Utility Tray

Closed Solicitation Posted

Solicitation number
494232
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
332322 Sheet Metal Work Manufacturing
Place of performance
Oak Ridge, Tennessee 37830, United States

Notice details come from SAM.gov. Updated .

About this opportunity

UT-Battelle, LLC, the management and operations contractor for Oak Ridge National Laboratory (ORNL), seeks fabrication and delivery of one Shortened 60D Utility Tray, a custom stainless steel assembly for electrical distribution and fluid routing, with proposals due September 17, 2026, and questions due September 14.

This is a fixed-price subcontract with no small business set-aside, flowing down from DOE prime contract DE-AC05-00OR22725. Place of performance is Oak Ridge, Tennessee. The NAICS code is 332322 (Sheet Metal Work Manufacturing); PSC is 5340 (Hardware, Commercial). Estimated delivery is November 2027 on a Delivered-At-Place basis, with the seller bearing all shipping costs and liability to destination.

The utility tray comprises three welded stainless steel sub-assemblies (Source End, 60-degree transition, and Collection End) approximately 9.5 inches tall, designed to distribute 120/208V and 480V electrical power, cooling water (20–25 GPM at 60–80 PSIG), and compressed gases. Construction must comply with ASME B31.3 piping code, AWS welding standards, UL-508A electrical panel standards, and NEC/OSHA regulations. All welding requires certified welders and inspectors; all electrical equipment requires NRTL certification to U.S. standards. Materials include AISI 304 and 316 stainless steel, copper Type L tubing for water, and 316 stainless steel tubing for gases. Prior to fabrication, the seller must submit and obtain approval of a Manufacturing and Inspection Plan, fabrication drawings, bills of materials, and electrical schematics. Factory Acceptance Test Results, NRTL certifications, as-built drawings, and a Contractor Release Note are required before shipment. All documentation must be in English, metric units (except trade-size components), and searchable PDF or SolidWorks format. The completed tray carries a 24-month warranty against material and manufacturing defects.

Technical evaluation criteria, in descending order of importance, are Manufacturing/Fabrication Plan and Proposed Improvements/Exception List; Company Experience/Past Performance; Project Management and Adherence/Compliance to Codes and Standards; Personnel Experience and Qualifications; and Quality Assurance Program. Technical proposals must not exceed 15 pages excluding resumes and must demonstrate thorough understanding of all requirements. Offerors must provide evidence of ISO-9001 certification or equivalent Quality Assurance Program documentation. Cost proposals must itemize direct labor (with fully burdened rates and hours), materials and equipment (with supplier quotes or catalog documentation), subcontracts, travel, other direct costs, and indirect expenses. Awards are made to the responsible offeror providing best value with technical merit weighted more heavily than cost. Proposals exceeding $15,000 require completion of Representations and Certifications—Abbreviated (BSD-CS-2260); large business offers of $900,000 or more must include Small Business Subcontracting Plans. Payment terms are Net 30 days (large business) or Net 15 days (small business) via electronic funds transfer upon final acceptance. Proposal validity period is 120 days. The Procurement Officer is Mckenzi Baz (bazmk@ornl.gov, 865-576-6063).

Notice text

UT-Battelle, LLC (the Company), is the Management & Operations contractor for the Oak Ridge National Laboratory (ORNL) located in Oak Ridge, TN. The Company is seeking proposals for a Utility Tray in support of a Department of Energy (DOE) funded project.
 
Request for Proposal - Utility Tray - PR494232
Attachment A1 - E2-10-ES00123 Rev 0 SOW Shortened 60D Utility Tray
Attachment A2 - EX-10-ES00012 Rev 4 Technical Specification for a 90 Degree, Extended Version, and Shortened Version Utility Tray
Attachment A3 - EX-00-ES00086_R0_General Project Technical Specification
Attachment B1 - E1-10-ES00102 ES Supplement - E1 Panel D Bill of Materials
Attachment B2 - E2-10-D00122_R0 - 60D Master Facility to Machine Utilities - Bill of Materials for EX-10-6000 Assembly
Attachment C - E1-10-D00100-00 Electrical Single Line Diagrams - Panel D and Utility Tray - DRAFT
Attachment D - Placeholder for Shortened Utility Tray_EX-10-60000 Rev F - RFQ Print Package
Attachment E - Exhibit 2, Representations of Limited Rights Data and Restricted Computer Software
Attachment F - Terms and Conditions - Fixed Price - BSD-CS-2150
Attachment G - UT-Battelle Prime Supplemental Flowdown Document - Additional Terms and Conditions for Subcontracts Purchase Orders under Prime Contract No. DE-AC05-00OR22725 - BSD-CS-2258
Attachment H1 - Representations and Certifications - Abbreviated - BSD-CS-2260
Attachment H2 - Representations and Certifications - International - BSD-CS-2123
Attachment I1 - Milestone Payments
Attachment I2 - Exhibit 1C - Patent Rights - Retention by the Seller - Short Form
Attachment I3 - Exhibit 3 - Authorization and Consent
Attachment I4 - Exhibit 9 - Technical Data
Attachment I5 - Exhibit 17 - Rights to Proposal Data - Technical
 

Files

File Type Posted
Request for Proposal - Utility Tray - PR494232_V1.pdf PDF
Attachment B1 - E1-10-ES00102 ES Supplement - E1 Panel D BIll of Materials.pdf PDF
Attachment C - E1-10-D00100-00 Electrical Single Line Diagrams - Panel D and Utility Tray -DRAFT.pdf PDF
Attachment D - Placeholder for Shortened Utility Tray_EX-10-60000 Rev F - RFQ Print Package.pdf PDF
Attachment I2 - Exhibit 1C - Patent Rights - Retention by the Seller - Short Form.pdf PDF
Attachment I3 - Exhibit 3 - Authorization and Consent.pdf PDF
Attachment I5 - Exhibit 17 - Rights to Proposal Data - Technical.pdf PDF
Attachment A3 - EX-00-ES00086_R0_General Project Technical Specification.pdf PDF
Attachment E - Exhibit 2 - Rep Limited Rights Data Restricted Computer Software.pdf PDF
Attachment G - UT-Battelle Prime Supplemental Flowdown Document.pdf PDF
Attachment I1 - Milestone Payments.pdf PDF
Attachment I4 - Exhibit 9 - Technical Data.pdf PDF
Request for Proposal - Utility Tray - PR494232.pdf PDF
Attachment A1 - E2-10-ES00123 Rev 0 SOW Shortened 60D Utility Tray.pdf PDF
Attachment A2 -EX-10-ES00012 Rev 4 Technical Specification for a 90 Degree Extended Ver. and Shortened Ver. Utility Tray.pdf PDF
Attachment B2 - E2-10-D00122-R0 - 60D Master Facility to Machine Utilities - Bill of Materials for EX-10-60000 Assembly.pdf PDF
Attachment F - Terms and Conditions - Fixed Price - BSD-CS-2150.pdf PDF
Attachment H1 - Representations and Certifications - Abbreviated_Utility Trays.pdf PDF
Attachment H2 - Representations and Certifications - International_Utility Trays.pdf PDF
Show all 19

Similar open opportunities

Opportunity Agency Set-aside Responses due
Request for Proposal Neptune Cask Interface System Oak Ridge, Tennessee 37830, United States · NAICS 332999 Department of Energy No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity