UTTR CMCC at Hill AFB, UT
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W91238-19-R-0026
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Hill Afb Ut 84056 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers intends to issue a Request for Proposal for the construction of a new Consolidated Mission Control Center facility at Hill Air Force Base in Utah to replace outdated air traffic control and post-mission evaluation infrastructure. The project scope involves building an approximately 85,000 square foot facility in accordance with applicable codes and Air Force design standards to optimize functionality for mission control, air operations, and administration while promoting personnel well-being and mission success. The solicitation is anticipated to be issued on September 10, 2020 with proposals due on November 12, 2020 and will utilize NAICS code 236220 for evaluation.
There is no set-aside designation for this project with an estimated value between $25-100 million. The period of performance is expected to be 852 days upon award of the firm-fixed price construction contract. Interested vendors must self-identify on the beta.SAM.gov website as the government is not maintaining a separate planholders list. The wage determination attachment was updated in Amendment 0005 to reflect the current Davis County rates.
Notice text
7 versions
Update #7 · Latest ·
AMENDMENT 0005 - ATCH 5 - DB WAGE DETERMINATIONS UPDATED
AMENDMENT 0004 - REVISED SPECIFICATIONS AND DRAWINGS; AND EXTEND
AMENDMENT 0003 - EXTEND RFP
AMENDMENT 0002 - REVISED SPECIFICATIONS VOL. 1 & 2 10/22/2020; RFIs open in ProjNet until 10/27/20.
AMENDMENT 0001 - EXTEND & REVISE DAVIS BACON WAGE DETERMINATIONS 10/20/2020
TITLE OF PROJECT
The Government anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Utah Test and Training Range Consolidated Mission Control Center (UTTR CMCC).
Project Description: A Consolidated Mission Control Center with state-of-the-art equipment is needed at Hill Air Force Base (HAFB), Utah to replace outdated and inadequate facilities. A new facility built to current Air Force standards will enable the UTTR much greater flexibility in providing air traffic control services. A new facility will also provide increased capability for the necessary post-mission test evaluation processes. The UTTR CMCC has been organized to associate important functional relationships. The Mission Control Center (MCC), Air Operations Center (AOC), and Administration Offices have been arranged near Facility Support Spaces centralized in the building's layout optimizing the functional use of the building to accomplish the mission. The building shall adhere to industry standard construction methods, applicable codes, and the Hill Air Force Base Design Guide while providing an aesthetic quality and spatial relationships that promote the well-being of personnel and the success of the mission.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using NAICS Code is 236220 -- Commercial and Institutional Building Construction.The size standard is $36.5M.Product Service Code is Y1AZ - Construction of other administrative buildings and service facilities. The period of performance is currently 852 days.
The solicitation is anticipated to proceed as an unrestricted competitive procurement and is estimated to be issued on or about 10 September 2020 with proposals due tentatively on or about 12 October 2020. The RFP will be issued on the Government Point of Entry known as https://beta.sam.gov and will establish a firm proposal due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check https://beta.sam.gov frequently for any changes to the interested vendors list and notice.
Update #6 ·
AMENDMENT 0004 - REVISED SPECIFICATIONS AND DRAWINGS; AND EXTEND
AMENDMENT 0003 - EXTEND RFP
AMENDMENT 0002 - REVISED SPECIFICATIONS VOL. 1 & 2 10/22/2020; RFIs open in ProjNet until 10/27/20.
AMENDMENT 0001 - EXTEND & REVISE DAVIS BACON WAGE DETERMINATIONS 10/20/2020
TITLE OF PROJECT
The Government anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Utah Test and Training Range Consolidated Mission Control Center (UTTR CMCC).
Project Description: A Consolidated Mission Control Center with state-of-the-art equipment is needed at Hill Air Force Base (HAFB), Utah to replace outdated and inadequate facilities. A new facility built to current Air Force standards will enable the UTTR much greater flexibility in providing air traffic control services. A new facility will also provide increased capability for the necessary post-mission test evaluation processes. The UTTR CMCC has been organized to associate important functional relationships. The Mission Control Center (MCC), Air Operations Center (AOC), and Administration Offices have been arranged near Facility Support Spaces centralized in the building's layout optimizing the functional use of the building to accomplish the mission. The building shall adhere to industry standard construction methods, applicable codes, and the Hill Air Force Base Design Guide while providing an aesthetic quality and spatial relationships that promote the well-being of personnel and the success of the mission.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using NAICS Code is 236220 -- Commercial and Institutional Building Construction.The size standard is $36.5M.Product Service Code is Y1AZ - Construction of other administrative buildings and service facilities. The period of performance is currently 852 days.
The solicitation is anticipated to proceed as an unrestricted competitive procurement and is estimated to be issued on or about 10 September 2020 with proposals due tentatively on or about 12 October 2020. The RFP will be issued on the Government Point of Entry known as https://beta.sam.gov and will establish a firm proposal due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check https://beta.sam.gov frequently for any changes to the interested vendors list and notice.
Update #5 ·
AMENDMENT 0003 - EXTEND RFP
AMENDMENT 0002 - REVISED SPECIFICATIONS VOL. 1 & 2 10/22/2020; RFIs open in ProjNet until 10/27/20.
AMENDMENT 0001 - EXTEND & REVISE DAVIS BACON WAGE DETERMINATIONS 10/20/2020
TITLE OF PROJECT
The Government anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Utah Test and Training Range Consolidated Mission Control Center (UTTR CMCC).
Project Description: A Consolidated Mission Control Center with state-of-the-art equipment is needed at Hill Air Force Base (HAFB), Utah to replace outdated and inadequate facilities. A new facility built to current Air Force standards will enable the UTTR much greater flexibility in providing air traffic control services. A new facility will also provide increased capability for the necessary post-mission test evaluation processes. The UTTR CMCC has been organized to associate important functional relationships. The Mission Control Center (MCC), Air Operations Center (AOC), and Administration Offices have been arranged near Facility Support Spaces centralized in the building's layout optimizing the functional use of the building to accomplish the mission. The building shall adhere to industry standard construction methods, applicable codes, and the Hill Air Force Base Design Guide while providing an aesthetic quality and spatial relationships that promote the well-being of personnel and the success of the mission.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using NAICS Code is 236220 -- Commercial and Institutional Building Construction.The size standard is $36.5M.Product Service Code is Y1AZ - Construction of other administrative buildings and service facilities. The period of performance is currently 852 days.
The solicitation is anticipated to proceed as an unrestricted competitive procurement and is estimated to be issued on or about 10 September 2020 with proposals due tentatively on or about 12 October 2020. The RFP will be issued on the Government Point of Entry known as https://beta.sam.gov and will establish a firm proposal due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check https://beta.sam.gov frequently for any changes to the interested vendors list and notice.
Update #4 ·
AMENDMENT 0002 - REVISED SPECIFICATIONS VOL. 1 & 2 10/22/2020; RFIs open in ProjNet until 10/27/20.
AMENDMENT 0001 - EXTEND & REVISE DAVIS BACON WAGE DETERMINATIONS 10/20/2020
TITLE OF PROJECT
The Government anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Utah Test and Training Range Consolidated Mission Control Center (UTTR CMCC).
Project Description: A Consolidated Mission Control Center with state-of-the-art equipment is needed at Hill Air Force Base (HAFB), Utah to replace outdated and inadequate facilities. A new facility built to current Air Force standards will enable the UTTR much greater flexibility in providing air traffic control services. A new facility will also provide increased capability for the necessary post-mission test evaluation processes. The UTTR CMCC has been organized to associate important functional relationships. The Mission Control Center (MCC), Air Operations Center (AOC), and Administration Offices have been arranged near Facility Support Spaces centralized in the building's layout optimizing the functional use of the building to accomplish the mission. The building shall adhere to industry standard construction methods, applicable codes, and the Hill Air Force Base Design Guide while providing an aesthetic quality and spatial relationships that promote the well-being of personnel and the success of the mission.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using NAICS Code is 236220 -- Commercial and Institutional Building Construction.The size standard is $36.5M.Product Service Code is Y1AZ - Construction of other administrative buildings and service facilities. The period of performance is currently 852 days.
The solicitation is anticipated to proceed as an unrestricted competitive procurement and is estimated to be issued on or about 10 September 2020 with proposals due tentatively on or about 12 October 2020. The RFP will be issued on the Government Point of Entry known as https://beta.sam.gov and will establish a firm proposal due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check https://beta.sam.gov frequently for any changes to the interested vendors list and notice.
Update #3 ·
AMENDMENT 0002 - REVISED SPECIFICATIONS VOL. 1 & 2 10/22/2020
AMENDMENT 0001 - EXTEND & REVISE DAVIS BACON WAGE DETERMINATIONS 10/20/2020
TITLE OF PROJECT
The Government anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Utah Test and Training Range Consolidated Mission Control Center (UTTR CMCC).
Project Description: A Consolidated Mission Control Center with state-of-the-art equipment is needed at Hill Air Force Base (HAFB), Utah to replace outdated and inadequate facilities. A new facility built to current Air Force standards will enable the UTTR much greater flexibility in providing air traffic control services. A new facility will also provide increased capability for the necessary post-mission test evaluation processes. The UTTR CMCC has been organized to associate important functional relationships. The Mission Control Center (MCC), Air Operations Center (AOC), and Administration Offices have been arranged near Facility Support Spaces centralized in the building's layout optimizing the functional use of the building to accomplish the mission. The building shall adhere to industry standard construction methods, applicable codes, and the Hill Air Force Base Design Guide while providing an aesthetic quality and spatial relationships that promote the well-being of personnel and the success of the mission.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using NAICS Code is 236220 -- Commercial and Institutional Building Construction.The size standard is $36.5M.Product Service Code is Y1AZ - Construction of other administrative buildings and service facilities. The period of performance is currently 852 days.
The solicitation is anticipated to proceed as an unrestricted competitive procurement and is estimated to be issued on or about 10 September 2020 with proposals due tentatively on or about 12 October 2020. The RFP will be issued on the Government Point of Entry known as https://beta.sam.gov and will establish a firm proposal due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check https://beta.sam.gov frequently for any changes to the interested vendors list and notice.
Update #2 ·
AMENDMENT 0001 - EXTEND & REVISE DAVIS BACON WAGE DETERMINATIONS 10/20/2020
TITLE OF PROJECT
The Government anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Utah Test and Training Range Consolidated Mission Control Center (UTTR CMCC).
Project Description: A Consolidated Mission Control Center with state-of-the-art equipment is needed at Hill Air Force Base (HAFB), Utah to replace outdated and inadequate facilities. A new facility built to current Air Force standards will enable the UTTR much greater flexibility in providing air traffic control services. A new facility will also provide increased capability for the necessary post-mission test evaluation processes. The UTTR CMCC has been organized to associate important functional relationships. The Mission Control Center (MCC), Air Operations Center (AOC), and Administration Offices have been arranged near Facility Support Spaces centralized in the building's layout optimizing the functional use of the building to accomplish the mission. The building shall adhere to industry standard construction methods, applicable codes, and the Hill Air Force Base Design Guide while providing an aesthetic quality and spatial relationships that promote the well-being of personnel and the success of the mission.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using NAICS Code is 236220 -- Commercial and Institutional Building Construction.The size standard is $36.5M.Product Service Code is Y1AZ - Construction of other administrative buildings and service facilities. The period of performance is currently 852 days.
The solicitation is anticipated to proceed as an unrestricted competitive procurement and is estimated to be issued on or about 10 September 2020 with proposals due tentatively on or about 12 October 2020. The RFP will be issued on the Government Point of Entry known as https://beta.sam.gov and will establish a firm proposal due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check https://beta.sam.gov frequently for any changes to the interested vendors list and notice.
Update #1 ·
TITLE OF PROJECT
The Government anticipates issuing a Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for the Utah Test and Training Range Consolidated Mission Control Center (UTTR CMCC).
Project Description: A Consolidated Mission Control Center with state-of-the-art equipment is needed at Hill Air Force Base (HAFB), Utah to replace outdated and inadequate facilities. A new facility built to current Air Force standards will enable the UTTR much greater flexibility in providing air traffic control services. A new facility will also provide increased capability for the necessary post-mission test evaluation processes. The UTTR CMCC has been organized to associate important functional relationships. The Mission Control Center (MCC), Air Operations Center (AOC), and Administration Offices have been arranged near Facility Support Spaces centralized in the building's layout optimizing the functional use of the building to accomplish the mission. The building shall adhere to industry standard construction methods, applicable codes, and the Hill Air Force Base Design Guide while providing an aesthetic quality and spatial relationships that promote the well-being of personnel and the success of the mission.
In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using NAICS Code is 236220 -- Commercial and Institutional Building Construction.The size standard is $36.5M.Product Service Code is Y1AZ - Construction of other administrative buildings and service facilities. The period of performance is currently 852 days.
The solicitation is anticipated to proceed as an unrestricted competitive procurement and is estimated to be issued on or about 10 September 2020 with proposals due tentatively on or about 12 October 2020. The RFP will be issued on the Government Point of Entry known as https://beta.sam.gov and will establish a firm proposal due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The only INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via https://beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check https://beta.sam.gov frequently for any changes to the interested vendors list and notice.
Attachments
Show all 17
Notice history
| Notice | Type | Posted |
|---|---|---|
| UTTR CMCC at Hill AFB, UT | Award Notice | |
| UTTR CMCC at Hill AFB, UT | Solicitation | |
| UTTR CMCC at Hill AFB, UT | Pre-Solicitation | |
| UTTR CMCC at Hill AFB, UT | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity