UT FLAP WEB 10(1) Causey Reservoir Access

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF25SS0020
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Huntsville, Utah, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking qualified prime contractors for the UT FLAP WEB 10(1) Causey Reservoir Access project, which involves major road improvements to enhance access to Causey Reservoir on the Uinta-Wasatch-Cache National Forests in Weber County, Utah. The project encompasses reconstruction and rehabilitation work along Causey Road, Wheat Grass Canyon Road, and Skull Crack Road, including roadway excavation, mechanically stabilized earth walls, asphalt concrete pavement placement, guardrail installation, cofferdams, dewatering, precast reinforced concrete box culverts, and concrete curb construction. To qualify, contractors must demonstrate bonding capacity for a single project of $20 million and provide examples of comparable road construction projects that include all specified work elements. Interested firms must submit by July 29, 2025, at 2 p.m. Denver time, a statement of intent to bid as prime contractor, confirmation of socioeconomic categories, bonding capacity documentation, and relevant project experience. The agency is conducting this pre-solicitation to determine if sufficient interest exists from qualified small businesses, HUBZone small businesses, woman-owned small businesses, 8(a) small businesses, or service-disabled veteran-owned small businesses to allow for a set-aside program designation.

Currently, no set-aside designation has been established, as this pre-solicitation notice is specifically intended to assess interest from various socioeconomic categories of small businesses to determine if a set-aside is appropriate. The estimated total project cost ranges between $10 million and $20 million, covering all scheduled work and options including Schedule A improvements, Option X bridge replacement, Option Y road reconstruction, and Option Z road rehabilitation. The project is anticipated to be advertised in October 2025, awarded by December 2025, and commence construction in May 2026, with work occurring over two construction seasons and an estimated completion date of November 2027. Key work quantities include 15,115 cubic yards of roadway excavation, 4,440 square feet of mechanically stabilized earth walls, and various tonnages of asphalt concrete pavement across the different project options. Winter shutdown periods are planned from mid-December through mid-May, and all road closures must be coordinated with the Boy Scouts of America and other stakeholders to ensure continued access to Causey Dam.

Notice text

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.  Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:  Laura Slauter) for receipt by close of business (2 p.m. local Denver time) on July 29, 2025: 

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $20 million, and your firm’s aggregate bonding capacity; and

(4) Provide a list of road construction projects of equal or greater value and scope to the UT FLAP WEB 10(1) Causey Reservoir Accessproject in which you performed roadway excavation, mechanically stabilized earth wall, placement of roadway aggregate, placement of asphalt concrete pavement, guardrail, cofferdams, dewatering, precast reinforced concrete box culvert, and concrete curb.  DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/

PROJECT NAME AND NUMBER:  UT FLAP WEB 10(1) Causey Reservoir Access

PROJECT DESCRIPTION: 

The Project goal is to improve access to Causey Reservoir on the Uinta-Wasatch-Cache National Forests in Weber County, Utah.  The project begins at the intersection of Utah State Route 39 and Causey Road, located approximately 10.5 miles east of Huntsville, Utah. The project includes improvements along Causey Road, Wheat Grass Canyon Road, and Skull Crack Road. 

The project is in rolling terrain within the elevation ranging from 5464.75 to 5779.21 feet.

Proposed improvements include schedules and options:

  • Schedule A: 4R improvements consisting of 0.65 miles on Causey Road and Wheat Grass Canyon Road.
  • Option X: Beaver Creek structure replacement.
  • Option Y: 4R improvements consisting of 0.56 miles on Skull Crack Road.
  • Option Z: 3R improvements consisting of 1.39 miles on Causey Road.

SCOPE OF THE WORK: 

Schedule A: Major reconstruction on portions of Causey Road and Wheat Grass Canyon Road.  All road closures must be coordinated with Boy Scouts of America.

  • Three-way intersection improvements: Causey Road will be realigned to change the through movement traffic pattern to Causey Dam Overlook Road instead of Wheat Grass Canyon Road.  This realignment would improve the sight distance, promote travel across the dam, and produce on-site material. 
  • Wheat Grass Canyon Road: Proposed improvements for the first 0.46-miles will provide a 22-foot width through the paved areas and 5 (five) mechanically stabilized earth (MSE) walls (ranging from 9 to 19 feet tall) are required to provide a full two-lane roadway width at locations of severe outboard slope erosion.  The proposed improvements will enhance driver safety, expectations, and ride quality by addressing existing conditions where the roadway transitions from two lanes to one and where pavement and aggregate surfaces vary.

Option X:  Beaver Creek is conveyed through Causey Road via a bridge, 30-feet wide by 18-feet long, with a 7-ft tall concrete frame structure.  The existing roadway width is 20-feet.  The existing structure is approximately 50 years old and is located on a local road outside the forest. Bridge railings are functionally obsolete.  Proposed improvements will replace the bridge with a 36-feet long, 24-feet span precast reinforced concrete three-sided culvert with precast reinforced concrete headwalls and wingwalls. Concrete seals will be required due to depth of foundations below water table. 

  • Proposed crossing replacement will be a 3-sided prefabricated structure.
  • Shallow foundation design bearing on soil: Bearing capacity of soil and design parameters for earth pressures to aid in wingwall design are detailed in the geotechnical report.
  • One 3-week closure will be permitted between early September and mid-October or mid-November through late February.  Road closures are to be coordinated with Bureau of Reclamation and Weber Basin Authority to ensure Causey Dam is accessible.

Option Y: Skull Crack Road is currently aggregate surface and will be reconstructed to have consistent 22-foot typical section.

  • Minor roadway geometric improvements are needed to meet current design and safety standards.
  • The existing deteriorated 72-inch corrugated metal pipe is to be replaced with 12-ft span by 8-ft rise, concrete box culvert.

Option Z: Proposed improvements for Causey Road include rehabilitation of the existing roadway to provide 1.46 miles of 22-foot uniform paved roadway width to address deteriorated pavement.  Culverts and guardrails will be replaced where necessary, and ditches will be rehabilitated where feasible. 

PRINCIPAL WORK ITEMS:

The principal work items, for Schedule A and each of the options are:

Schedule A:

20401-0000 Roadway Excavation 15115 CUYD

25501-0000 Mechanically Stabilized Earth Wall 4440 SQFT

40301-0100 Asphalt Concrete Pavement 1745 TON

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 2825 LNFT

Option X:

20303-1600 Removal of Pavement, Asphalt 1290 SQYD

20815-0000  Cofferdams LPSM

20820-0000 Dewatering LPSM

60220-0000 Precast Reinforced Concrete Box Culvert, 3 sided including wingwalls, headwalls, and footings 36 LNFT

Option Y:

30202-2000 Roadway Aggregate 1900 TON

40301-0100 Asphalt Concrete Pavement 1245 TON

60103-0000 Concrete, Headwall 2 EACH

60220-4050  12-feet Span, 8-feet Rise, Precast Reinforced Concrete Box Culvert 54 LNFT

60901-1000 Curb, Concrete, 12-inch Depth Curb 2410 LNFT

61701-4500 Guardrail System MGS, Type 2, Class A  Steel Posts 3480 LNFT

Option Z:

30302-1000 Ditch Reconditioning 6930 LNFT

30402-5500 Full Depth Reclamation, Method 2, 8-inch Depth 18345 SQYD

40301-0100 Asphalt Concrete Pavement 3635 TON

ANTICIPATED SCHEDULE: 
It is anticipated this project will be advertised in October 2025, be awarded by December 2025, and be under construction in May 2026. Construction will occur over two seasons, and the project has an estimated completion date of November 2027. Winter shutdown is assumed from mid-December through mid-May.

ESTIMATED COST RANGE: 

The estimated price range of the project work (Schedule A, Option X, Option Y, and Option Z combined) is between: $10,000,000 and $20,000,000.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
UT FLAP WEB 10(1) Causey Reservoir Access Award Award Notice
UT FLAP WEB 10(1) Causey Reservoir Access Latest solicitation Solicitation
UT FLAP WEB 10(1) Causey Reservoir Access Pre-Solicitation
UT FLAP WEB 10(1) Causey Reservoir Access This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity