USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement
Award Notice Posted
A later notice was posted: the Limited / Sole Source Justification from .
- Solicitation number
- N5523626R0009
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N5523627C0001
- NAICS code
- 333618 Other Engine Equipment Manufacturing
- PSC
- 2815 Diesel Engines And Components
- Place of performance
- San Diego, CA 92136
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy's Naval Sea Systems Command awarded contract N5523627C0001 to Fairbanks Morse, LLC for ALCO Model 251C long lead time material (LLTM) replacement for USS BOXER (LHD-4), valued at $3.4 million, on November 3, 2026.
The award was made on a sole-source basis under FAR 12.102 as a commercial products acquisition processed under FAR Part 12, through a combined synopsis/solicitation (RFP N5523626R009). No set-aside was used. The applicable NAICS code is 333618, Other Engine Equipment Manufacturing.
Notice text
RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement. Awarded contract N5523627C0001 to FAIRBANKS MORSE, LLC for 3404926.69 on 2026-11-03.
Notice history
| Notice | Type | Posted |
|---|---|---|
| USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement | Limited / Sole Source Justification | |
| This notice | Award Notice | |
| USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement | Solicitation | |
| USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity