This document provides information on an upcoming federal contract opportunity for construction services. The U.S. Army Corps of Engineers intends to issue a Request for Proposal to award a firm-fixed-price construction contract between $25 million and $100 million for an 852-day period of performance. The project involves building a new Consolidated Mission Control Center facility at Hill Air Force Base in Utah to replace outdated equipment and facilities currently used by the Utah Test and Training Range for air traffic control and post-mission test evaluation services. Interested vendors should monitor the beta.SAM.gov website for release of the RFP anticipated around September 10, 2020, with proposals due tentatively on October 12, 2020. Contractors are responsible for self-identifying as interested vendors on the website.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09 September 2019
(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)
SIGNATURE:
PREPARED BY: Taylor Brimberry (ASB#-6727, PB#-2546)
DEMOLISH BUILDING
THIS REPORT IS NOT TO BE USED FOR BIDDING PURPOSES
ORGANIZATION:
REQUESTED:
6471326
RICHARD NEHRING
75 CEG
FACILITY CONSTRUCTION DATE:
WORK TASK#:
FACILITY:
REQUESTER:
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
LEAD BASED PAINT
ASBESTOS
LIMITED INSPECTION REPORT
Utah Certified State Inspector: Raudel Arteaga (ASB#-5863: Expires-30 November 2019, PB#-2244: Expires-11 January 2020)
INSPECTION DATE: 13 September 2019
Reference UDAQ R307-807-6
ASBESTOS
Assumed
Assumed
3% Chrysotile
6% Chrysotile
Assumed
Assumed
50 Linear Feet Attic
Roof Decking, Black Non-Friable Category I 60 Square
Feet Fire Riser Room
Roof Flashing, Black Non-Friable Category I 250 Linear
Feet Roof Flashings and Curbs
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
The quantities within this report are estimates and are not to be used for bidding purposes.
SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND
MATERIAL TYPE
Attic, Pipe Chases and North Exterior Of Building
*RACM
*Category I *Category II
FRIABILITY QUANTITY
40 Linear Feet
Demolish Building.Statement of Work:
Non-Friable Category II 1,500 Square
Feet
Exterior Of The Building, Dock Edges and Exterior Walls Of The
Building
Thermal System Pipe Insulation Lagging, White/Yellow Friable RACM
Floor Tile/ Adhesive, Black
Non-Friable
LIMITED ASBESTOS INSPECTION REPORT INFORMATION
Category I 100 Square
Feet Gym Area
Block Filler Paint, Brown/Concrete
This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering Laboratory (AIHA Acc.#-
101572) at Hill Air Force Base, Utah (R307-801-10.8.a-b).
Thermal System Pipe Fittings, White
*LOCATIONS FOUND
RACMFriable
Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area (R307-801-9-4).
A total of 81 22
Block Filler Paint, Brown/Concrete Block Filler Paint, Tan/Block Block Filler Paint, White/Block Thermal System Pipe Insulation, White/Yellow
Thermal System Pipe Insulation, Cloth/Yellow Thermal System Pipe Insulation Lagging, White/Yellow Thermal System Pipe Fitting Insulation, White/Yellow Vibration Collar, Black
Roof Sound Board, Brown Fire Caulking, Off-White/Black
2'x4' Ceiling Tile, Wormygrooves/Pinholes, White Roof Batt Insulation, Foil/Pink Wall Batt Insulation, Foil/Pink Duct Insulation, Foil/Pink
Flex Duct Insulation, Black/Pink 12" Floor Tile, Light Grey/Adhesive, Yellow 12" Floor Tile, Grey/Adhesive, Yellow Block Filler Paint, Tan/Concrete
2'x4' Ceiling Tile, Pockmarks/Pinholes, White12" Acoustical Wall Tile, Wormygrooves/Pinholes, Table 1
MATERIAL TYPE
Per Hill AFB requirements, all materials containing any detectable amount of asbestos shall be handled as Asbestos Containing Material (ACM). Table 2 shows the summary of materials containing ≤1% that were identified via "Point Counting". Per EPA/UDAQ
≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and 29CFR
1910.1001
QUANTITY
N/A
Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).
The following is a list of the "Suspect Materials" that were sampled as part of this inspection:
N/A
Table 2.
ASBESTOS
suspect materials assessed as part of the inspection.samples reference the
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.
Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.
Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
*LOCATIONS FOUND
N/A N/A
Table 3.
Drywall/Joint Compound Wall System Drywall/Joint Compound Ceiling System
*Per UDAQ definition.
Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116 this information is summarized in Table 2.
2'x4' Ceiling Tile, Wormygrooves/Pinholes Pattern, White, Multiple Locations, 7,100
Square Feet
GM192526
West Center, Hallway
Outside Room 2 None Detected
GM192527 Northeast, Room 7 None Detected
GM192528
Center, Hallway Outside
Room 7 None Detected
GM192529 South Center, Room 8 None Detected GM192530 Center, West Entry None Detected GM192531 Southwest, Room 20 None Detected
Center, Room 8A None Detected GM192523 North Center, Room 17 None Detected GM192524 Northeast, Room 20 None Detected GM192525 East Center, Room 2 None Detected
The following table summarizes the sampling data.
Homogenous Building Material, Description, Location, Quantity.
GM192506 Northeast, Break Room
GM192517 Northwest, Room 4 None Detected
GM192518 Center, Room 2 None Detected
None Detected
GM192503 Southwest, Room 19 None Detected Northeast, Room 20 None Detected
GM192505 Southeast, Electrical Room None Detected
GM192500 Northeast, Room 7 None Detected GM192501 Southwest, Room 8
12" Acoustical Wall Tile, Wormygrooves/Pinholes Pattern, White Over Puck, Brown, Multiple Locations, 3,200 Square
Feet
GM192516 East Center, Room 6 None Detected
Drywall/Joint Wall System, Multiple Locations, 45,000 Square Feet
Drywall/Joint Compound Ceiling System, Multiple Locations, 2,000 Square Feet
None Detected
GM192508 Northwest, Main Entry None Detected GM192509 Southwest, Room 1 None Detected
GM192511
GM192513 Northwest, North Entry None Detected
GM192514
North, Garage Server
Room None Detected
GM192504
GM192507 Southwest, Main Hallway
GM192515
ResultsSample Location
South Center, Janitor's Closet
None Detected
GM192510
Northeast, Hallway Outside Restroom
None Detected
None Detected Southeast, Hallway
Outside Room 8
GM192512
GM192519
East, Hallway Outside
Room 6 None Detected
2'x4' Ceiling Tile, Pockmarks/Pinholes Pattern, White, Multiple Locations, 7,100 Square Feet
GM192520 East Center, Room 7 None Detected GM192521 Southeast, Room 8 None Detected
GM192522
None Detected
Sample #
Southeast, Room 6
None Detected GM192502 Northeast, Room 17 None Detected
GM192574 East Center None Detected
GM192567 Center 6% Chrysotile
Vibration Collar, Black, Attic Mezzanine, 75 Linear Feet
GM192571 East None Detected
GM192572 Center None Detected
Thermal System Pipe Fitting Insulation, White Over Yellow, Attic Mezzanine, 50 Linear Feet
GM192568 Center 6% Chrysotile GM192569 Center 5% Chrysotile
GM192570 Center None Detected
Thermal System Pipe Insulation Lagging, White Over Yellow, Attic, 100 Linear Feet
GM192573 Center None Detected
GM192561 South Center None Detected Block Filler Paint, White Over Block, Janitor's
Closet, 5,000 Square Feet
Thermal System Pipe Insulation, Cloth Over Yellow, Attic, 800 Linear Feet
GM192562 Center None Detected GM192563 North Center None Detected GM192564 Center None Detected
Thermal System Pipe Insulation, White Over Yellow, Attic, 1,500 Linear Feet
GM192565 North Center None Detected GM192566 South Center None Detected
GM192558 Southwest 2% Chrysotile Block Filler Paint, Tan Over Block, Exterior Of
Building, 1,000 Square Feet GM192559 East Center None Detected
GM192560 East Center None Detected
GM192551 South Center None Detected GM192552 Northeast None Detected
Block Filler Paint, Tan Over Concrete, Exterior Of Building, 65,000 Square Feet
Block Filler Paint, Brown Over Concrete, Exterior Of Building, 1,500 Square Feet
GM192553 Southeast None Detected GM192554 West Center None Detected GM192555 Southwest None Detected
12" Floor Tile, Grey Over Adhesive, Yellow, Break Room, 80 Square Feet
GM192556 East Center None Detected GM192557 West Center 3% Chrysotile
South Center None Detected GM192545 Southeast None Detected GM192546 Center None Detected
12" Floor Tile, Light Grey Over Adhesive, Yellow, Break Room, 80 Square Feet
GM192547 Northeast None Detected GM192548 Northwest None Detected GM192549 South Center None Detected
Flex Duct Insulation, Black Over Pink, Attic, 800 Linear Feet
GM192550 West Center None Detected
GM192537 Center None Detected
Duct Insulation, Foil Over Pink, Attic, 1,500 Linear Feet
GM192541 East Center None Detected GM192542 East Center None Detected GM192543 North Center None Detected
Wall Batt Insulation, Foil Over Pink, Attic, 10,000 Square Feet
GM192538 South Center None Detected GM192539 Southeast None Detected GM192540 West Center None Detected
GM192544
Roof Batt Insulation, Foil Over Pink, Attic, 14,200 Square Feet
GM192532 Center None Detected GM192533 East Center None Detected GM192534 South Center None Detected GM192535 South Center None Detected GM192536 North Center None Detected
GM192580 West Center None Detected
Fire Caulking, Off-White Over Black, Attic Mezzanine, 10 Square Feet
GM192576 Center None Detected GM192577 South Center None Detected GM192578 West Center None Detected
Roof Sound Board Insulation, Brown, Attic, 1,000 Square Feet
GM192575 Center None Detected
GM192579 West Center None Detected
Cell: (801)430-3976 Supervisor: Traver Andreasen: DSN: (801)586-7094
Asbestos/LBP Shop 75 CES(CEOHA)
Asbestos/LBP Shop Personnel
DSN:(801)777-8006
CONTACT INFORMATION
Table 4.
POTENTIAL FOR ADDITIONAL MATERIALS:
This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of inspection (see title page for inspection date). Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.
Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance/assessment.
SCOPE OF WORK:
XL Number Substrate Component Color Lead Reading Paint
Condition 1520 Metal Handrail Brown 5.19 Fair 1566 Ceramic 4" Wall Tile Yellow 6.66 Good 1572 Ceramic 4" Wall Tile Yellow 5.46 Good 1580 Ceramic 4" Floor Tile Yellow 4.89 Poor 1582 Metal Handrail Brown 2.70 Fair 1593 Metal Handrail Brown 2.07 Poor 1594 Metal Dock Post Brown 3.08 Poor
5-This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of the inspection (see title page for date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.
LIMITED LEAD-BASED PAINT IDENTIFICATION REPORT INFORMATION
Table 1.
DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
1-Table 1 below, summarizes the painted/coated building components that tested positive for Lead Based Paint/Coating. These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.
2-The condition column is the condition only of the painted/coated component (See final page for all readings/samples).
Demolish Building.
3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead.
All other components tested were less than 0.80 mg/cm².
4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions concerning this report, contact the Asbestos/LBP Shop: Traver Andreasen at 586-7094.
Building: 1276 WT/CP# 6471326 Date: 13 September 2019
1481 1.02 1607 0.89 1482 1.16 1608 0.87
1483 0.95 POS 1609 0.94
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS
Center Fair Silver 0.01 NEG Center Poor Brown 0.03 NEG Center Poor Silver 0.01 NEG Center Fair Silver 0.02 NEG Center Fair Red 0.71 NEG Center Fair Green 0.02 NEG Center Good Blue 0.04 NEG South Good Brown 0.01 NEG South Good Tan 0.07 NEG South Good Green 0.03 NEG South Good Green 0.02 NEG West Good Brown 0.01 NEG West Good Brown 0.01 NEG East Good Tan 0.01 NEG West Good Brown 0.01 NEG West Good Green 0.01 NEG East Good White 0.10 NEG East Good Grey 0.01 NEG East Good Brown 0.01 NEG
Center Fair Grey 0.12 NEG West Good Off-White 0.01 NEG South Good Off-White 0.01 NEG North Good Off-White 0.01 NEG North Good Off-White 0.01 NEG North Good Brown 0.01 NEG North Good Brown 0.01 NEG South Good Grey 0.01 NEG South Good White 0.01 NEG East Good Brown 0.01 NEG East Good Brown 0.01 NEG
Per 20 Second Reading
Calibration Range
Substrate
North Garage Restroom Wood Wood
Door CasingNorth Garage Restroom
Attic Pipe Support Bracket Metal
1513 Door Jamb
Post Calibration
PbL (mg/cm²)XRF Analyzer XL3t 300 (Serial #96588)
Per 20 Second Reading
1485 Attic Handrail Metal 1484 Attic Expansion Tank Metal
Pre Calibration PbL (mg/cm²) Calibration
Range Model# Serial #
XL Number Room/Area Structure
1486 Attic Landing Structural Steel Angle Metal
1489 Attic Pump Motor Metal 1488 Attic Pump Metal
1491 Room 4 Door Frame Metal 1490 Attic Pump Motor Metal
1493 Room 4 Suspended Floor Stand Metal 1492 Room 4 Door Metal
1495 Room 4 Door Jamb Metal 1494 Room 4 Suspended Floor Plate Metal
1497 Room 4 Wall Drywall 1496 Room 4 Door Metal
1499 Room 4 Equipment Metal 1498 Room 4 Equipment Metal
1501 Room 4 East Room Door Jamb Metal 1500 Room 4 East Room Wall Concrete
1503 North Garage Floor Concrete 1502 Room 4 East Room Door Jamb Metal
1505 North Garage Server Room Wall Concrete 1504 North Garage Server Room Wall Block
1506 North Garage Server Room Ceiling Drywall
1509 North Garage Server Room Door Metal 1508 North Garage Server Room Door Jamb Metal
1511 North Garage Restroom Wall Drywall 1510 North Garage Restroom Wall Drywall
1507 North Garage Server Room Trim Wood
1481 1.02 1607 0.89 1482 1.16 1608 0.87
1483 0.95 POS 1609 0.94
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS East Good Brown 0.01 NEG
South Good Brown 0.01 NEG North Good Grey 0.02 NEG North Good Grey 0.34 NEG North Good White 0.13 NEG North Good Brown 0.01 NEG East Fair Brown 5.19 POS East Fair Grey 0.02 NEG East Fair Grey 0.49 NEG East Good Grey 0.01 NEG
South Poor Red 0.01 NEG South Poor Black 0.01 NEG West Good Grey 0.01 NEG West Good Grey 0.01 NEG South Good White 0.01 NEG West Good Off-White 0.01 NEG West Good Grey 0.01 NEG West Good Varnish 0.01 NEG West Good Tan 0.01 NEG East Good Tan 0.01 NEG East Good Varnish 0.01 NEG East Good Brown 0.01 NEG East Good Brown 0.02 NEG East Good Grey 0.01 NEG East Good White 0.01 NEG East Good Green 0.01 NEG East Good Grey 0.01 NEG East Good Tan 0.01 NEG West Good Blue 0.02 NEG South Good Green 0.01 NEG
1542 Room 16 Chair Rail Wood 1543 Room 16 Wall Wall Paper
1539 Room 19 Wall Drywall 1540 Room 19 Door Jamb Metal 1541 Room 19 Door Jamb Metal
1536 Room 21 Door Jamb Metal 1537 Room 19 Wall Drywall 1538 Room 19 Chair Rail Wood
1533 Room 21 Drywall Drywall 1534 Room 21 Chair Rail Wood 1535 Room 21 Wall Drywall
1530 Room 20A Door Jamb Metal 1531 Room 20A Door Wood 1532 Room 20A Door Jamb Metal
1527 West Entry Door Metal 1528 West Entry Wall Drywall 1529 Room 20A Wall Drywall
1524 Southeast Storage Room Floor Line Concrete 1525 Southeast Storage Room Floor Line Concrete 1526 West Entry Door Jamb Metal
1521 Southeast Storage Room Rollup Door Channel Metal 1522 Southeast Storage Room Rollup Door Metal 1523 Southeast Storage Room Wall Casing Metal
1518 Northeast Gym Wall Drywall 1519 Northeast Gym Chair Rail Wood 1520 Exterior Handrail Metal
1515 North Garage Wall Concrete 1516 North Garage Rollup Door Frame Metal 1517 North Garage Rollup Door Metal
Per 20 Second Reading
Per 20 Second Reading
XL Number Room/Area Structure Substrate 1514 North Garage Restroom Door Wood
Pre Calibration PbL (mg/cm²) Calibration
Range Model# Serial # Post
Calibration PbL
(mg/cm²) Calibration
RangeXRF Analyzer XL3t 300 (Serial #96588)
1481 1.02 1607 0.89 1482 1.16 1608 0.87
1483 0.95 POS 1609 0.94
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS East Good Lacquer 0.06 NEG West Good Blue 0.08 NEG West Good Lacquer 0.01 NEG West Good White 0.03 NEG
Center Good White 0.08 NEG West Good Grey 0.01 NEG North Good White 0.06 NEG North Good White 0.12 NEG West Good White 0.20 NEG West Good White 0.27 NEG West Good White 0.29 NEG West Good White 0.01 NEG West Good White 0.01 NEG South Good Grey 0.01 NEG West Good Red 0.34 NEG West Good White 0.60 NEG South Good White 0.01 NEG West Good Tan 0.01 NEG
Center Good Tan 0.01 NEG North Good Tan 0.01 NEG East Good White 0.01 NEG East Good White 0.01 NEG
South Good Yellow 6.66 POS Center Good Yellow 0.01 NEG Center Good Yellow 0.01 NEG South Good Tan 0.01 NEG South Good White 0.01 NEG Center Good Light Yellow 0.01 NEG South Good Yellow 5.46 POS Center Good Yellow 0.01 NEG
1571 Men's Restroom Ceiling Drywall 1572 Men's Restroom 4" Wall Tile Ceramic 1573 Men's Restroom 2" Floor Tile Ceramic
1568 Janitor's Closet 2" Floor Tile Ceramic 1569 Janitor's Closet 4" Wall Tile Ceramic 1570 Janitor's Closet Wall Ceramic
1565 Women's Restroom Ceiling Drywall 1566 Janitor's Closet 4" Wall Tile Ceramic 1567 Janitor's Closet 1" Floor Tile Ceramic
1562 Women's Restroom 12" Floor Tile Ceramic 1563 Women's Restroom Partition Metal 1564 Women's Restroom Wall Drywall
1559 Electrical Room Wall Board Wood 1560 Electrical Room Wall Board Wood 1561 Women's Restroom 4" Wall Tile Ceramic
1556 Storage Closet Header Wood 1557 Room 2 Wall Drywall 1558 Electrical Room Wall Board Wood
1553 Storage Closet Door Wood 1554 Storage Closet Door Jamb Wood 1555 Storage Closet Header Wood
1550 Break Room Wall Drywall 1551 Break Room Chair Rail Wood 1552 Storage Closet Casing Wood
1547 Hall Wall Block 1548 Hall Ceiling Drywall 1549 Room 8A Wall Drywall
1544 Room 12 Hall Chair Rail Wood 1545 Room 14 Wall Drywall 1546 Room 14 Chair Rail Wood
PbL (mg/cm²)
Calibration RangeXRF Analyzer XL3t 300 (Serial #96588)
Per 20 Second Reading
Per 20 Second Reading
XL Number Room/Area Structure Substrate
Pre Calibration PbL (mg/cm²) Calibration
Range Model# Serial # Post
1481 1.02 1607 0.89 1482 1.16 1608 0.87
1483 0.95 POS 1609 0.94
Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS
Center Good Yellow 0.01 NEG North Good Yellow 0.01 NEG North Good Brown 0.01 NEG South Good White 0.01 NEG South Good White 0.05 NEG East Good Grey 0.03 NEG
North Poor Yellow 4.89 POS North Poor White 0.40 NEG West Fair Brown 2.70 POS West Fair Tan 0.01 NEG West Fair Tan 0.07 NEG West Poor Brown 0.01 NEG West Poor Brown 0.01 NEG West Good Brown 0.01 NEG West Good Brown 0.01 NEG West Fair Tan 0.61 NEG West Poor Brown 0.01 NEG West Poor Yellow 0.01 NEG South Poor Brown 0.17 NEG South Poor Brown 2.07 POS South Poor Brown 3.08 POS East Poor Brown 0.02 NEG East Poor Brown 0.02 NEG North Fair Black 0.09 NEG North Poor Brown 0.01 NEG North Brown 0.01 NEG1599 Fire Riser Room FDC Connection Metal
1596 Exterior Stair Handrail Metal 1597 Exterior Gate Metal 1598 Exterior Tank Bollard Metal
1593 Exterior Handrail Metal 1594 Exterior Dock Post Metal 1595 Exterior Stair Stringer Metal
1590 Exterior Dock Edge Concrete 1591 Exterior Dock Edge Concrete 1592 Exterior Handrail Metal
1587 Exterior Door Jamb Metal 1588 Exterior Door Metal 1589 Exterior Down Spout Metal
1584 Exterior Wall Concrete 1585 Exterior Wall Concrete 1586 Exterior Wall Block
1581 Room 23 4" Floor Tile Concrete 1582 Exterior Handrail Metal 1583 Exterior Wall Stucco
1578 Men's Restroom Sink Ceramic 1579 Men's Restroom Dispenser Metal 1580 Room 23 4" Floor Tile Concrete
1575 Men's Restroom Partition Metal 1576 Men's Restroom Partition Metal 1577 Men's Restroom Urinal Ceramic
Per 20 Second Reading
Per 20 Second Reading
XL Number Room/Area Structure Substrate 1574 Men's Restroom 1" Floor Tile Ceramic
Pre Calibration PbL (mg/cm²) Calibration
Range Model# Serial # Post
Calibration PbL
(mg/cm²)
RangeXRF Analyzer XL3t 300 (Serial #96588)
| Title Page |
| Asbestos |
| LBP |
| Readings |
| 2019-10-16T12:19:23-0600 | |
| BRIMBERRY.TAYLOR.MIKE.1543589558 |
| GM192505: |
| Southeast Electrical Room: |
| None Detected: |
| GM192507: |
| Southwest Main Hallway: |
| None Detected_2: |
| GM192510: |
| None Detected_3: |
| GM192512: |
| None Detected_4: |
| GM192514: |
| None Detected_5: |
| GM192519: |
| None Detected_6: |
| GM192526: |
| None Detected_7: |
| GM192528: |
| None Detected_8: |
| GM192559: |
| East Center: |
| None Detected_9: |
| Range 8 to 12: |
| Range 8 to 12_2: |
| Range 8 to 12_3: |
| Range 8 to 12_4: |
| PoorFDC Connection: |
File details come from the government source that posted it. Updated .