UT FLAP WEB 10(1) Causey Reservoir Access

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF25B000014
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Huntsville, Utah, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Highway Administration is seeking contractors for the Causey Reservoir Access project, a comprehensive road improvement initiative to enhance access to Causey Reservoir on the Uinta-Wasatch-Cache National Forests in Weber County, Utah. The project encompasses improvements along three roads - Causey Road, Wheat Grass Canyon Road, and Skull Crack Road - beginning at the intersection of Utah State Route 39 and Causey Road, approximately 10.5 miles east of Huntsville, Utah. The scope includes major reconstruction work, roadway realignment to improve sight distances, installation of five mechanically stabilized earth walls ranging from 9 to 19 feet tall, pavement reconstruction, drainage structures, guardrail installations, and bridge/culvert replacements. The work is structured in multiple components: Schedule A covering 4R improvements on 0.65 miles of roadway, with three additional options including Beaver Creek structure replacement, Skull Crack Road improvements (0.56 miles), and Causey Road rehabilitation (1.39 miles). This pre-solicitation notice indicates that formal bidding documents are not yet available, with anticipated advertisement in October 2025 and a non-mandatory pre-bid site visit scheduled for October 7, 2025.

The procurement is designated for full and open competition with HUBZone price preference, meaning HUBZone-certified businesses will receive pricing advantages in the evaluation process. No current incumbent contractors are identified in the documentation, as this appears to be a new construction project rather than a contract renewal or modification. The estimated contract value ranges between $10,000,000 and $20,000,000, reflecting the substantial scope of road reconstruction and infrastructure improvements across approximately 2.6 miles of roadway. The timeline spans from an anticipated award in December 2025 through project completion by November 2027, with construction scheduled to begin in May 2026 and include winter shutdown periods from mid-December through mid-May. All road closures must be coordinated with the Boy Scouts of America, indicating the area's recreational significance, and the work will be performed in rolling terrain at elevations ranging from 5,464.75 to 5,779.21 feet.

Notice text

4 versions

Update #4 · Latest ·

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE FOR INFORMATION ONLY and are subject to change when the solicitation is posted.

PROJECT NUMBER:UT FLAP WEB 10(1)

PROJECT NAME:CAUSEY RESERVOIR ACCESS

SET- ASIDE: FULL AND OPEN Competition with HUBZone Price Preference

PROJECT DESCRIPTION:

The Project goal is to improve access to Causey Reservoir on the Uinta-Wasatch-Cache National Forests in Weber County, Utah. The project begins at the intersection of Utah State Route 39 and Causey Road, located approximately 10.5 miles east of Huntsville, Utah. The project includes improvements along Causey Road, Wheat Grass Canyon Road, and Skull Crack Road.

The project is in rolling terrain within the elevation ranging from 5464.75 to 5779.21 feet.

Proposed improvements include schedules and options:

  • Schedule A: 4R improvements consisting of 0.65 miles on Causey Road and Wheat Grass Canyon Road.
  • Option X: Beaver Creek structure replacement.
  • Option Y: 4R improvements consisting of 0.56 miles on Skull Crack Road.
  • Option Z: 3R improvements consisting of 1.39 miles on Causey Road.

SCOPE OF THE WORK:

Schedule A: Major reconstruction on portions of Causey Road and Wheat Grass Canyon Road. All road closures must be coordinated with Boy Scouts of America.

  • Three-way intersection improvements: Causey Road will be realigned to change the through movement traffic pattern to Causey Dam Overlook Road instead of Wheat Grass Canyon Road. This realignment would improve the sight distance, promote travel across the dam, and produce on-site material.
  • Wheat Grass Canyon Road: Proposed improvements for the first 0.46-miles will provide a 22-foot width through the paved areas and 5 (five) mechanically stabilized earth (MSE) walls (ranging from 9 to 19 feet tall) are required to provide a full two-lane roadway width at locations of severe outboard slope erosion. The proposed improvements will enhance driver safety, expectations, and ride quality by addressing existing conditions where the roadway transitions from two lanes to one and where pavement and aggregate surfaces vary.

Option X: Beaver Creek is conveyed through Causey Road via a bridge, 30-feet wide by 18-feet long, with a 7-ft tall concrete frame structure. The existing roadway width is 20-feet. The existing structure is approximately 50 years old and is located on a local road outside the forest. Bridge railings are functionally obsolete. Proposed improvements will replace the bridge with a 36-feet long, 24-feet span precast reinforced concrete three-sided culvert with precast reinforced concrete headwalls and wingwalls. Concrete seals will be required due to depth of foundations below water table.

  • Proposed crossing replacement will be a 3-sided prefabricated structure.
  • Shallow foundation design bearing on soil: Bearing capacity of soil and design parameters for earth pressures to aid in wingwall design are detailed in the geotechnical report.
  • One 3-week closure will be permitted between early September and mid-October or mid-November through late February. Road closures are to be coordinated with Bureau of Reclamation and Weber Basin Authority to ensure Causey Dam is accessible.

Option Y: Skull Crack Road is currently aggregate surface and will be reconstructed to have consistent 22-foot typical section.

  • Minor roadway geometric improvements are needed to meet current design and safety standards.
  • The existing deteriorated 72-inch corrugated metal pipe is to be replaced with 12-ft span by 8-ft rise, concrete box culvert.

Option Z: Proposed improvements for Causey Road include rehabilitation of the existing roadway to provide 1.46 miles of 22-foot uniform paved roadway width to address deteriorated pavement. Culverts and guardrails will be replaced where necessary, and ditches will be rehabilitated where feasible.

PRINCIPAL WORK ITEMS:

The principal work items, for Schedule A and each of the options are:

Schedule A:

20401-0000 Roadway Excavation 15115 CUYD

25501-0000 Mechanically Stabilized Earth Wall 4440 SQFT

40301-0100 Asphalt Concrete Pavement 1745 TON

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 2825 LNFT

Option X:

20303-1600 Removal of Pavement, Asphalt 1290 SQYD

20815-0000 Cofferdams LPSM

20820-0000 Dewatering LPSM

60220-0000 Precast Reinforced Concrete Box Culvert, 3 sided including wingwalls, headwalls, and footings 36 LNFT

Option Y:

30202-2000 Roadway Aggregate 1900 TON

40301-0100 Asphalt Concrete Pavement 1245 TON

60103-0000 Concrete, Headwall 2 EACH

60220-4050 12-feet Span, 8-feet Rise, Precast Reinforced Concrete Box Culvert 54 LNFT

60901-1000 Curb, Concrete, 12-inch Depth Curb 2410 LNFT

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 3480 LNFT

Option Z:

30302-1000 Ditch Reconditioning 6930 LNFT

30402-5500 Full Depth Reclamation, Method 2, 8-inch Depth 18345 SQYD

40301-0100 Asphalt Concrete Pavement 3635 TON

ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in October 2025, be awarded by December 2025, and be under construction in May 2026. Construction will occur over two seasons, and the project has an estimated completion date of November 2027. Winter shutdown is assumed from mid-December through mid-May.

ESTIMATED COST RANGE:  The estimated price range of the project work (Schedule A, Option X, Option Y, and Option Z combined) is between: $10,000,000 and $20,000,000.

NOTICE: NON-MANDATORY PRE-BID SITE VISIT

This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will conduct a meeting on Tuesday, October 7, 2025, from 9:00 a.m. to approximately 3:00 p.m. FHWA will provide a brief project presentation, a driving tour stopping at various locations to present design elements along the route and be available to answer questions for the balance of the time period. 

Access to the project roadways are not restricted to the public during the site visit, please provide your own transportation and personal protective equipment. Tour stopping locations have limited parking, please consolidate vehicles to the extent practical.      

Interested parties will meet at the Weber Center for the Pre-Bid Showing Office Meeting in Room 312 at 9:00a.m. Located at 2380 Washington Blvd. Room 312 Ogden, UT 84401. Room 312 is located on the 3rd floor of the Weber Center. The easiest access is to use the outdoor stairs from the parking lot. When you enter the building at the top of the stairs, Room 312 is on your right.

Site Visit:  1:00p.m.- 3:00p.m. will meet at Weber Memorial Park Entrance on Causey Road. 41°17'51.99"N, 111°35'49.55"W.

The agenda, sign-in sheet, any questions answered and other information from the pre-bid meeting will be posted to SAM.gov shortly after. If you would like to attend the pre-bid meeting, please email CFLContracts@dot.gov by Friday, October 3, 2025.

ATTENDANCE AT THE PROJECT PRE-BID MEETING IS NOT MANDATORY TO BID THE PROJECT.

Update #3 ·

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE FOR INFORMATION ONLY and are subject to change when the solicitation is posted.

PROJECT NUMBER:UT FLAP WEB 10(1)

PROJECT NAME:CAUSEY RESERVOIR ACCESS

SET- ASIDE: FULL AND OPEN Competition with HUBZone Price Preference

PROJECT DESCRIPTION:

The Project goal is to improve access to Causey Reservoir on the Uinta-Wasatch-Cache National Forests in Weber County, Utah. The project begins at the intersection of Utah State Route 39 and Causey Road, located approximately 10.5 miles east of Huntsville, Utah. The project includes improvements along Causey Road, Wheat Grass Canyon Road, and Skull Crack Road.

The project is in rolling terrain within the elevation ranging from 5464.75 to 5779.21 feet.

Proposed improvements include schedules and options:

  • Schedule A: 4R improvements consisting of 0.65 miles on Causey Road and Wheat Grass Canyon Road.
  • Option X: Beaver Creek structure replacement.
  • Option Y: 4R improvements consisting of 0.56 miles on Skull Crack Road.
  • Option Z: 3R improvements consisting of 1.39 miles on Causey Road.

SCOPE OF THE WORK:

Schedule A: Major reconstruction on portions of Causey Road and Wheat Grass Canyon Road. All road closures must be coordinated with Boy Scouts of America.

  • Three-way intersection improvements: Causey Road will be realigned to change the through movement traffic pattern to Causey Dam Overlook Road instead of Wheat Grass Canyon Road. This realignment would improve the sight distance, promote travel across the dam, and produce on-site material.
  • Wheat Grass Canyon Road: Proposed improvements for the first 0.46-miles will provide a 22-foot width through the paved areas and 5 (five) mechanically stabilized earth (MSE) walls (ranging from 9 to 19 feet tall) are required to provide a full two-lane roadway width at locations of severe outboard slope erosion. The proposed improvements will enhance driver safety, expectations, and ride quality by addressing existing conditions where the roadway transitions from two lanes to one and where pavement and aggregate surfaces vary.

Option X: Beaver Creek is conveyed through Causey Road via a bridge, 30-feet wide by 18-feet long, with a 7-ft tall concrete frame structure. The existing roadway width is 20-feet. The existing structure is approximately 50 years old and is located on a local road outside the forest. Bridge railings are functionally obsolete. Proposed improvements will replace the bridge with a 36-feet long, 24-feet span precast reinforced concrete three-sided culvert with precast reinforced concrete headwalls and wingwalls. Concrete seals will be required due to depth of foundations below water table.

  • Proposed crossing replacement will be a 3-sided prefabricated structure.
  • Shallow foundation design bearing on soil: Bearing capacity of soil and design parameters for earth pressures to aid in wingwall design are detailed in the geotechnical report.
  • One 3-week closure will be permitted between early September and mid-October or mid-November through late February. Road closures are to be coordinated with Bureau of Reclamation and Weber Basin Authority to ensure Causey Dam is accessible.

Option Y: Skull Crack Road is currently aggregate surface and will be reconstructed to have consistent 22-foot typical section.

  • Minor roadway geometric improvements are needed to meet current design and safety standards.
  • The existing deteriorated 72-inch corrugated metal pipe is to be replaced with 12-ft span by 8-ft rise, concrete box culvert.

Option Z: Proposed improvements for Causey Road include rehabilitation of the existing roadway to provide 1.46 miles of 22-foot uniform paved roadway width to address deteriorated pavement. Culverts and guardrails will be replaced where necessary, and ditches will be rehabilitated where feasible.

PRINCIPAL WORK ITEMS:

The principal work items, for Schedule A and each of the options are:

Schedule A:

20401-0000 Roadway Excavation 15115 CUYD

25501-0000 Mechanically Stabilized Earth Wall 4440 SQFT

40301-0100 Asphalt Concrete Pavement 1745 TON

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 2825 LNFT

Option X:

20303-1600 Removal of Pavement, Asphalt 1290 SQYD

20815-0000 Cofferdams LPSM

20820-0000 Dewatering LPSM

60220-0000 Precast Reinforced Concrete Box Culvert, 3 sided including wingwalls, headwalls, and footings 36 LNFT

Option Y:

30202-2000 Roadway Aggregate 1900 TON

40301-0100 Asphalt Concrete Pavement 1245 TON

60103-0000 Concrete, Headwall 2 EACH

60220-4050 12-feet Span, 8-feet Rise, Precast Reinforced Concrete Box Culvert 54 LNFT

60901-1000 Curb, Concrete, 12-inch Depth Curb 2410 LNFT

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 3480 LNFT

Option Z:

30302-1000 Ditch Reconditioning 6930 LNFT

30402-5500 Full Depth Reclamation, Method 2, 8-inch Depth 18345 SQYD

40301-0100 Asphalt Concrete Pavement 3635 TON

ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in October 2025, be awarded by December 2025, and be under construction in May 2026. Construction will occur over two seasons, and the project has an estimated completion date of November 2027. Winter shutdown is assumed from mid-December through mid-May.

ESTIMATED COST RANGE:  The estimated price range of the project work (Schedule A, Option X, Option Y, and Option Z combined) is between: $10,000,000 and $20,000,000.

NOTICE: NON-MANDATORY PRE-BID SITE VISIT

This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will conduct a meeting on Tuesday, October 7, 2025, from 9:00 a.m. to approximately 3:00 p.m. FHWA will provide a brief project presentation, a driving tour stopping at various locations to present design elements along the route and be available to answer questions for the balance of the time period. 

Access to the project roadways are not restricted to the public during the site visit, please provide your own transportation and personal protective equipment. Tour stopping locations have limited parking, please consolidate vehicles to the extent practical.      

Interested parties will meet at the Weber Center for the Pre-Bid Showing Office Meeting in Room 312 at 9:00a.m. Located at 2380 Washington Blvd. Room 312 Ogden, UT 84401. Room 312 is located on the 3rd floor of the Weber Center. The easiest access is to use the outdoor stairs from the parking lot. When you enter the building at the top of the stairs, Room 312 is on your right.

Site Visit:  1:00p.m.- 3:00p.m. will meet at Weber Memorial Park Entrance on Causey Road. 41°17'51.99"N, 111°35'49.55"W.

The agenda, sign-in sheet, any questions answered and other information from the pre-bid meeting will be posted to SAM.gov shortly after. If you would like to attend the pre-bid meeting, please email CFLContracts@dot.gov by Friday, October 3, 2025.

ATTENDANCE AT THE PROJECT PRE-BID MEETING IS NOT MANDATORY TO BID THE PROJECT.

Update #2 ·

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE FOR INFORMATION ONLY and are subject to change when the solicitation is posted.

PROJECT NUMBER:UT FLAP WEB 10(1)

PROJECT NAME:CAUSEY RESERVOIR ACCESS

SET- ASIDE: FULL AND OPEN Competition with HUBZone Price Preference

PROJECT DESCRIPTION:

The Project goal is to improve access to Causey Reservoir on the Uinta-Wasatch-Cache National Forests in Weber County, Utah. The project begins at the intersection of Utah State Route 39 and Causey Road, located approximately 10.5 miles east of Huntsville, Utah. The project includes improvements along Causey Road, Wheat Grass Canyon Road, and Skull Crack Road.

The project is in rolling terrain within the elevation ranging from 5464.75 to 5779.21 feet.

Proposed improvements include schedules and options:

  • Schedule A: 4R improvements consisting of 0.65 miles on Causey Road and Wheat Grass Canyon Road.
  • Option X: Beaver Creek structure replacement.
  • Option Y: 4R improvements consisting of 0.56 miles on Skull Crack Road.
  • Option Z: 3R improvements consisting of 1.39 miles on Causey Road.

SCOPE OF THE WORK:

Schedule A: Major reconstruction on portions of Causey Road and Wheat Grass Canyon Road. All road closures must be coordinated with Boy Scouts of America.

  • Three-way intersection improvements: Causey Road will be realigned to change the through movement traffic pattern to Causey Dam Overlook Road instead of Wheat Grass Canyon Road. This realignment would improve the sight distance, promote travel across the dam, and produce on-site material.
  • Wheat Grass Canyon Road: Proposed improvements for the first 0.46-miles will provide a 22-foot width through the paved areas and 5 (five) mechanically stabilized earth (MSE) walls (ranging from 9 to 19 feet tall) are required to provide a full two-lane roadway width at locations of severe outboard slope erosion. The proposed improvements will enhance driver safety, expectations, and ride quality by addressing existing conditions where the roadway transitions from two lanes to one and where pavement and aggregate surfaces vary.

Option X: Beaver Creek is conveyed through Causey Road via a bridge, 30-feet wide by 18-feet long, with a 7-ft tall concrete frame structure. The existing roadway width is 20-feet. The existing structure is approximately 50 years old and is located on a local road outside the forest. Bridge railings are functionally obsolete. Proposed improvements will replace the bridge with a 36-feet long, 24-feet span precast reinforced concrete three-sided culvert with precast reinforced concrete headwalls and wingwalls. Concrete seals will be required due to depth of foundations below water table.

  • Proposed crossing replacement will be a 3-sided prefabricated structure.
  • Shallow foundation design bearing on soil: Bearing capacity of soil and design parameters for earth pressures to aid in wingwall design are detailed in the geotechnical report.
  • One 3-week closure will be permitted between early September and mid-October or mid-November through late February. Road closures are to be coordinated with Bureau of Reclamation and Weber Basin Authority to ensure Causey Dam is accessible.

Option Y: Skull Crack Road is currently aggregate surface and will be reconstructed to have consistent 22-foot typical section.

  • Minor roadway geometric improvements are needed to meet current design and safety standards.
  • The existing deteriorated 72-inch corrugated metal pipe is to be replaced with 12-ft span by 8-ft rise, concrete box culvert.

Option Z: Proposed improvements for Causey Road include rehabilitation of the existing roadway to provide 1.46 miles of 22-foot uniform paved roadway width to address deteriorated pavement. Culverts and guardrails will be replaced where necessary, and ditches will be rehabilitated where feasible.

PRINCIPAL WORK ITEMS:

The principal work items, for Schedule A and each of the options are:

Schedule A:

20401-0000 Roadway Excavation 15115 CUYD

25501-0000 Mechanically Stabilized Earth Wall 4440 SQFT

40301-0100 Asphalt Concrete Pavement 1745 TON

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 2825 LNFT

Option X:

20303-1600 Removal of Pavement, Asphalt 1290 SQYD

20815-0000 Cofferdams LPSM

20820-0000 Dewatering LPSM

60220-0000 Precast Reinforced Concrete Box Culvert, 3 sided including wingwalls, headwalls, and footings 36 LNFT

Option Y:

30202-2000 Roadway Aggregate 1900 TON

40301-0100 Asphalt Concrete Pavement 1245 TON

60103-0000 Concrete, Headwall 2 EACH

60220-4050 12-feet Span, 8-feet Rise, Precast Reinforced Concrete Box Culvert 54 LNFT

60901-1000 Curb, Concrete, 12-inch Depth Curb 2410 LNFT

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 3480 LNFT

Option Z:

30302-1000 Ditch Reconditioning 6930 LNFT

30402-5500 Full Depth Reclamation, Method 2, 8-inch Depth 18345 SQYD

40301-0100 Asphalt Concrete Pavement 3635 TON

ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in October 2025, be awarded by December 2025, and be under construction in May 2026. Construction will occur over two seasons, and the project has an estimated completion date of November 2027. Winter shutdown is assumed from mid-December through mid-May.

ESTIMATED COST RANGE:  The estimated price range of the project work (Schedule A, Option X, Option Y, and Option Z combined) is between: $10,000,000 and $20,000,000.

NOTICE: NON-MANDATORY PRE-BID SITE VISIT

This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will conduct a meeting on Tuesday, October 7, 2025, from 9:00 a.m. to approximately 3:00 p.m. FHWA will provide a brief project presentation, a driving tour stopping at various locations to present design elements along the route and be available to answer questions for the balance of the time period. 

Access to the project roadways are not restricted to the public during the site visit, please provide your own transportation and personal protective equipment. Tour stopping locations have limited parking, please consolidate vehicles to the extent practical.      

Interested parties will meet at the Weber Center for the Pre-Bid Showing Office Meeting in Room 312 at 9:00a.m. Located at 2380 Washington Blvd. Room 312 Ogden, UT 84401. Room 312 is located on the 3rd floor of the Weber Center. The easiest access is to use the outdoor stairs from the parking lot. When you enter the building at the top of the stairs, Room 312 is on your right.

Site Visit:  1:00p.m.- 3:00p.m. will meet at Weber Memorial Park Entrance on Causey Road. 41°17'51.99"N, 111°35'49.55"W.

The agenda, sign-in sheet, any questions answered and other information from the pre-bid meeting will be posted to SAM.gov shortly after. If you would like to attend the pre-bid meeting, please email CFLContracts@dot.gov by Friday, October 3, 2025.

ATTENDANCE AT THE PROJECT PRE-BID MEETING IS NOT MANDATORY TO BID THE PROJECT.

Update #1 ·

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE

PROJECT NUMBER:UT FLAP WEB 10(1)

PROJECT NAME:CAUSEY RESERVOIR ACCESS

SET- ASIDE: FULL AND OPEN Competition with HUBZone Price Preference

PROJECT DESCRIPTION:

The Project goal is to improve access to Causey Reservoir on the Uinta-Wasatch-Cache National Forests in Weber County, Utah. The project begins at the intersection of Utah State Route 39 and Causey Road, located approximately 10.5 miles east of Huntsville, Utah. The project includes improvements along Causey Road, Wheat Grass Canyon Road, and Skull Crack Road.

The project is in rolling terrain within the elevation ranging from 5464.75 to 5779.21 feet.

Proposed improvements include schedules and options:

  • Schedule A: 4R improvements consisting of 0.65 miles on Causey Road and Wheat Grass Canyon Road.
  • Option X: Beaver Creek structure replacement.
  • Option Y: 4R improvements consisting of 0.56 miles on Skull Crack Road.
  • Option Z: 3R improvements consisting of 1.39 miles on Causey Road.

SCOPE OF THE WORK:

Schedule A: Major reconstruction on portions of Causey Road and Wheat Grass Canyon Road. All road closures must be coordinated with Boy Scouts of America.

  • Three-way intersection improvements: Causey Road will be realigned to change the through movement traffic pattern to Causey Dam Overlook Road instead of Wheat Grass Canyon Road. This realignment would improve the sight distance, promote travel across the dam, and produce on-site material.
  • Wheat Grass Canyon Road: Proposed improvements for the first 0.46-miles will provide a 22-foot width through the paved areas and 5 (five) mechanically stabilized earth (MSE) walls (ranging from 9 to 19 feet tall) are required to provide a full two-lane roadway width at locations of severe outboard slope erosion. The proposed improvements will enhance driver safety, expectations, and ride quality by addressing existing conditions where the roadway transitions from two lanes to one and where pavement and aggregate surfaces vary.

Option X: Beaver Creek is conveyed through Causey Road via a bridge, 30-feet wide by 18-feet long, with a 7-ft tall concrete frame structure. The existing roadway width is 20-feet. The existing structure is approximately 50 years old and is located on a local road outside the forest. Bridge railings are functionally obsolete. Proposed improvements will replace the bridge with a 36-feet long, 24-feet span precast reinforced concrete three-sided culvert with precast reinforced concrete headwalls and wingwalls. Concrete seals will be required due to depth of foundations below water table.

  • Proposed crossing replacement will be a 3-sided prefabricated structure.
  • Shallow foundation design bearing on soil: Bearing capacity of soil and design parameters for earth pressures to aid in wingwall design are detailed in the geotechnical report.
  • One 3-week closure will be permitted between early September and mid-October or mid-November through late February. Road closures are to be coordinated with Bureau of Reclamation and Weber Basin Authority to ensure Causey Dam is accessible.

Option Y: Skull Crack Road is currently aggregate surface and will be reconstructed to have consistent 22-foot typical section.

  • Minor roadway geometric improvements are needed to meet current design and safety standards.
  • The existing deteriorated 72-inch corrugated metal pipe is to be replaced with 12-ft span by 8-ft rise, concrete box culvert.

Option Z: Proposed improvements for Causey Road include rehabilitation of the existing roadway to provide 1.46 miles of 22-foot uniform paved roadway width to address deteriorated pavement. Culverts and guardrails will be replaced where necessary, and ditches will be rehabilitated where feasible.

PRINCIPAL WORK ITEMS:

The principal work items, for Schedule A and each of the options are:

Schedule A:

20401-0000 Roadway Excavation 15115 CUYD

25501-0000 Mechanically Stabilized Earth Wall 4440 SQFT

40301-0100 Asphalt Concrete Pavement 1745 TON

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 2825 LNFT

Option X:

20303-1600 Removal of Pavement, Asphalt 1290 SQYD

20815-0000 Cofferdams LPSM

20820-0000 Dewatering LPSM

60220-0000 Precast Reinforced Concrete Box Culvert, 3 sided including wingwalls, headwalls, and footings 36 LNFT

Option Y:

30202-2000 Roadway Aggregate 1900 TON

40301-0100 Asphalt Concrete Pavement 1245 TON

60103-0000 Concrete, Headwall 2 EACH

60220-4050 12-feet Span, 8-feet Rise, Precast Reinforced Concrete Box Culvert 54 LNFT

60901-1000 Curb, Concrete, 12-inch Depth Curb 2410 LNFT

61701-4500 Guardrail System MGS, Type 2, Class A Steel Posts 3480 LNFT

Option Z:

30302-1000 Ditch Reconditioning 6930 LNFT

30402-5500 Full Depth Reclamation, Method 2, 8-inch Depth 18345 SQYD

40301-0100 Asphalt Concrete Pavement 3635 TON

ANTICIPATED SCHEDULE: It is anticipated this project will be advertised in October 2025, be awarded by December 2025, and be under construction in May 2026. Construction will occur over two seasons, and the project has an estimated completion date of November 2027. Winter shutdown is assumed from mid-December through mid-May.

ESTIMATED COST RANGE:  The estimated price range of the project work (Schedule A, Option X, Option Y, and Option Z combined) is between: $10,000,000 and $20,000,000.

NOTICE: NON-MANDATORY PRE-BID SITE VISIT

This pre-bid meeting notice is being given to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will conduct a meeting on Tuesday, October 7, 2025, from 9:00 a.m. to approximately 3:00 p.m. FHWA will provide a brief project presentation, a driving tour stopping at various locations to present design elements along the route and be available to answer questions for the balance of the time period. 

Access to the project roadways are not restricted to the public during the site visit, please provide your own transportation and personal protective equipment. Tour stopping locations have limited parking, please consolidate vehicles to the extent practical.      

Interested parties will meet at the Weber Center for the Pre-Bid Showing Office Meeting in Room 312 at 9:00a.m. Located at 2380 Washington Blvd. Room 312 Ogden, UT 84401. Room 312 is located on the 3rd floor of the Weber Center. The easiest access is to use the outdoor stairs from the parking lot. When you enter the building at the top of the stairs, Room 312 is on your right.

Site Visit:  1:00p.m.- 3:00p.m. will meet at Weber Memorial Park Entrance on Causey Road. 41°17'51.99"N, 111°35'49.55"W.

The agenda, sign-in sheet, any questions answered and other information from the pre-bid meeting will be posted to SAM.gov shortly after. If you would like to attend the pre-bid meeting, please email CFLContracts@dot.gov by Friday, October 3, 2025.

ATTENDANCE AT THE PROJECT PRE-BID MEETING IS NOT MANDATORY TO BID THE PROJECT.

Attachments

Files attached to this notice, newest first
File Type Posted
PRE-SOLICITATION UT FLAP WEB 10(1).pdf PDF
UT FLAP WEB 10(1) Causey Plans Flat.pdf PDF
UT FLAP WEB 10(1) Causey Reservoir Access SCRs.pdf PDF
PRE-SOLICITATION UT FLAP WEB 10(1).pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
UT FLAP WEB 10(1) Causey Reservoir Access Award Award Notice
UT FLAP WEB 10(1) Causey Reservoir Access Latest solicitation Solicitation
UT FLAP WEB 10(1) Causey Reservoir Access This notice Pre-Solicitation
UT FLAP WEB 10(1) Causey Reservoir Access Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity