submitting proposals.
Notice text
WA ERFO FS MTBKR605 2022-1(3), Mt. Baker – Forest Road 11 MP 23.9 Repair
This Work consists of emergency repair of a roadway failure including subexcavation, aggregate surfacing, and root-wad/riprap embankment.
Project Location: Approximately 22 Miles NE of Concrete city, Whatcom County, Washington State.
Project Length: 0.038 Miles
Estimated Price Range: Between: Between $700,000 and $2,000,000
Tentative Solicitation Date: Winter/Spring 2025
Tentative Fixed Completion Date: Fall 2026
See attachments for additional information
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| WA ERFO FS MTBKR605 2022-1(3) Mt. Baker - Forest Road 11 MP 23. 9 Repair | Award Notice | |
| WA ERFO FS MTBKR605 2022-1(3) Mt. Baker - Forest Road 11 MP 23. 9 Repair | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity