UT FLAP 73(2) La Sal Mountain Loop Road

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF23B000027
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Moab, Utah, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks road construction services for the UT FLAP 73(2) La Sal Mountain Loop Road project located in Moab, Utah. The Department of Transportation Federal Highway Administration is procuring rehabilitation and reconstruction of approximately 11 miles of existing roadway. Key requirements include pulverization and resurfacing of asphalt, drainage improvements, signage and pavement markings. Bids were due by December 19, 2023 and evaluated based on total price.

The solicitation carries no set-aside designations. The project involves principal work items such as roadway excavation, aggregate base, full depth reclamation and asphalt concrete pavement. Incumbent contractor Kilgore Companies provided the lowest bid of $21,995,114.40 to complete the work within a single construction season. The engineer's estimate was $24,144,702. Performance is required along the 11 mile route in Moab, Utah.

Notice text

PROJECT NUMBER:  UT FLAP 73(2)

PROJECT NAME:  La Sal Mountain Loop Road

PROJECT DESCRIPTION: 

The UT FLAP 73(2), La Sal Mountain Loop Road Project is located approximately 8 miles southeast of Moab, UT in Eastern Utah. The project crosses through Utah State School and Institutional Trust Lands (SITLA), Bureau of Land Management (BLM), private, and United States Forest Service (USFS) lands, providing access to the Manti – La Sal National Forest and Bureau of Land Management lands. The route is categorized as a major rural collector in mountainous terrain and is maintained by San Juan County.

This project rehabilitates and reconstructs the existing road with minor superelevation correction, profile adjustments, curve widening, ditch reconstruction, culvert replacements, asphalt surfacing, erosion control, signing, and pavement markings. The existing pavement is in poor condition with significant rutting, cracking, and potholing apparent along the route. To complete the proposed widening and realignment, rock and soil cuts and fills are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered.  The project consists of two segments, broken into Schedule A and Option X.

Segment 1 (Option X) – Segment 1 goes from the intersection of Old Airport Road 11+62 to 147+00 at the intersection of Pack Creek Cutoff. Rehabilitation and widening consists of pulverizing the existing pavement, widening the road to 30 feet from the beginning to 45+00 and 26 feet for the remainder of the road, placing aggregate base and asphalt concrete pavement, and drainage improvements.

Segment 2 (Schedule A) – Segment 2 goes from 147+00 at the intersection of Pack Creek Cutoff, and goes to 650+91, the boundary with the previous project UT PFH 46-1(2) and UT FLAP 73(1).  Rehabilitation consists of pulverizing the existing pavement, placing new aggregate base leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet. Five locations will be reconstructed requiring raising or lowering profile, placing aggregate base, asphalt concrete pavement, and drainage improvements to widen the roadway width to 26 feet.

PRINCIPAL WORK ITEMS (Schedule A):

  • 20401-0000 Roadway Excavation: 75,000 CUYD
  • 30101-0000 Aggregate Base: 55,000 TON
  • 30401-5500 Full Depth Reclamation: 9.45 Miles
  • 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 31,000 TON
  • 60201-1000 Culverts: 4000 LNFT
  • 63501-1000 Temporary Traffic Control: LPSM  

PRINCIPAL WORK ITEMS (Option X):

  • 20401-0000 Roadway Excavation: 16,000 CUYD
  • 30101-0000 Aggregate Base: 25,000 TON
  • 30401-5500 Full Depth Reclamation: 2.56 Miles
  • 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 9,600 TON
  • 63501-1000 Temporary Traffic Control: LPSM 

ESTIMATED COST RANGE:

Total estimated cost between $20,000,000 and $30,000,000

This is a full and open competition.

Attachments

Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
UT FLAP 73(2) La Sal Mountain Loop Road Award Award Notice
UT FLAP 73(2) La Sal Mountain Loop Road This notice · Latest solicitation Solicitation
UT FLAP 73(2) La Sal Mountain Loop Road Pre-Solicitation
UT FLAP 73(2) La Sal Mountain Loop Road Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity