Request for Proposal - Utility Tray - PR494232.pdf
PDF 368 KB Posted
- Attached to
- Utility Tray
- Solicitation number
- 494232
- Issued by
-
Department of Energy
About this file
This is a Request for Proposal (RFP) issued by Oak Ridge National Laboratory (ORNL), a U.S. Department of Energy laboratory managed by UT-Battelle, LLC, for the fabrication of a Shortened 60D Utility Tray for the Environmental Science and Engineering Directorate. The RFP number is PR494232, with questions due by September 4, 2026 at 12:00 PM EST and proposals due by September 10, 2026 at 5:00 PM EST. The anticipated subcontract is a fixed-price award with no small business set-aside. The NAICS code is 332322 (Sheet Metal Work Manufacturing – 750 Employees). The Procurement Officer is Mckenzi Baz (bazmk@ornl.gov, 865-576-6063). Proposals must remain valid for 120 calendar days and shall include technical and cost proposals with supporting documentation. Payment terms are Net 30 days (Large Business) or Net 15 days (Small Business) via electronic funds transfer upon final acceptance, with FOB Destination for domestic shipments and Delivered at Place (DAP) preferred for international shipments.
The technical proposal shall not exceed 15 pages excluding resumes and must demonstrate thorough understanding of requirements across five evaluation factors listed in descending order of importance: Manufacturing/Fabrication Plan and Proposed Improvements/Exception List; Company Experience/Past Performance; Project Management and Adherence/Compliance to Codes and Standards; Personnel Experience and Qualifications; and Quality Assurance Program. Offerors must provide fabrication/manufacturing plans, shop capacity percentages, schedule details with justifications, evidence of required certifications, key personnel qualifications with mitigation plans for single-point failures, and Quality Assurance Program documentation including ISO-9001 compliance evidence. The cost proposal must itemize direct labor (with fully burdened rates and hours), materials and equipment (with supplier quotes or catalog documentation), other direct costs, subcontracts, travel, and indirect expenses. Offerors exceeding $15,000 must complete Representations and Certifications – Abbreviated form; large businesses with offers of $900,000 or more must submit Small Business Subcontracting Plans. Award will be made to the responsible offeror providing best value with technical merit weighted more heavily than cost.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
RFP-PR494232
Request for Proposal BSD-CS-2282 (Rev.2) October 1, 2025
REQUEST FOR PROPOSAL (RFP)
1. INTRODUCTION
Date: August 27, 2026 RFP No.: PR494232 RFP Description: Utility Tray
Offeror Name: TBD Offeror Address: TBD Attention POC: TBD
Subject: RFP for the ORNL Environmental Science and Engineering Directorate In Response Refer to: RFP-PR494232 – Utility Tray
ORNL Procurement Officer: Mckenzi Baz Phone: 865-576-6063 Email: bazmk@ornl.gov
Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) science and energy laboratory, conducting basic and applied research to deliver transformative solutions to compelling problems in energy and security. ORNL is managed and operated by UT-Battelle, LLC (Company). ORNL’s diverse capabilities span a broad range of scientific and engineering disciplines, enabling the Laboratory to explore fundamental science challenges and to carry out the research needed to accelerate the delivery of solutions to the marketplace.
The Company is pleased to invite your firm, herein referred to as “Offeror,” to submit a proposal in support of the subject effort, as outlined in the attached Statement of Work or Specification and/or Technical Direction attached.
The Company reserves the right to update this RFP by amendment prior to date of award.
The Offeror’s proposal shall be prepared in accordance with the information provided in this RFP. Specific responses to the
Company’s requirements are necessary to enable the Company to evaluate Offeror’s understanding of and capability to accomplish the stated objectives. Throughout the proposal, the Offeror shall provide sufficient detail to substantiate the validity of all stated claims, comments, or positions. All proposed concepts must be shown to be technically feasible and achievable within the allotted time limitations, and all performance and schedule requirements must be shown to be realistic. The response shall correspond to the requirements of this RFP, unless otherwise specified in writing by the Company. All Offerors are strongly encouraged to maintain an active registration in SAM.gov to facilitate verification of small business status and eligibility.
2. RFP INFORMATION
Solicitation Number: PR494232 Questions Due By: September 4, 2026, by 12:00 PM EST Offers Due By: September 10, 2026, by 5:00 PM EST Offer Validity Period: 120 days NAICS Code: 332322 – Sheet Metal Work Manufacturing – 750 Employees
BSD-CS-2282 (Rev.2) October 1, 2025
Subcontract Type Anticipated: Fixed Price Small Business Set-Aside: No Description of Supplies/Services Sought: Utility Tray Anticipated Subcontract Period of Performance: TBD
3. LIST OF RFP ATTACHMENTS
Attachment No. Description Document Title (Date/Revision)
Attachment A
Statement of Work
(SOW)/
Technical Specifications/Drawings
A1) E2-10-ES00123 Rev 0 SOW Shortened 60D Utility Tray
A2) EX-10-ES00012 Rev 4 Technical Specification for a 90 Degree, Extended Version, and Shortened Version Utility Tray
A3) EX-00-ES00086_R0_General Project Technical Specification
April 28, 2026
June 20, 2024
April 27, 2023
Attachment B Bill of Materials
B1) E1-10-ES00102 ES Supplement - E1 Panel D Bill of Materials
B2) E2-10-D00122_R0 - 60D Master Facility to Machine Utilities – Bill of Materials for EX-10-60000 Assembly
Not Applicable
Not Applicable
Attachment C Electrical Single Line Diagrams
E1-10-D00100-00 Electrical Single Line Diagrams - Panel D and Utility Tray -
DRAFT
Not Applicable
Attachment D Print Package (Placeholder)
Placeholder for Shortened Utility Tray_EX-10-60000 Rev F - RFQ Print Package – Reach out to the Procurement Officer, Mckenzi Baz, via email at bazmk@ornl.gov for this document.
Not Applicable
Attachment E Required Documents Exhibit 2, Representations of Limited Rights Data and Restricted Computer Software
October 13, 2025
Attachment F ORNL Terms and Conditions
Terms and Conditions – Fixed Price –
BSD-CS-2150
October 1, 2025
Attachment G Prime Contract T&C Flow Downs
UT-Battelle Prime Supplemental Flowdown Document - Additional Terms and Conditions for Subcontracts Purchase Orders under Prime Contract No. DE-AC05-00OR22725 - BSD-CS-
July 6, 2026
Attachment H Representations and Certifications
H1) Representations & Certifications – Abbreviated - BSD-CS-2260
H2) Representations & Certifications – International - BSD-CS-2123
March 9, 2026
October 1, 2025 mailto:bazmk@ornl.gov https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-2-Rep-Limited-Rights-Data-Restricted-Computer-Software-BSD-CS-2005-2025.10.13.pdf https://contracts.ornl.gov/terms-and-conditions/ https://contracts.ornl.gov/terms-and-conditions/ https://contracts.ornl.gov/wp-content/uploads/2025/09/Terms-Conditions-Fixed-Price-BSD-CS-2150-10.01.2025.pdf https://contracts.ornl.gov/wp-content/uploads/2025/09/Terms-Conditions-Fixed-Price-BSD-CS-2150-10.01.2025.pdf https://contracts.ornl.gov/special-articles-and-forms/ https://contracts.ornl.gov/special-articles-and-forms/ https://contracts.ornl.gov/wp-content/uploads/2026/07/Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf https://contracts.ornl.gov/wp-content/uploads/2026/07/Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf https://contracts.ornl.gov/wp-content/uploads/2026/07/Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf https://contracts.ornl.gov/wp-content/uploads/2026/07/Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf https://contracts.ornl.gov/wp-content/uploads/2026/07/Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf https://contracts.ornl.gov/wp-content/uploads/2026/07/Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf https://contracts.ornl.gov/wp-content/uploads/2026/03/Reps-and-Certs-Abbreviated-2026.03.09.pdf https://contracts.ornl.gov/wp-content/uploads/2026/03/Reps-and-Certs-Abbreviated-2026.03.09.pdf https://contracts.ornl.gov/wp-content/uploads/2025/12/Reps-and-Certs-International-2025.10.01.pdf https://contracts.ornl.gov/wp-content/uploads/2025/12/Reps-and-Certs-International-2025.10.01.pdf
BSD-CS-2282 (Rev.2) October 1, 2025
Attachment I Special Provisions
I1) Milestone Payments
I2) Exhibit 1C – Patent Rights – Retention by the Seller (Short Form)
I3) Exhibit 3 – Authorization and Consent
I4) Exhibit 9 – Technical Data
I5) Exhibit 17 – Rights to Proposal Data (Technical)
May 1, 2010
October 13, 2025
4. STATEMENT OF WORK/SPECIFICATIONS
Attachment A - Statement of Work - E2-10-ES00123 Rev 0 SOW Shortened 60D Utility Tray dated April 28, 2026.
5. PROPOSAL PREPARATION
Preparation of Offers. (a) Offerors are expected to examine the drawings, specifications, descriptions, terms and conditions, and all instructions. Failure to do so will be at the Offeror's risk. (b) Each Offeror shall furnish the information required by the solicitation. The Offeror shall sign the offer. Erasures or other changes must be initialed by the person signing the offer. (c) Unit price for each unit offered shall be shown and such price shall include packing and shipping materials unless otherwise specified. A total price shall be entered for each item offered. Any tariffs shall be expressly stated and priced separately. In case of discrepancy between a unit price and total price, the unit price will be presumed to be correct. (d) Offeror must state a definite time for delivery of supplies or performance of services unless otherwise specified in the solicitation. Time, if stated as a number of days, will include Saturdays, Sundays, and holidays unless offeror expressly states offer is in business days. (e) Offers in strict accordance with the solicitation are desired.
Any exceptions should be referenced to related documents by title, page, and paragraph, and should be set forth in detail. (f) This request does not commit Company to pay for any costs incurred in the preparation and submission of an offer or for any other costs incurred prior to the execution of an Agreement.
Explanation to Prospective Offerors. Any explanation desired by a prospective Offeror regarding the meaning or interpretation of the solicitation, drawings, specification, etc., must be requested with sufficient time allowed for a reply to reach all prospective Offerors before submission of their offers. Any information given to a prospective Offeror will be furnished to all prospective Offerors if such information is necessary in submitting offers or if the lack of such information would be prejudicial to any other prospective Offerors.
Proposal Format. Offeror is requested to submit their proposal in MS Excel, MS Word, or PDF formats. Proposals must be submitted on the forms furnished by the Company. If no form is provided, Offeror may submit their proposal in a format of their choosing.
Contractual / Administrative Authority. No direction to proceed or other instruction to begin work shall be binding upon Company except when specifically issued and confirmed in writing by Company Procurement Officer. Offeror’s acceptance of, or reliance upon any direction to proceed or other instruction by Company’s technical personnel, or other representatives not specifically authorized to issue formal purchase order commitments, shall be at Offeror’s own risk and shall not constitute a binding purchase commitment upon Company.
Acknowledgement of Amendments. Receipt of an amendment to a solicitation must be acknowledged in writing.
https://contracts.ornl.gov/wp-content/uploads/2021/01/milestone-payment-ext-may10.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-1C-Patent-Rights-Retention-by-Seller-BSD-CS-2003-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-1C-Patent-Rights-Retention-by-Seller-BSD-CS-2003-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-3-Authorization-and-Consent-BSD-CS-2008-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-3-Authorization-and-Consent-BSD-CS-2008-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-9-Technical-Data-BSD-CS-2012-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-17-Right-to-Proposal-Data-Technical-BSD-CS-2024-2025.10.13-1.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-17-Right-to-Proposal-Data-Technical-BSD-CS-2024-2025.10.13-1.pdf
BSD-CS-2282 (Rev.2)
Proposal Contact. Any questions regarding any portion of this RFP must be coordinated through the Company’s Procurement Officer, identified as Company’s Contact in the Introduction. No written or verbal correspondence will be permitted with any other member of the Company without coordination through the Company’s Procurement Officer.
Failure to comply with this requirement may result in the Offeror’s disqualification from consideration for award. The Company is open to proposal clarification questions/discussions in regard to this RFP via the email address or telephone number provided in the Introduction.
Omissions. It shall be clearly understood that, not-withstanding the detailed requirements contained herein, it is the Offeror’s responsibility to identify and quote any aspect or area which may have been omitted in this RFP and which will nevertheless be necessary to meet the general requirements of the defined effort.
Opportunity for Enhancement. In the interest of cost effectiveness, the Offeror is encouraged to identify and propose alternatives to specifications that, in its judgment, may offer limited value in consideration of cost or price. Further, the Offeror is invited to suggest practical performance incentives that may be introduced to the advantage of both Offeror and Company.
Proposal Acceptance. The Company reserves the right to (a) consider proposals or modifications to proposals received after the due date should such action be determined to be in the best interest of Company or its customer, and/or (b) make award without written or oral discussion.
Affordability. This effort is in support of the U.S. Government, who has a vital mission and constrained resources, and it is incumbent upon industry to provide our customer with high quality and affordable solutions. The Company considers this challenge to be a major discriminator in our proven performance and demonstrated value to our customers. The Company has developed a number of initiatives to drive value for our customer, and we expect our partners in our supply chain to do the same. It is requested as part of your proposal in response to this RFP that you articulate and demonstrate specifics in your offer that are affordable and meet or exceed all technical and schedule requirements. Your response to these criteria will be an element of the proposal evaluation and award decision process.
Payment. Payment shall be made by electronic funds transfer (EFT). EFT enrollment shall be completed during the Ariba registration process.
Discounts. Prompt payment discounts will be included in the evaluation of offers, provided the period of the offered discount is sufficient to permit payments within such period in the regular course of business under the delivery, inspection, and payment provisions of the solicitation.
Rights to Technical Data in Successful Proposals. Should an Agreement be awarded based on a proposal, it is policy, in consideration of the award, to obtain unlimited rights for the Government in technical data (but not commercial or financial information) contained in a successful proposal upon which award of an Agreement is based. To exclude technical data contained in a proposal from the Government’s rights, the offer must:
(1) Advise the Company that the technical data, or portions thereof that are identified by the Offeror, are covered by the restrictive notice regarding the disclosure and use of proposal information in accordance with the provision of this RFP entitled Treatment of Offer Information and request that such protection be maintained by excluding the data from the Government’s rights; or
(2) Establish to the Company’s satisfaction that identified portions of the technical data do not relate directly to or will not be utilized in the work to be performed under the Agreement, and request that such portions be excluded from the Government’s rights.
BSD-CS-2282 (Rev.2) October 1, 2025
If unlimited rights to technical data in successful proposals, as set forth in the first paragraph of this section are to be acquired, it shall be by use of the clause below titled, “Rights to Proposal Data (Technical).” Any excluded technical data will be identified by inserting appropriate proposal page numbers in the clause, which clause enables the identification of data to be excluded from the Government’s rights, as discussed in the first paragraph of this section. Such exclusion is not dispositive of the protective status of the data, but any excluded technical data, as well as any commercial and financial information contained in the proposal, will be used for evaluation purposes only. If there is a need to have access to any of the excluded technical data during contract performance, their acquisition will be as limited rights data, if they so qualify, in accordance with FAR 27.404- 1(d).
Rights to Proposal Data (Technical)
Except for data contained on pages _______, it is agreed that as a condition of the award of this subcontract and notwithstanding the conditions of any notice appearing thereon, the Government shall have unlimited rights (as defined in the “Rights in Data – General” clause contained in this subcontract in and to the technical data contained in the proposal dated, _______, upon which this subcontract is based.
Government-Furnished Property. No material, labor, or facilities will be furnished by the Company or the Government unless otherwise provided in the solicitation.
Award of Subcontract. (a) Unless specified otherwise elsewhere in this solicitation, the Agreement will be awarded to the responsible Offeror whose offer represents the best value, total cost and/or price of the acquisition and other factors considered.
(b) The Company reserves the right to reject any or all offers and to waive informalities and minor irregularities in offers received.
(c) Except as may otherwise be provided in the solicitation, the Company may accept any item or group of items of any offer, unless the Offeror qualifies the offer by specific limitations.
(d) The Company may accept within the time specified therein, any offer (or part thereof, as provided in (c) above), whether or not there are negotiations subsequent to its receipt, unless the offer is withdrawn by written notice received by the Company prior to award. If subsequent negotiations are conducted, they shall not constitute a rejection or counteroffer on the part of the Company.
(e) It is the Company’s intent to award based on initial offers. Accordingly, each offer should be submitted on the most favorable terms, from a price and technical standpoint that the Offeror can submit. However, the Company may allow for proposal revisions if the Company deems it necessary.
Brand Name or Equal. (a) If items called for by this solicitation have been identified by a "brand name or equal" description (including identification of products by make and model), such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of products that will be considered satisfactory.
Offers proposing "equal" products (including products of the brand name manufacturer other than the one described by the brand name) will be considered for award if such products are clearly identified in the offer and are determined by the Company to meet fully the salient characteristics’ requirements listed in the solicitation.
(b) Unless the Offeror clearly indicates in the offer that it is offering an "equal" product, the offer shall be considered as offering the brand name product referenced in the solicitation.
BSD-CS-2282 (Rev.2) October 1, 2025
(c)(1) If the Offeror proposes to furnish an "equal" product, the brand name, if any, of the product to be furnished shall be clearly identified in the offer. The evaluation of offers and the determination as to equality of the product offered shall be the responsibility of the Company and will be based on information furnished by the Offeror.
CAUTION TO OFFERORS: The Company is not responsible for locating or securing any information that is not furnished with the offer. Accordingly, the Offeror must furnish as part of the offer all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the Company to (i) determine whether the product offered meets the salient characteristics’ requirements of the solicitation, and (ii) establish exactly what the Company would be binding itself to purchase by making an offer.
(2) If the Offeror proposes to modify a product to make it conform to the requirements of the solicitation, it shall (i) include in the offer a clear description of such proposed modifications and (ii) clearly mark any descriptive material to show the proposed modifications.
Unbalanced Pricing. The Company may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items and option items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. An offer may be rejected if the Company determines that the lack of balance poses an unacceptable risk to the Company.
Conditions Affecting the Work. Offerors should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve Offerors from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Company will assume no responsibility for any understanding or representations concerning conditions made by any of their officers or agents prior to the execution of the Agreement, unless that understanding or representation is expressly stated in the Agreement resulting from this solicitation.
Treatment of Offer Information. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Company or the Government except for evaluation purposes, shall:
(a) Mark the title page with the following legend:
This proposal includes information that shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, an Agreement is awarded to this Offeror as a result of—or in connection with—the submission of this information, the Company and the Government shall have the right to duplicate, use, or disclose the information to the extent provided in the resulting Agreement. This restriction does not limit the Company’s and the Government's right to use information contained in this information if it is obtained from another source without restriction. The information subject to this restriction are contained in pages [insert numbers or other identification of pages]; and
(b) Mark each page of information it wishes to restrict with the following legend:
Use or disclosure of information contained on this page is subject to the restriction on the title page of this proposal.
Company Profile. Provide a company profile to include business classification (e.g. Large, Small, Disadvantaged, etc.).
BSD-CS-2282 (Rev.2) October 1, 2025
Signing Authority. Provide the names, positions, email address, and phone numbers of persons authorized to negotiate this proposal, contractually commit the Offeror, or persons to be contacted for clarification or questions.
Proposal Validity. Unless otherwise stated in the Offeror’s proposal, the Offeror’s proposal shall be valid for 120 calendar days.
FOB and Shipping Terms. FOB Destination for domestic shipments. The preferred terms for international shipments are Delivered at Place (DAP). Do not insure shipments.
Offeror Business Information. Complete business address of the Offeror, the corporate name to be used on any resultant contract, and the remittance address if different from that above. Identify “parent company” or “sponsoring corporation” name, also provide such identity as appropriate.
Subcontract Type. Identify proposed subcontract type if other than the anticipated subcontract type located in Attachment F: ORNL Terms and Conditions – Fixed Price.
Options. Company shall have the option to purchase additional quantities of items or services described in the Statement of Work/Specifications. The Offeror should include any option prices in the appropriate area of the RFP. It should be understood by the Offeror that the Company may not exercise any or all options which are not included in the base award. The award may be made by the Company for the initial quantity only. It is important that the foregoing be considered by the Offeror in preparing and submitting separate prices for the initial order quantity and for each individual option. Offers will be evaluated for purposes of award by adding the total price for all option quantities to the total price for the initial quantity. Evaluation of options will not obligate the Company to exercise the option(s).
Withdrawal of Offers. Offers may be withdrawn by written notice received by the Procurement Officer at any time before award.
Proposal Package. A complete proposal package consists of the following elements:
Technical Proposal Cost Proposal Exceptions/Non-Compliance Conditions of Proposal / Assumptions Supplementary Requirements
TECHNICAL PROPOSAL REQUIREMENTS:
The Technical Proposal shall not exceed 15 pages (excluding personnel resumes).
The technical proposal should be specific, detailed, and complete to demonstrate clearly and fully that the Offeror has a thorough understanding of the Company’s requirements. The technical proposal must enable the technical evaluators to make a thorough analysis and arrive at a sound determination as to whether or not the proposal meets the Company’s requirements. The proposal shall include descriptions sufficient to describe the Offeror’s technical approach. The technical proposal must be sufficient to show how the Offeror proposes to comply with the Company’s requirements and it must include a full explanation of the methods proposed. The Offeror shall include a glossary of acronyms and special terminology.
No certified cost or pricing information shall be included in the technical proposal.
The technical proposal must be in the following format:
https://contracts.ornl.gov/wp-content/uploads/2025/09/Terms-Conditions-Fixed-Price-BSD-CS-2150-10.01.2025.pdf
BSD-CS-2282 (Rev.2) October 1, 2025
Personnel. Describe the experience and qualifications of personnel who will be assigned for direct work on this program. Information is required to show the composition of the task or work group, its general qualifications, and recent experience with similar equipment or programs. Special mention shall be made of direct technical supervisors and key technical personnel, and the approximate percentage of the total time each will be available for this program.
Principal Investigator (PI)/Project Director. List the name of the Principal Investigator/Project Director responsible for overall implementation of the contract and key contact for technical aspects of the project. Even though there may be co-investigators, identify the Principal Investigator/Project Director who will be responsible for the overall implementation of any awarded contract. Discuss the qualifications, experience, and accomplishments of the Principal Investigator/Project Director. State the estimated time to be spent on the project, his/her proposed duties, and the areas or phases for which he/she will be responsible.
Other Key Personnel. List all other investigators/professional personnel who will be participating in the project. Discuss their qualifications, experience, and accomplishments. State the estimated time each will spend on the project, proposed duties on the project, and the areas or phases for which each will be responsible.
Additional Personnel. List names, titles, and proposed duties of additional personnel, if any, who will be required for full-time employment, or on a subcontract or consultant basis. The technical areas, character, and extent of subcontract or consultant activity will be indicated, and the anticipated sources will be specified and qualified.
Resumes. Resumes of all key personnel are required. Each must indicate educational background, recent experience, specific or technical accomplishments, and a listing of relevant publications.
Technical Objectives. State the overall objectives and the specific accomplishments you hope to achieve. Indicate the rationale for your plan, and relation to comparable work in progress elsewhere. Review pertinent work already published which is relevant to this project and your proposed approach. This should support the scope of the project as you perceive it.
Technical Approach. Use as many subparagraphs, appropriately titled, as needed to clearly outline the general plan of work. Discuss phasing of research and possible or probable outcome of approaches proposed.
Technical Methods. Describe in detail the methodologies you will use for the project, indicating your level of experience with each, areas of anticipated difficulties, and any unusual expenses you anticipate.
Schedule. Provide a schedule for completion of the work and delivery of items specified in the statement of work.
Performance or delivery schedules shall be indicated for phases or segments, as applicable, as well as for the overall program. Schedules shall be shown in terms of calendar months from the date of authorization to proceed or, where applicable, from the date of a stated event, for example, receipt of a required approval by the Company. Unless the request for proposal indicates that the stipulated schedules are mandatory, they shall be treated as desired or recommended schedules. In this event, proposals based upon the Offeror's best alternative schedule, involving no overtime, extra shift or other premium, will be accepted for consideration.
Facilities and Resources. List/describe all facilities and resources available for this project, including any equipment.
Other Considerations. Identify and discuss specific factors not included elsewhere which support your proposal. Using specifically titled subparagraphs, items may include:
• Any agreements and/or arrangements with subcontractor(s). Provide as much detail as necessary to explain how the statement of work will be accomplished within this working relationship.
BSD-CS-2282 (Rev.2) October 1, 2025
• Unique arrangements which none or very few organizations are likely to have, which is advantageous for effective implementation of this project.
• Equipment and unusual operating procedures established to protect personnel from hazards associated with this project.
• Other factors you feel are important and support your proposed research.
• Recommendations for changing reporting requirements or other deliverables if such changes are more compatible with the offeror's proposed schedules.
COST PROPOSAL REQUIREMENTS:
All proposals shall be submitted in U.S. Dollars (USD). If a standard proposal pricing worksheet/form is provided within this RFP, the Offeror shall submit their pricing via the worksheet/form. If the worksheet/form is not provided, the Offeror may submit their pricing information in their own format.
This proposal may be subject to a government price audit.
The cost breakdowns shall identify the following information: direct labor, subcontracts, travel, materials and equipment, other direct costs, indirect expenses, and fee or profit.
Labor. For direct labor, identify the labor category, hours, and fully burdened labor rates. Identify each direct labor category and include a brief job description and minimum education and experience requirements for each subcontractor labor category proposed. If the period of performance is for more than one year, show the information for each year proposed. Please identify all Key Personnel proposed.
Materials and Equipment. Include a breakdown of each item along with supporting documentation for prices proposed, e.g., quotes from suppliers and/or catalog cut sheets with pertinent pricing.
Other Direct Costs. The Offeror shall submit complete details of how "other direct costs" (ODCs) were derived.
Milestone Payment Plan. The Company may consider a proposed payment plan with the Offeror’s response.
Proposed payments must demonstrate significant progress against the schedule incorporated into the subcontract.
Government Approved Rates. If any of the proposed rates and factors have been accepted or approved by a government agency, the Offeror shall identify the agency, its location, and the date of such acceptance or approval and provide a copy of the approval letter.
All Other Costs Proposed. The Offeror shall submit complete details of any other costs not specifically identified or addressed above. The details shall be presented in a manner that will enable a comprehensive and thorough evaluation to be conducted.
EXCEPTIONS/NON-COMPLIANCE:
Exception(s) to or non-compliance with any portion of this RFP shall be clearly identified in a separate Exceptions/Non-Compliance section referencing the specific document, page, paragraph, and item. Exceptions identified in the Offeror’s Technical Proposal need not be restated in this section. You are required to explain the reason(s) for the non-compliance and identify any alternate solutions to achieve compliance. Any exceptions that are taken to the provisions of this RFP will be considered in evaluating the Offeror’s proposal and may result in your offer being deemed non-responsive. The absence of a proposal section entitled
BSD-CS-2282 (Rev.2) October 1, 2025
“Exceptions/Non-Compliance” or a statement indicating “no exceptions are taken” implies complete and unequivocal acceptance of all requirements, terms, and conditions.
CONDITIONS OF PROPOSAL/ASSUMPTIONS:
The Offeror shall identify any conditions and/or assumptions of its proposal in a separate Conditions of Proposal/Assumptions section. The Offeror shall include a list of any Company/Government equipment and/or information needed as a condition of performance. Offeror shall include its assertion of Limited or Restricted Rights in Data and/or Software.
SUPPLEMENTARY REQUIREMENTS:
Representations and Certifications – Abbreviated. If your proposal exceeds $15,000, Offeror must complete and return a copy of the Representations and Certifications – Abbreviated (BSD-CS-2260) form, a copy of which can be found here: https://contracts.ornl.gov/special-articles-and-forms/.
Organizational Conflicts of Interest. If your proposal exceeds $15,000 and the Special Provisions section of this RFP includes the "Organizational Conflicts of Interest" clause, the statement required by paragraph (c) of the provision entitled "Organizational Conflicts of Interest Disclosure - Advisory and Assistance Services," is made a part of this RFP. A copy of these OCI disclosure statement requirements for Advisory and Assistance Services can be found here:
https://contracts.ornl.gov/special-articles-and-forms/.
Small Business Subcontracting Plan. If your offer, including options, is $900,000 (or $2 million for Construction) or more and the Offeror is a large business, the Offeror shall submit a Small Business Subcontracting Plan that fully meets the requirements of FAR 52.219-9 or complete the ORNL Small Business Subcontracting Plan Form (BSD-CS-2129). A copy of this form can be found here: https://contracts.ornl.gov/special-articles-and-forms/. Annual small business reporting will be required via the Electronic Subcontracting Reporting System (http://www.esrs.gov). If the Offeror determines it is not required to submit a plan for subcontracting with small business concerns, they shall submit a Representations Regarding Small Business Subcontracting Plan.
Foreign End Products. The Offeror shall list as foreign end products those end products that are manufactured outside of the United States that do not qualify as domestic end products. List all foreign end products proposed and their country of origin.
Patent Rights. If the Special Provisions section of this RFP includes either the "Exhibit IB, Patent Rights – Acquisition by the Government" or the "Exhibit 1C, Patent Rights - Retention by the Seller (Short Form)" clause, and you have requested an advance waiver of patent rights, Offeror shall submit a copy of the form (attachments are not necessary) that you submitted to the DOE Patent Counsel. (See the form entitled "Exhibit 2B - Petition for Advance Waiver of Patent Rights" found here: https://contracts.ornl.gov/exhibits/.)
6. COMPETITION
This RFP is being issued on a competitive basis. The Company intends to make one award.
Questions. Questions concerning this RFP must be submitted in writing, via email, to the Procurement Officer listed in the Introduction of this RFP. Information given to one prospective offeror will be furnished to all prospective offerors if a lack of the information would be prejudicial to them.
https://contracts.ornl.gov/special-articles-and-forms/ https://contracts.ornl.gov/special-articles-and-forms/ https://contracts.ornl.gov/special-articles-and-forms/ http://www.esrs.gov/ https://contracts.ornl.gov/wp-content/uploads/2023/11/Representations-Regarding-Small-Business-Subcontracting-Plan-BSD-CS-2125-11.15.23-1.pdf https://contracts.ornl.gov/exhibits/
BSD-CS-2282 (Rev.2)
7. BASIS OF AWARD
Basis of Award – Best Value (Tradeoff). An award resulting from this RFP will be made to the responsible offeror that submits a proposal that is determined to provide the best value to the Company with technical merit being more important than cost/pricing. The technical evaluation process consists of the proposals being reviewed, evaluated and rated using a graded system that assesses the degree of compliance with the Technical Criteria requirements and the level-of-performance risk. The Evaluation Factors are listed below, and are listed in descending order of importance:
EVALUATION FACTORS
Factor 1: Manufacturing/Fabrication Plan and Proposed Improvements/Exception List Factor 2: Company Experience/Past Performance Factor 3: Project Management and Adherence/Compliance to Codes and Standards Factor 4: Personnel Experience and Qualifications Factor 5: Quality Assurance Program (QAP)
1. Manufacturing/Fabrication Plan and Proposed Improvements/Exception List The Company will evaluate Criterion 1 in the Offeror's Technical Proposal based on the feasibility and validity of their detailed manufacturing capability. Also, the Company shall evaluate the Offeror’s current throughput capability & shop capacity as it relates to completing original scope plus all options. The Offeror must provide the following in their technical proposal: A) Fabrication and/or manufacturing plan to ensure capability and understanding of the requirements of the project specifications and detailed Statement of Work; B) Inclusion of procedures, plans, and/or equipment in place to ensure product consistency & repeatability; C) Shop capacity in percentage if award is issued within one month of proposal submittal. This information will be used to analyze suppliers’ risk of meeting project schedule requirements; D) Indicate additional facility and/or personnel resources required to perform the work as scheduled; E) Provide any relevant supply chain issues or other difficulties experienced that will be applicable to project execution; F) Provide any proposed improvements to design, cost and/or schedule and provide a list of exceptions to stated requirements to determine achievability and practicality.
This will demonstrate both the level to which the Offeror understands the requirements and thoroughness of the review of the specifications. NOTE: Exceptions to requirements after award will require an approved deviation request.
2. Company Experience/Past Performance
The Company will evaluate Criterion 2 in the Offeror's Technical Proposal based on their demonstrated track record for reliability as a supplier which will be verified by the Company with existing customers. Additional evaluations by the Company include reviewing the degree to which the Offeror's proposal indicates successful past performance in performing similar relevant engineering design, product manufacturing services, product reliability and customer service. Lastly, the Company may solicit, at its discretion, from available sources, relevant information concerning past performance and experience for use in the evaluation process. This information will be used to review the potential impact to the Company's project success. The Offeror must provide the following in their technical proposal: A) Examples of successful completion of at least two (2) projects for the design, fabrication, and performance testing of similar assemblies; B) References, including current contact information for client technical lead, project scope and project location shall be provided by the Offeror; C) Provide an organization and management approach that ensures successful performance of the requirements of the Specifications.
BSD-CS-2282 (Rev.2) October 1, 2025
3. Project Management and Adherence/Compliance to Codes and Standards The Company will evaluate Criterion 3 in the Offeror's Technical Proposal based on ability to effectively manage this project scope and schedule. This also includes evaluation of the Offeror’s ability to meet the codes and standards as defined on the drawings and specifications. The Offeror must provide the following in their technical proposal: A) Listing of the tools to be used to establish a detailed and accurate schedule; B) An example of a typical schedule with inclusion of project status updates. This proposed schedule shall include details and justification(s), including time factors for documentation submittals and approvals as required, material control plan that indicates how inventory is procured, controlled, tracked, and issued; C) Evidence of identified certifications necessary to meet design requirements. If that portion of work is to be subcontracted to another facility, associated certifications are required to be submitted.
4. Personnel Experience and Qualifications
The Company will evaluate Criterion 4 in the Offeror's Technical Proposal based on the degree to which the proposal demonstrates the required skills, qualifications, longevity as a team, and experience required of the key personnel. This will also include assessing the quality of performance by individuals on past projects of a similar nature; expertise and accomplishments of key personnel in other similar work environments; and proven ability to provide the technical assistance required. The Offeror must provide the following in their technical proposal: A) Single Point Failures: Indicate each key personnel and include positions, skills, qualifications and longevity with Offeror, and appropriate experience; B) Provide a mitigation plan for key personnel or resources whose abrupt and extended absence would cause disruption to the production capabilities.
5. Quality Assurance Program (QAP)
The Company will evaluate Criterion 5 in the Offeror's Technical Proposal based on Offeror's QAP to ensure compliance with the requirements of this procurement. The Offeror must provide the following in their technical proposal: A) Offeror's QAP. It shall be noted, the Company has discretion to verify or complete its evaluation by conducting inspection on-site at Offeror's facility to review the Offeror's QAP and confirm that the Offeror/Offeror's subcontractors possess the expertise, facilities, and equipment sufficient to fabricate the components as required in the Specification and Drawings; B) Provide evidence of compliance with ISO-9001 or equivalent QAP documentation.
8. SPECIAL PROVISIONS
The following documents can be located at https://contracts.ornl.gov/documents-index/.
Milestone Payment (05/2010)
Exhibit 1C, Patent Rights – Retention by the Seller (Short Form) (10/13/2025) Exhibit 3, Authorization and Consent (10/13/2025) Exhibit 9, Technical Data (10/13/2025) Exhibit 17, Rights to Proposal Data (Technical) (10/13/2025)
9. PAYMENT TERMS
Payment terms are Net 30 (Large Business) or Net 15 (Small Business) days upon final acceptance of the product/service. All payments will be made in U.S. Dollars (USD). Payment shall be made by electronic funds transfer.
https://contracts.ornl.gov/documents-index/ https://contracts.ornl.gov/wp-content/uploads/2021/01/milestone-payment-ext-may10.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-1C-Patent-Rights-Retention-by-Seller-BSD-CS-2003-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-3-Authorization-and-Consent-BSD-CS-2008-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-9-Technical-Data-BSD-CS-2012-2025.10.13.pdf https://contracts.ornl.gov/wp-content/uploads/2025/10/Exhibit-17-Right-to-Proposal-Data-Technical-BSD-CS-2024-2025.10.13-1.pdf
BSD-CS-2282 (Rev.2)
10. CLOSING
Should additional information be required on any of these requests please do not hesitate to contact the undersigned Procurement Officer below.
Sincerely, Mckenzi Baz Phone: 865-576-6063 Email: bazmk@ornl.gov mailto:bazmk@ornl.gov
File details come from the government source that posted it. Updated .