Attachment A1 - E2-10-ES00123 Rev 0 SOW Shortened 60D Utility Tray.pdf
PDF 757 KB Posted
- Attached to
- Utility Tray
- Solicitation number
- 494232
- Issued by
-
Department of Energy
About this file
This is a Statement of Work (SOW) for the design, fabrication, assembly, inspection, testing, and delivery of one Shortened Utility Tray 60D for Oak Ridge National Laboratory (ORNL), a Department of Energy (DOE) funded initiative managed by UT-Battelle, LLC. The utility tray is a custom-fabricated component designed to interface with a larger system for production at ORNL, providing support and routing for AC power, utility cooling water, and gas fluid lines, along with a work surface. The estimated delivery date is November 2027, with the final delivery schedule to be confirmed at purchase order award. Project pricing will be fixed-price on a Delivery-At-Place (DAP) basis to Oak Ridge, Tennessee, making the seller responsible for all shipment coordination, costs, and liability to the delivery destination.
The seller's responsibilities include performing limited design work, procuring all components, managing fabrication and assembly, conducting comprehensive inspections and testing per applicable codes and standards, and providing extensive documentation. Key work tasks include evaluating the design for conformance with relevant standards and codes, proposing required design changes for written company approval, and executing procurement, fabrication, and testing activities. All welding must be performed per AWS standards with certified welders and inspectors; equipment must have NRTL certification to U.S. standards. The seller must prepare and obtain approval for a Manufacturing and Inspection Plan prior to fabrication, submit Factory Acceptance Test Results, NRTL certifications, finished as-built drawings with Bill of Materials, and a Contractor Release Note before shipment. Documentation must be submitted according to Appendix A's submittal schedule, with many items requiring company approval prior to fabrication or use. The seller must also ensure all contract requirements are flowed down to subsuppliers and is responsible for coordinating Field Evaluations for components lacking proper NRTL certification. Storage of finished products may be postponed up to 60 days at no additional cost to the seller.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for a Shortened 60D Utility Tray
Doc Number: E2-10-ES00123
Revision: 00
AUTHOR:
Name: Pamela Smith Title: Project Expeditor/Engineer
Date
REVIEWERS:
Name: Zach Riter Title: Mechanical Design Engineer
Name: Chad Hasbrouck UCNI Reviewing Official
APPROVER:
Name: Seth Wilder Title: Group Leader, Plasma Enrichment Deployment & Engineering
Statement of Work – Shortened 60D Utility Tray
E2-10-ES00123, Rev 00
CHANGE HISTORY
REV. DESCRIPTION
REVISION
TYPE
Major Minor
00 Initial Issue ☒ ☐
TABLE OF CONTENTS
1. Introduction
2. Scope
3. References, Acronyms and Applicable Documents
3.1 References
3.2 Acronyms & Definitions
3.3 Applicable Documents
4. Performance Requirements
4.1 Work Tasks
4.2 Project Management
4.3 Data Management
5. Quality Assurance
5.1 Process Monitoring
5.2 Access for Source Surveillance Inspections
5.3 Seller-Requested Deviations
5.4 Non-Conformances
5.5 Contractor Release Note
6. Deliverables
6.1 Documentation
6.2 Packaging, Shipping, Storage and Delivery
1. INTRODUCTION
UT-Battelle, LLC (the Company), is the Management & Operations contractor for the Oak Ridge
National Laboratory (ORNL) located in Oak Ridge, TN. In support of a Department of Energy
(DOE) funded initiative, the company is procuring the necessary components to support.
2. SCOPE
The scope of this Statement of Work (SOW) includes limited design, material procurement, fabrication, assembly, inspection, testing, and delivery of one (1) Shortened Utility Tray 60D.
Required delivery schedule will be finalized at time of purchase order award, however when this document was issued, the utility tray is estimated to be delivered in November 2027.
The Utility Tray has been designed by the Company to interface with a system and is therefore a component of a larger system for production at ORNL. The Utility Tray consists of custom frame fabrication that provides support and routing for AC power, utility cooling water and gas fluid lines as well as providing a work surface along the length of the Utility Tray. The design of this equipment is mature with a functional prototype in operation. Any design modification request must be compatible with existing equipment designs and approved in writing by the Company. The equipment specification, associated drawings & 3D CAD model identified below outline physical & functional requirements of the assembly, defines the process for refining the final design, identifies required verification tests, and provides recommended items to be procured and integrated into the assembly by the Seller. Seller shall also be responsible for complying with listed codes & standards and providing any ancillary items necessary to successfully complete required inspections & tests
(e.g., external power supplies, etc).
The following additional items and work are not included in the scope of this Statement of Work and will be acquired or supplied by the Company and installed at the Company facility by another entity or by the Company. The additional items/work will need to be considered in assembly and/or completion of the Utility Tray assemblies. Items and work not included in this scope: installation at
Company facility.
3. REFERENCES, ACRONYMS AND APPLICABLE DOCUMENTS
3.1 References
Codes & Standards:
• Applicable OSHA Standards and Regulations
• National Electric Code NFPA No 70-2020
• UL508A Edition 3 Industrial Control Panels
• ASME Process Piping Standard B31.3 – 2020
• AWS Structural Welding Code - Steel AWS D1.1/D1.1M:2020
• AWS Structural Welding Code - Stainless Steel AWS D1.6/D1.6M:2017
• IPC/WHMA-A-620D Requirements and Acceptance for Cable and Wire Harness Assemblies
• ASME Section IX -2021 Welding, Brazing and Fusing Qualifications
• ASNT SNT-TC-1A Personnel Qualification and Certification in Nondestructive Testing
3.2 Acronyms & Definitions
ASME American Society of Mechanical Engineers
ASNT American Society For Nondestructive Testing
AWS American Welding Society
BOM Bill of Material
Company UT-Battelle, LLC
COTS Commercial, Off-The-Shelf
CRN Contractor Release Note
DOE Department of Energy
GS General Project Specification
IP Installation Plan
IPC Institute for Printed Circuits
MIP Manufacturing and Inspection Plan
NDE Non-Destructive Examination
NEC National Electric Code
NFPA National Fire Protection Association
NRTL Nationally Recognized Testing Laboratory
ORNL Oak Ridge National Laboratory
PO Procurement Officer
POC Point of Contact
PQR Procedure Qualification Record
QA Quality Assurance
Seller Provider of Goods or Services under this Contract (includes Seller contracted sub-suppliers)
SOW Statement of Work
TPO Technical Project Officer
TS Technical/Equipment Specification
WHMA Wiring Harness Manufacturer's Association
WPS Welding Procedure Specification
3.3 Applicable Documents
• EX-01-ES00012 – Technical Specification for a 90 Degree, Extended Version, and Shortened
Version Utility Tray
• EX-00-ES00086 – General Project Technical Specification
• EX-10-60000 Print and Step Package – Shortened Utility Tray 60D.7z
• E2-10-D00122 – 60D Master Facility to Machine Utilities – Bill of Materials for EX-10-60000
Assembly
• E1-10-D00100-00 Electrical Single Line Diagrams - Panel D and Utility Tray
• E1-10-ES00102 ES Supplement - E1 Panel D Bill of Materials
• Appendix A, Document Submittal Schedule
4. PERFORMANCE REQUIREMENTS
4.1 Work Tasks
4.1.1 General
Seller shall use the Company provided design drawings to create fabrication/shop drawings, as required by the equipment specification, for manufacturability of the Shortened Utility Tray. All documentation submittals identified as required prior to fabrication by Appendix A must be provided by the Seller and receive written approval by the Company prior to start of any fabrication activities unless a deviation has been approved (see Section 5.3).
The Seller shall also obtain separate, written approval of any deviations to the design as provided by the Company of the Assembly per Section 5.3 of this SOW before proceeding with such deviations. Approval of a design document does not constitute approval of a deviation and does not relieve Seller of meeting a design requirement.
The Company is the owner of all designs, documentation, and electronic models produced for this project. This design cannot be fabricated or sold to third parties without written authorization.
4.1.2 Work Task 1: Design Changes to Utility Tray
Seller shall evaluate the design of the Utility Tray in the TS to include conformance with relevant standards and codes.
The Seller shall propose required design changes and obtain written approval from the Company prior to progressing to Work Task 2, to include changes in scope and function.
4.1.3 Work Task 2: Procure, Fabricate and Test Utility Tray
4.1.3.1 After approval by the Company of any design changes in Work Task 1, Seller shall procure all components necessary to complete the design and provide a fully functional system. Seller is also responsible for procuring all items needed to fully inspect and test the assembly per specification requirements. Seller shall also ensure all requirements set forth in this contract are passed down to all sub-suppliers and is responsible for obtaining the necessary information, supplying required documentation to the Company for approval, and requesting approval for any deviations to sub-supplier items. All components must be new, unused, and traceable to the original equipment manufacturer to reduce risk of suspect/counterfeit items.
4.1.3.2 Fabrication shall include support frames and decking, electrical panels (including “Panel D”), disconnects and receptables, flow switch manifold assemblies, utility conduit and tubing runs, and all other equipment and/or components required by the Utility Tray drawings and BOM’s.
All equipment provided by the Seller shall conform to applicable Occupational, Safety, and
Health (OSHA) and National Electrical Code (NEC) regulation which are in force at the time the contract is signed. Equipment must have a NRTL certification to U.S. standards. There are some components specified in the TS that may require Field Evaluations if vendors do not properly certify/mark. It will be Seller’s responsibility to coordinate with vendors to perform
NRTL inspection/testing or coordinate Field Evaluations prior to final acceptance and delivery.
4.1.3.3 All welding and weld inspections shall be performed per applicable standards listed in Sec 3.0 of the General Project Specification and/or Section 2.0 of the Technical Specification. All welders/operators and weld inspectors shall be certified for weld type, materials, sizes, and standards being applied and qualifications must be provided to, and approved by, the Company prior to performing any welds. Documentation requirements to support welding operations are defined in the GS, & Appendix A (Submittal Schedule).
4.1.3.4 The Seller shall prepare procedures/plans that will be executed to provide evidence of satisfying the specific cleaning, inspection and testing requirements as identified in Sections
10.0 & 11.0 of TS. Inspections & tests may require individuals to be certified for the specific activity. Documentation required to support cleaning, inspections, & testing activities will be defined in the TS, GS and in Appendix A, Submittal Schedule. Procedures/Plans must be approved by the Company prior to the activity occurring. Results of all inspections & tests are required to be submitted prior to shipment.
4.1.3.5 Electrical equipment, cables, etc. shall be protected from exposure to weather and moisture throughout the duration of fabrication and assembly. Fluid tubing shall be shipped and stored with end caps in place and fluid fittings shall be stored in covered containers to preclude the introduction of dust, dirt, etc. to the internal surfaces of the fluid systems.
4.1.3.6 Periodic inspection and review of fabrication and partial assembly shall be available to
Company representatives.
4.2 Project Management
Seller shall also comply with the Project Management requirements defined in GS, Section 6.0.
4.2.1 Project Pricing
Project pricing will be fixed-price and will be based on Delivery-At-Place (DAP) Oak Ridge, TN. The Seller is thus responsible for all shipment coordination, cost, and liability to the delivery destination of the Company.
4.3 Data Management
Seller shall also comply with Data Management requirements defined in GS, Section 7.0
4.3.1 Documentation
All documentation associated with this contract that is under the control of the Seller will become the property of and must be made available to the Company as requested.
Documentation shall be provided to the Company for each Utility Tray assembly as identified in
TS & GS and defined in Appendix A, Submittal Schedule. Approval is required to deviate from the submittal schedule. This schedule also defines the timeline for documentation submittal, identifies documents that require approval, required format, technical specification references, and indicates what documentation is required to be included with shipment.
5. QUALITY ASSURANCE
Seller shall also comply with Quality Assurance requirements defined in GS, Section 5.0
5.1 Process Monitoring
For work tasks that involve the fabrication of the Utility Trays (Sec. 4.1.3), the Seller shall prepare a Manufacturing and Inspection Plan (MIP) and submit it to the Company for approval. See GS section 8.9 for additional details and requirements.
Manufacturing may not begin until notice is received that the MIP has been approved by the
Company. (And all docs as listed as approval required prior to fabrication in Appendix A, Submittal Schedule)
The requirement for a MIP shall be flowed down contractually from the Seller to the Seller’s suppliers and subcontractors unless the requirement is waived in writing on a case-by-case basis by the Company.
Examples not requiring a MIP:
• Commercial Off-The-Shelf (COTS) items (not modified)
• Supply of services
5.2 Access for Source Surveillance Inspections
As part of the Company’s quality assurance program, source surveillance activities may be conducted at the Seller’s facility or any sub-tier seller facility that the Company determines necessary to ensure quality objectives are met. See section 5.1 of GS for additional information.
5.3 Seller-Requested Deviations
The Seller may propose deviations from the specifications, drawings, or other technical requirements from this procurement. See section 5.2 of the GS for additional information on how to request a deviation.
5.4 Non-Conformances
The Seller shall report nonconformance per the requirements in GS, section 5.3 and using Form
ORNL-311.
5.5 Contractor Release Note
For each delivery the Seller shall submit a Contractor Release Note, per the requirements identified in GS Section 8.10. The equipment will not be released for shipment until the CRN has been submitted to, and approved by, the Company.
6. DELIVERABLES
The Seller shall prepare the following deliverables and submit them to the TPO and the PO in a timeframe and manner that supports the approved schedule for the tasks.
6.1 Documentation
Required documentation is summarized in Appendix A, Submittal Schedule with additional guidance contained in the TS & GS.
6.2 Packaging, Shipping, Storage and Delivery
Additional requirements are in the General Specification and the Technical Specification.
6.2.1 Transportation
The Seller is responsible for packaging, storage, loading of the equipment, and shipment of all items covered by this scope of work. General shipping and packaging information can be found in the GS, while specific shipping configurations for the items within this scope of work is located in the TS.
Equipment shall be shipped by conventional motor freight. The Seller shall package equipment in a manner that facilitates movement, loading, and unloading with a fork truck. The equipment shall be shipped in shock-resistant packaging. Methods of packaging for shipment shall allow for receipt inspection of the equipment. Instructions for handling shall be provided by the Seller.
6.2.2 Storage and Delivery
The Seller shall store the finished Utility Tray per the requirements located in the GS, Section
13.0. The Company, at its discretion, may require the Seller to postpone the date of shipment by up to 60 days from the agreed upon date of shipment. If the date of shipment is postponed, Seller shall, at no additional cost, store finished products in a safe and secure manner that protects their condition and preserves the integrity of all components and packaging. If storage is required beyond 60 days, Seller agrees to good faith negotiation of extended storage terms.
Appendix A: Document Submittal Schedule
PO #
PO Description: Shortened 60D Utility Tray
Supplier
Doc # Reference
Section Reference
Document Type/Title Submittal Schedule
Format
Approva l Req'd to Proceed
Hard copy to be included w/ shipment
Notes:
EX-00-ES00086 6.1 Project Plan 30 calendar days after award Electronic No No
EX-00-ES00086 6.2 Project Schedule Monthly Electronic No No
EX-05-ES00116
EX-00-ES00086
5.1
5.4, 8.9 Manufacturing and Inspection Plan
Prior to Fabrication
Electronic Yes No
4.1.5.6
8.6, 10.5 Welding Documentation
Prior to Use / Prior to
Shipment Electronic Yes No
Procedures, Specs, Records required prior to use Post-Weld reports required prior to shipment
4.1.8, 6.2
8.7, 13.0 Shipping / Packaging Plan Prior to Use Electronic Yes No
4.1.5.4, 5.1.4
12.0 Factory Acceptance Test Results
Prior to Shipment
Electronic Yes No Full functionality test
4.1.5.5
10.1 NRTL Certification
Prior to Shipment
Electronic Yes No Includes all electrical equipment and field evaluations (as needed)
EX-05-ES00116 4.1.7
Finished As-Built Drawings / Bill of Materials List
Prior to Shipment
Electronic Yes No As-Built documentation shall include both drawings and complete Bill of Materials list
5.5
8.10 Contractor Release Note
Prior to Shipment
Electronic Yes No
4.1.1, 4.1.6 5.3, 5.4
5.2, 5.3
Final Design - Deviations and Non- Conformances
As Needed Electronic Yes No Changes to final design to meet FAT, codes, and regulations
Appendix A: Document Submittal Schedule (cont.)
Notes:
1. One document submittal may satisfy multiple documents listed above. Indicate on each submittal what category it is intended to satisfy.
2. Document # and Section Reference is the location(s) that discuss the document and can provide additional information regarding the requirement and/or expectation.
3. Submittal Schedule provides the required timeframe when that document is expected. This can be expressed as a # of days after award, or prior to an activity. For documents that need approval to proceed, it is recommended these documents be provided at least 30 calendar days ahead of the need date to ensure the approval process does not negatively impact Supplier schedule.
4. Deviations to this submittal schedule shall be approved by the Company. All requested documentation shall be submitted and given a Code 1 or 4 status before release for shipment can occur. Exceptions may be granted on a case-by-case basis and will be noted on the CRN.
5. For additional guidance regarding documentation submittals, see EX-00-ES00086, Section 7.6.
| 2026-04-28T10:43:07-0400 | |
| ZACHARIAH RITER (Affiliate) |
| 2026-04-28T10:52:52-0400 | |
| CHAD HASBROUCK (Affiliate) |