USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N5523626R0009
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333618 Other Engine Equipment Manufacturing
- PSC
- 2815 Diesel Engines And Components
- Place of performance
- San Diego, CA 92136
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Sea Systems Command is procuring ALCO Model 251C long lead time material replacement components for USS BOXER (LHD-4) on a sole source basis from Fairbanks Morse Defense, with proposals due July 1. This is a FAR Part 12 combined synopsis/solicitation; the Government intends to solicit and contract with Fairbanks Morse only, and determination not to compete based on responses to this notice remains solely within Government discretion.
Place of performance is San Diego, California. The NAICS code is 333618, Other Engine Equipment Manufacturing, and the PSC code is 2815, Diesel Engines and Components. RFP Amendment 0001 updates the Product Description (Attachment J-1). The full combined solicitation/synopsis notice and all FAR and DFAR references are available in the attached solicitation document and at acquisition.gov.
Notice text
2 versions
Update #2 · Latest ·
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
Update #1 ·
This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.
Notice history
| Notice | Type | Posted |
|---|---|---|
| USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement | Limited / Sole Source Justification | |
| USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement | Award Notice | |
| This notice | Solicitation | |
| USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 4420 - Sole Source - Fairbanks Morse, LLC | Naval Supply Systems Command | No set-aside | |
| PD-42-0081; Fincantieri Diesel Engine Lifestyle Management | Naval Sea Systems Command | No set-aside | |
| Fairing drive, lower | Naval Supply Systems Command | No set-aside | |
| USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s) | Naval Sea Systems Command | No set-aside | |
| Prairie air, stbd, in repair/modification of | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity