wa-ef-mtbkr2022-1-3_Prelim Plans.pdf
PDF 37 MB Posted
- Solicitation number
- 69056726B000002
About this file
This document contains preliminary engineering plan sheets for a Federal Lands Highway emergency road repair project located near Concrete, Washington. The project involves repairing Forest Road 11 at Mile Post 23.9, with a project length of 0.038 miles and an estimated cost between $700,000 and $2,000,000. The technical drawings include detailed specifications for critical construction elements such as stabilized construction exits, check dam installations for erosion control, temporary stream diversion methods, and survey control point coordinates. The project is sponsored by the Department of Transportation Federal Highway Administration and is tentatively scheduled for solicitation in Winter/Spring 2025, with a projected completion date in Fall 2026. The repair work will include subexcavation, aggregate surfacing, and root-wad/riprap embankment stabilization in Whatcom County, Washington.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Description_WA ERFO FS MTBKR605 2022-1(3).pdf | ||
| wa-ef-mtbkr2022-1-3_Prelim Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRELIMINARY - N
OT FOR CONSTRUCTION
BH TP
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
M.P.
M.L.
monument minimum thousand gallon maximum material mile post main line
W
RIP
DI
G W G WV
CP GPS
36 31
36 31
N
E
N 1000
TP
SEC.
SEC.
θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
between bearing bridge balance point bench mark back face back btwn brg.
br.
BP
BM
b.f.
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
NO SCALE
NOTE:
1.
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
W west drwg(s).
dist.
diaph.
dia.
DHV
D exp. jt.
exc.
EW
EQ or eq.
EOP
emb.
elev.
El. 94.16 e.f.
e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge) jt.
IE
ID
joint invert elevation inside diameter ftg.
flg.
fin.
f.f.
footing flange finish front face
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed (velocity)
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sect.
SC
SADT
S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
KSI
square inch thousand pounds per pvmt.
PT
PST
PSC
PSI
PSF
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve
OHWM
OG
OD
o. to o.
o.c.
ordinary high water mark original ground outside diameter out to out on center
NC
N normal crown north
A A
DI
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Control Point (Terrestrial and GPS)
Gas & Water Meter; Gas & Water Valve
Flagpole; Fire Hydrant
Cooking Grate; Garbage Can; Picnic Table
Boulder; Well; Antenna; Grave
Above Ground Tank; Underground Tank
Spot Elevation; Coordinate Grid Tick
Material Source; Bore Hole; Test Pit
Treeline; Individual Trees
Spring or Seep
Section Line 4
Section Corner (Found, Projected) 4
Section Line 16
Section Corner (Found, Projected)16
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
North Arrow
Slope Stake Limits Top of Cut
Toe of Fill
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Concrete Barrier and Guard Wall
Retaining Wall wall face
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
Overhead/Above Ground Utilities
Underground Utilities
Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
- no symbol -
Section A-A
EXISTING PROPOSED
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,
- no symbol -
ABBREVIATIONS
PLAN SYMBOLS AND
101-1W
FP-14
6/2022
WFLHD DETAIL
:4
P
M
J u n e
D e t W
-1 c p w
-w o rk \d
\W
-1
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ORTHOMETRIC
ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
23101 637587.943 1456173.622 876.919 48°44'43.210939"N 121°35'48.998611"W 817.1236 0.999963249 5/8" IR w/fhwa alum cap 1.
23102 637580.313 1456449.069 859.991 48°44'43.162606"N 121°35'44.888012"W 800.2058 0.999964054 5/8" IR w/fhwa alum cap
23103 637378.276 1456582.020 847.316 48°44'41.182159"N 121°35'42.874642"W 787.5298 0.999964554 5/8" IR w/fhwa alum cap
23104 637195.031 1456719.054 835.090 48°44'39.387520"N 121°35'40.803180"W 775.3034 0.999965043 5/8" IR w/fhwa alum cap
COORDINATE SYSTEM : Washington North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : WA83/2011-NIF NSRS11(NAD83/2011) Washington, North Zone, International foot
PROJECT : Mt. Baker-Snoqualmie Erfo Repairs 2022-1(3) FR11-MP 23.9 DATE OF FIELD WORK : July, 2023 DATE OF FINAL ADJUSTMENT : August 2023
PROJECT UNITS : International foot
-F eb -2
:4
A M c:
\p w
-w or k\ d0 w a-ef -m tb kr
-1 -3
_c on tr ol
-s he et .x ls x]
S he et
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
D.1WA ERFO FS MTBKR605 2022-1(3)
SHEET
NUMBER
SURVEY CONTROLPRELIMINARY - N
are similar for flat-bottom ditches
Check dam installation details
V-ditch design shown.
uphill side of fiber roll trench material on
Place excavated See Note 5
Flow line the ends. See Note 6 to prevent flow around
Curve ends upstream
Gravel bag
Filter rock
Filter rock
Trench 2" min.
Trench 2" min.
Fiber roll 9" Ø min.
NO SCALE
NOTE:
conditions.
Adjust check dam spacing based on site-specific around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Drive stakes into undisturbed soil of trench bottom.
stakes. Drive stakes at each end of the fiber roll and at
Install check dams in ditches perpendicular to the flowline.
installation.
Repair all rills or gullies and properly compact prior to requirements of the check dam device.
gravel bags as approved, to meet the functional
Construct check dams from fiber rolls, filter rock, or
7.
6.
5.
4.
3.
2.
1.
FIBER ROLL CHECK DAM
GRAVEL BAG CHECK DAM
FILTER ROCK CHECK DAM
CROSS SECTION
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
CROSS SECTION
V-DITCH
CROSS SECTION
FLAT-BOTTOM DTICH
STAKING DETAIL
FIBER ROLL
PLAN
CROSS SECTION
(See Note 7)
CHECK DAM SPACING
FILTER ROCK
(See Note 7)
CHECK DAM SPACING**
GRAVEL BAG
than 6%.
dams on ditch grades steeper
** Do not use gravel bag check on ditch grades steeper than 5%.
Do not use fiber roll check dams
* Spacing calculated based on
Flow
F lo w
Se e N ote m in m in m in .6 m in
-inch wood8
-inch x 18
Stake fiber rolls in place with 1
Expose stakes 2-inches minimum above top of fiber roll.
2-foot maximum spacing.
9" Ø minimum fiber roll.
GRADE
DITCH
SPACING (max.)
CHECK DAM
5%
4%
3%
2%
GRADE
DITCH
SPACING (max.)
CHECK DAM
6%
5%
4%
3%
2%
GRADE
DITCH
SPACING (max.)
CHECK DAM
6%
5%
4%
3%
2%
(FT)
(FT)
(FT)
MODERATE GRADES
CHECK DAM
157-15W
FP-24, FP-14
7/2016
WFL STANDARD
:5
A
M a r c h
S td W p w w o r k
\d
\W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
movement of typical truck using exit
Construct radius to allow turning stabilization geotextile
Separation-
Filter rock
Existing paved roadway
NO SCALE
NOTE:
STABILIZED CONSTRUCTION EXIT
4.
3.
2.
1.
Adjust length to fit field conditions as approved.
built up sediment.
Minimize tracking onto paved roadway by removing crosses existing drainage ditches.
Provide temporary drainage culvert where entrance
Construct drainage ditches along entrance as directed.
Use this entrance for construction vehicles only.
/e gr es s ar ea w id th of in gr es s
Pr ov id e fu ll
6" min.
50'typical
't yp ica l
CONSTRUCTION EXIT
STABILIZED
157-19W
FP-24
7/2016
WFL STANDARD
:2
A
M M a r c h
S td W p w w o r k
\d
\W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
NUMBER
SHEET
membrane
Waterproof
Existing ground
(anchoring method to be approved)
Waterproof membrane
Existing ground
Portable water bladder streambed grade
Existing sandbags (as needed)
Hand-placed stream flow side of diversion berm.
Impervious sheeting. Place on Minimum berm top elevation manufacturer's recommendations.
handling bags. Fill and place per
Machine-placed large material placing temporary diversion berm.
to the extent practicable when of existing streambed material
Minimize leveling or trenching
Sandbag (typ.)
Minimum berm top elevation
Sandbag (typ.)
NO SCALE
NOTE:
directed.
Use as needed when constructing the isolation barrier as
Repair as needed after rainfall events or as directed.
Inspect and maintain the temporary diversion berm daily.
time.
Place a maximum of one diversion in the stream at any given rows of sandbags above the joints in lower rows.
bottom rows as there are vertical course. Overlap the upper
Place sandbags to form a pyramid by laying equal numbers of approval, including alternate methods, prior to installation.
guidance. Submit temporary stream diversion plans for freeboard. The examples shown are intended as representative
Provide a temporary diversion berm with a minimum height
5.
4.
3.
2.
1.
Limit of work zone
OPTION B
OPTION A
OPTION C
Diverted water level at time of construction
Diverted water level at time of construction
Existing abutment or pier
Water surface elevation
Water surface elevation
Water surface elevation equal to the water surface elevation with at least 12 inches m in m in
4'-6" min.
METHODS
TEMPORARY DIVERSION BERM
628-10W
FP-24
6/2025
WFL STANDARD
:3
P
J u n e
S td
W p w w o r k
\d
\W
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
APPROVED FOR USE
PROJECT
I...
::J
"5i
QJ
6' - 12' See Note 4
.s E:
Lr)
.gi
LQ
Breakaway holes See post detail (typ.)
V • I ' :I
• l.t) ' ~ l.t) 0
<: .s ~ QJ 0 QJ E: <: CJ)
'<;I- QJ
QJ
CJ)
SINGLE POST SIGN
l::
Q
WOOD POST SELECTION TABLE
WIDTH AREA NUMBER POST SIZE D
"X" (SQFT) OF POSTS (INCH) (INCH)
Diamond=,; 36" < 10 1 4x4 36
Other Shapes=,; 48" 1 4x6 48 Diamond=,; 48" 10 - 20 1 6x6 48
Diamond=,; 48" 10 - 20 2 4x4 36 Other Shapes =5 12' 20 - 50 2 4x6 48
> 13' 50 - 65 2 6x6 48 12' - 16' 50 - 65 3 4x6 48
> 17' 65- 95 4 4x6 48 > 30' 65- 95 3 6x6 48
0.75X
HOLE SIZE
(INCH)
1.5
1.5
1.5 1.5
X
0.2X 0.6X 0.2X
:l:
Q
TWO POST SIGN
Long side of post
<l. Post
=o-
POST DETAIL
Bottom of sign panel
Field drill holes through post parallel to sign face.
See table for hole size
PROJECT
NOTE:
1. Attach sign panels with a minimum of two¼" diameter bolts per post.
2. H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
3. D = Post embedment depth for average soil conditions.
4. In areas where lateral distance is limited, a minimum lateral offset of 2 ft may be used. In areas with curbs, a minimum lateral distance of 1 ft behind the face of the curb may be used.
SHEET
NUMBER
5. In pedestrian locations, or in areas with obstructed views, use 7 ft minimum mounting height for main sign and 6 ft minimum mounting height for secondary sign.
6. Use 7 ft minimum spacing between posts for sign posts 6" x 6" or larger.
7. State standards may be used as an alternative if approved.
SIGN INSTALLATION ANGLE
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
OFFICE OF FEDERAL LANDS HIGHWAY
FLH STANDARD
635-14
SPECIFICATION
FP-24, FP-14
NO SCALE
TEMPORARY TRAFFIC CONTROL
SIGN INSTALLATION
WOOD POSTS
APPROVED FOR USE
2/2024 PRELIMINARY - N
| wa-ef-mb605-2022-1-2_PLANS 95%.pdf |
| W101-1.pdf |
| WFL Detail Drawings |
| W101-1: Plan Symbols and Abbreviations |
| Metric |
| US Customary |
| W157-15 check dam.pdf |
| WFLHD Detail Drawings |
| W157-15: Check Dam, Moderate Grades |
| Metric |
| US Customary |
| W157-21.pdf |
| WFL Detail Drawings |
| W157-21: Fiber Roll |
| Metric |
| US Customary |
| W157-17.pdf |
| WFL Detail Drawings |
| W157-17: Temporary Diversion Berm Methods |
| Metric |
| US Customary |
| W157-15.pdf |
| WFL Detail Drawings |
| W157-15: Check Dam, Moderate Grades |
| Metric |
| US Customary |
| W157-1.pdf |
| WFL Detail Drawings |
| W157-1: Silt Fence |
| Metric |
| US Customary |
| W157-17.pdf |
| WFL Detail Drawings |
| W157-17: Temporary Diversion Berm Methods |
| Metric |
| US Customary |
| W157-21.pdf |
| WFL Detail Drawings |
| W157-21: Fiber Roll |
| Metric |
| US Customary |
| Std635-5.pdf |
| FLH Standard Drawings |
| 635-5: Road Closure Layout (with Flaggers) |
| Metric |
| US Customary |
| Std635-1.pdf |
| FLH Standard Drawings |
| 635-1: Advance Signing |
| Metric |
| US Customary |
| Std635-14.pdf |
| FLH Standard Drawings |
| 635-14: Sign Installation, Wood Posts |
| Metric |
| US Customary |
| A1.pdf |
| Sheet |
| W628-10 (1).pdf |
| WFL Standard Drawings |
| W628-10: Temporary Diversion Berm Methods |
| Metric |
| US Customary |
| W157-19 (1).pdf |
| WFL Standard Drawings |
| W157-19: Stabilized Construction Exit |
| Metric |
| US Customary |
| Proj-Num: WA ERFO FS MTBKR605 2022-1(3) |
| W101-1: A.2 |
| NPS: |
| W157-15: E.2 |
| 635-14: F.2 |
| W628-10: E.4 |
| W157-19: E.3 |