USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

Awarded Limited / Sole Source Justification Posted

Solicitation number
N5523626R0009
Agency
Set-aside
No set-aside

Opportunity facts

Contract number
N5523627C0001
Place of performance
San Diego, CA 92136

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Navy's Naval Sea Systems Command intends to award a sole-source contract to Fairbanks Morse Defense for replacement of ALCO Model 251C long lead time material (LLTM) for USS Boxer (LHD-4), under FAR 12.102. The action is issued as RFP N5523626R009 and is a Combined Synopsis/Solicitation for commercial products under FAR Part 12. The notice states that it is not a request for competitive proposals and that the Government alone determines whether to compete the requirement based on responses. No set-aside is used.

RFP Amendment 0001 updates the Product Description (Attachment J-1), and the full combined solicitation/synopsis is attachment 26R0009__USS_Boxer_RFP_Syn_Sol. The award record lists contract N5523627C0001 with an award date of November 3, 2026. The requirement is classified under NAICS 333618 (Other Engine Equipment Manufacturing) and PSC 2815 (Diesel Engines and Components).

Notice text

RFP Amendment 0001 is hereby posted to update the Product Description (Attachment J-1), see attachment. This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement. Awarded contract N5523627C0001 to unknown vendor for unknown amount on 2026-11-03.

Notice history

Notice Type Posted
This notice Latest Limited / Sole Source Justification
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement Award Award Notice
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement Latest solicitation Solicitation
USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
4420 - Sole Source - Fairbanks Morse, LLC NAICS 332410 Naval Supply Systems Command No set-aside
PD-42-0081; Fincantieri Diesel Engine Lifestyle Management Philadelphia, Pennsylvania 19112, United States · NAICS 333618 Naval Sea Systems Command No set-aside
Cover NAICS 333998 Naval Supply Systems Command No set-aside
N6449826R0524 - BOA Rotors Philadelphia, Pennsylvania 19112, United States · NAICS 336611 Naval Sea Systems Command No set-aside
USS john P murtha (LPD-26) engine replacement parts 3755 Brinser Street, Ste. 1 San Diego, CA 92136 92136 · NAICS 333618 Naval Sea Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors