Upgrade Fire Detection System at MCC San Diego

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
15BFA023B00000006
Agency
BOP Field Acquisition Office Regional Offices, Department of Justice
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Z2FF Repair Or Alteration Of Penal Facilities
Place of performance
San Diego, California 92101, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Prisons Field Acquisition Office is seeking a contractor to upgrade the fire detection system at the Metropolitan Correctional Center in San Diego, California. The selected contractor must provide all materials, labor, and equipment necessary to upgrade the fire detection system in accordance with the specifications and drawings provided, and complete performance within 365 calendar days of receiving the notice to proceed. Bids are due no later than August 16, 2023 and will be evaluated based on price, past performance, financial resources, and legal and ethical track record to determine contractor responsibility.

This is a total small business set-aside designated under NAICS code 238210 with a size standard of $19 million. The place of performance is 808 Union Street in San Diego, California. Two bids were received in response, ranging from $8.3 to $8.4 million. Both bids acknowledged all amendments and included bid bonds as required. The government estimate for a reasonable contract value was $8.3 million. The contractor must complete the entire project within 365 calendar days of receiving the notice to proceed.

Notice text

4 versions

Update #4 · Latest ·

The Federal Bureau of Prisons (FBOP) is issuing solicitation 15BFA023B00000006 for the award of a firm-fixed-price construction contract for a project entitled Upgrade Fire Detection System at the Metropolitan Correctional Center (MCC San Diego), located in San Diego, California.

MCC San Diego is a Federally owned facility located at 808 Union Street San Diego, CA 92101 utilized for detention of both male and female occupants prior to and during court hearings as well as inmates serving sentences.  Constructed approximately in 1974, MCC San Diego is a 12-story building with lower and upper basement, lower roof recreation area, upper roof mechanical and elevator machine room. The work included in this contract includes but is not limited to:

a. New addressable, automatic and manual fire alarm system for entire building. The Contractor will provide detailed shop drawings, prepared as a delegated-design submittal, and sealed and signed by a qualified design professional (NICET Level 3 minimum or Licensed Professional Engineer).

b. The system must include a voice evacuation system as an integral part of the fire alarm system. Voice evacuation speakers are required throughout every area that requires audible notification.

c. Fire-fighters two-way communication system must be provided. Firefighter’s twoway communication phones must be provided throughout requires locations on every floor.

d. The wiring system for this system must meet Level 3 Pathway Survivability, which will required 2-hour rated cables inside metallic conduits in this sprinklered building. All other wiring must meet Level 1 Pathway Survivability.

e. The new fire alarm system will be monitored and controlled using new UL listed central monitoring and control workstation desktop computer connected to the new fire alarm system network. The Control Room will be the location of the workstation and used as an on-premise proprietary monitoring station.

f. Select floors will be equipped with a Fire Alarm Control Units (FACU). The FACUs will generally serve floors above and below the floor where FACU is located.

g. Select floors will be equipped with one or more remote booster power supply (NAC) units and voice evacuation amplifiers for notification appliance circuits.

h. All floors above first floor will be equipped with a graphic remote annunciator near a guard stations.

i. The new fire alarm network, including voice evacuation system and two-way firefighters communication system, will be connected as a Class X system using copper. Two-way firefighters’ communication system must meet Level 3 Pathway Survivability. All other wiring must meet Level 1 Pathway Survivability.

j. Initiating circuits will be Class A. Each floor will have a combination of manual pull stations and automatic detectors.

k. Notification circuits will be Class B. All areas must have complete notification appliance coverage throughout the building.

l. Mechanical units, including roof top units and fan coil units, will be interfaced with fire alarm system for fan shut down.

m. All fire sprinkler system risers flow and tamper switches will be interfaced with the fire alarm system.

n. Post Indicator Valves (PIV) located on the exterior around the site will be interfaced with the fire alarm system. New underground conduit will be required for all PIV locations.

o. Kitchen Fire Suppression (Ansul) systems will be interfaced with the Fire Alarm System.

p. Other Fire Suppression systems, i.e. storage units with chemical or pre-action systems, will be interfaced with the Fire Alarm System.

q. Programming and configuration of the fire alarm network, central monitoring and control workstation, fire alarm control units and all associated devices and equipment.

r. Testing, inspection and commissioning of the entire system and all associated devices and equipment.

s. New 20A, 120V circuit breakers and power branch circuits from existing power panelboards to supply FACU and NAC units in each building.

t. While there are some ceiling and side access panels and hatches available, the ceiling space is congested with existing utilities in many locations. Contractor will be responsible for cutting/patching of ceilings and walls will be required to install new conduit and wiring in existing ceiling spaces.

u. It is expected that hazardous material, including but not limited to, lead-based paints and asbestos will be present at the site. Contractor is responsible for avoiding disruptions to the hazardous material where possible. Where disruption is necessary, provide mitigation as required to complete the scope of work.

v. Many of the walls are CMU/Concrete construction which will require core drilled penetrations to run the new conduit system.

w. Certifications by Contractor’s design professional stating that the installation was completed based on the detailed shop drawings and meets all applicable Code requirements and regulations. 

See the Statement of Work/Specifications attachment included with the solicitation posting for the complete requirements of the work.

The performance period for the project will be 365 Calendar Days from issuance of the notice to proceed.

The NAICS code for this requirement is 238210 with a corresponding small business size standard of $19 million. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $1,000,000 and $5,000,000. (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.)

The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions.

The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access.

If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action.

IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above.

Each bidder's www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their www.sam.gov registration and update as necessary, including the size metrics information.

This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration).

Pre-Bid Site Visit (See Instructions to Bidders):

(b) An organized site visit has been scheduled for Wednesday, July 12, 2023, at 9:00 A.M. local time

(c) Participants will meet at 808 Union Street San Diego, CA 92101

Electronic Bid Submission (See Instructions to Bidders):
Upload Bid Electronically to https://jefs.app.box.com/f/654239f7ed2245289553e0a5d5cf187d 

Amendment 1: Pre Bid Site Visit Meeting Minutes, Q&A, Bid Opening Extended to 8/16.

Amendment 2: Additional Questions and Answers, Revised Drawings, and As-Builts.

Bid Abstract: Posted

Update #3 ·

The Federal Bureau of Prisons (FBOP) is issuing solicitation 15BFA023B00000006 for the award of a firm-fixed-price construction contract for a project entitled Upgrade Fire Detection System at the Metropolitan Correctional Center (MCC San Diego), located in San Diego, California.

MCC San Diego is a Federally owned facility located at 808 Union Street San Diego, CA 92101 utilized for detention of both male and female occupants prior to and during court hearings as well as inmates serving sentences.  Constructed approximately in 1974, MCC San Diego is a 12-story building with lower and upper basement, lower roof recreation area, upper roof mechanical and elevator machine room. The work included in this contract includes but is not limited to:

a. New addressable, automatic and manual fire alarm system for entire building. The Contractor will provide detailed shop drawings, prepared as a delegated-design submittal, and sealed and signed by a qualified design professional (NICET Level 3 minimum or Licensed Professional Engineer).

b. The system must include a voice evacuation system as an integral part of the fire alarm system. Voice evacuation speakers are required throughout every area that requires audible notification.

c. Fire-fighters two-way communication system must be provided. Firefighter’s twoway communication phones must be provided throughout requires locations on every floor.

d. The wiring system for this system must meet Level 3 Pathway Survivability, which will required 2-hour rated cables inside metallic conduits in this sprinklered building. All other wiring must meet Level 1 Pathway Survivability.

e. The new fire alarm system will be monitored and controlled using new UL listed central monitoring and control workstation desktop computer connected to the new fire alarm system network. The Control Room will be the location of the workstation and used as an on-premise proprietary monitoring station.

f. Select floors will be equipped with a Fire Alarm Control Units (FACU). The FACUs will generally serve floors above and below the floor where FACU is located.

g. Select floors will be equipped with one or more remote booster power supply (NAC) units and voice evacuation amplifiers for notification appliance circuits.

h. All floors above first floor will be equipped with a graphic remote annunciator near a guard stations.

i. The new fire alarm network, including voice evacuation system and two-way firefighters communication system, will be connected as a Class X system using copper. Two-way firefighters’ communication system must meet Level 3 Pathway Survivability. All other wiring must meet Level 1 Pathway Survivability.

j. Initiating circuits will be Class A. Each floor will have a combination of manual pull stations and automatic detectors.

k. Notification circuits will be Class B. All areas must have complete notification appliance coverage throughout the building.

l. Mechanical units, including roof top units and fan coil units, will be interfaced with fire alarm system for fan shut down.

m. All fire sprinkler system risers flow and tamper switches will be interfaced with the fire alarm system.

n. Post Indicator Valves (PIV) located on the exterior around the site will be interfaced with the fire alarm system. New underground conduit will be required for all PIV locations.

o. Kitchen Fire Suppression (Ansul) systems will be interfaced with the Fire Alarm System.

p. Other Fire Suppression systems, i.e. storage units with chemical or pre-action systems, will be interfaced with the Fire Alarm System.

q. Programming and configuration of the fire alarm network, central monitoring and control workstation, fire alarm control units and all associated devices and equipment.

r. Testing, inspection and commissioning of the entire system and all associated devices and equipment.

s. New 20A, 120V circuit breakers and power branch circuits from existing power panelboards to supply FACU and NAC units in each building.

t. While there are some ceiling and side access panels and hatches available, the ceiling space is congested with existing utilities in many locations. Contractor will be responsible for cutting/patching of ceilings and walls will be required to install new conduit and wiring in existing ceiling spaces.

u. It is expected that hazardous material, including but not limited to, lead-based paints and asbestos will be present at the site. Contractor is responsible for avoiding disruptions to the hazardous material where possible. Where disruption is necessary, provide mitigation as required to complete the scope of work.

v. Many of the walls are CMU/Concrete construction which will require core drilled penetrations to run the new conduit system.

w. Certifications by Contractor’s design professional stating that the installation was completed based on the detailed shop drawings and meets all applicable Code requirements and regulations. 

See the Statement of Work/Specifications attachment included with the solicitation posting for the complete requirements of the work.

The performance period for the project will be 365 Calendar Days from issuance of the notice to proceed.

The NAICS code for this requirement is 238210 with a corresponding small business size standard of $19 million. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $1,000,000 and $5,000,000. (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.)

The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions.

The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access.

If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action.

IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above.

Each bidder's www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their www.sam.gov registration and update as necessary, including the size metrics information.

This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration).

Pre-Bid Site Visit (See Instructions to Bidders):

(b) An organized site visit has been scheduled for Wednesday, July 12, 2023, at 9:00 A.M. local time

(c) Participants will meet at 808 Union Street San Diego, CA 92101

Electronic Bid Submission (See Instructions to Bidders):
Upload Bid Electronically to https://jefs.app.box.com/f/654239f7ed2245289553e0a5d5cf187d 

Amendment 1: Pre Bid Site Visit Meeting Minutes, Q&A, Bid Opening Extended to 8/16.

Amendment 2: Additional Questions and Answers, Revised Drawings, and As-Builts.

Update #2 ·

The Federal Bureau of Prisons (FBOP) is issuing solicitation 15BFA023B00000006 for the award of a firm-fixed-price construction contract for a project entitled Upgrade Fire Detection System at the Metropolitan Correctional Center (MCC San Diego), located in San Diego, California.

MCC San Diego is a Federally owned facility located at 808 Union Street San Diego, CA 92101 utilized for detention of both male and female occupants prior to and during court hearings as well as inmates serving sentences.  Constructed approximately in 1974, MCC San Diego is a 12-story building with lower and upper basement, lower roof recreation area, upper roof mechanical and elevator machine room. The work included in this contract includes but is not limited to:

a. New addressable, automatic and manual fire alarm system for entire building. The Contractor will provide detailed shop drawings, prepared as a delegated-design submittal, and sealed and signed by a qualified design professional (NICET Level 3 minimum or Licensed Professional Engineer).

b. The system must include a voice evacuation system as an integral part of the fire alarm system. Voice evacuation speakers are required throughout every area that requires audible notification.

c. Fire-fighters two-way communication system must be provided. Firefighter’s twoway communication phones must be provided throughout requires locations on every floor.

d. The wiring system for this system must meet Level 3 Pathway Survivability, which will required 2-hour rated cables inside metallic conduits in this sprinklered building. All other wiring must meet Level 1 Pathway Survivability.

e. The new fire alarm system will be monitored and controlled using new UL listed central monitoring and control workstation desktop computer connected to the new fire alarm system network. The Control Room will be the location of the workstation and used as an on-premise proprietary monitoring station.

f. Select floors will be equipped with a Fire Alarm Control Units (FACU). The FACUs will generally serve floors above and below the floor where FACU is located.

g. Select floors will be equipped with one or more remote booster power supply (NAC) units and voice evacuation amplifiers for notification appliance circuits.

h. All floors above first floor will be equipped with a graphic remote annunciator near a guard stations.

i. The new fire alarm network, including voice evacuation system and two-way firefighters communication system, will be connected as a Class X system using copper. Two-way firefighters’ communication system must meet Level 3 Pathway Survivability. All other wiring must meet Level 1 Pathway Survivability.

j. Initiating circuits will be Class A. Each floor will have a combination of manual pull stations and automatic detectors.

k. Notification circuits will be Class B. All areas must have complete notification appliance coverage throughout the building.

l. Mechanical units, including roof top units and fan coil units, will be interfaced with fire alarm system for fan shut down.

m. All fire sprinkler system risers flow and tamper switches will be interfaced with the fire alarm system.

n. Post Indicator Valves (PIV) located on the exterior around the site will be interfaced with the fire alarm system. New underground conduit will be required for all PIV locations.

o. Kitchen Fire Suppression (Ansul) systems will be interfaced with the Fire Alarm System.

p. Other Fire Suppression systems, i.e. storage units with chemical or pre-action systems, will be interfaced with the Fire Alarm System.

q. Programming and configuration of the fire alarm network, central monitoring and control workstation, fire alarm control units and all associated devices and equipment.

r. Testing, inspection and commissioning of the entire system and all associated devices and equipment.

s. New 20A, 120V circuit breakers and power branch circuits from existing power panelboards to supply FACU and NAC units in each building.

t. While there are some ceiling and side access panels and hatches available, the ceiling space is congested with existing utilities in many locations. Contractor will be responsible for cutting/patching of ceilings and walls will be required to install new conduit and wiring in existing ceiling spaces.

u. It is expected that hazardous material, including but not limited to, lead-based paints and asbestos will be present at the site. Contractor is responsible for avoiding disruptions to the hazardous material where possible. Where disruption is necessary, provide mitigation as required to complete the scope of work.

v. Many of the walls are CMU/Concrete construction which will require core drilled penetrations to run the new conduit system.

w. Certifications by Contractor’s design professional stating that the installation was completed based on the detailed shop drawings and meets all applicable Code requirements and regulations. 

See the Statement of Work/Specifications attachment included with the solicitation posting for the complete requirements of the work.

The performance period for the project will be 365 Calendar Days from issuance of the notice to proceed.

The NAICS code for this requirement is 238210 with a corresponding small business size standard of $19 million. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $1,000,000 and $5,000,000. (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.)

The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions.

The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access.

If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action.

IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above.

Each bidder's www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their www.sam.gov registration and update as necessary, including the size metrics information.

This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration).

Pre-Bid Site Visit (See Instructions to Bidders):

(b) An organized site visit has been scheduled for Wednesday, July 12, 2023, at 9:00 A.M. local time

(c) Participants will meet at 808 Union Street San Diego, CA 92101

Electronic Bid Submission (See Instructions to Bidders):
Upload Bid Electronically to https://jefs.app.box.com/f/654239f7ed2245289553e0a5d5cf187d 

Amendment 1: Pre Bid Site Visit Meeting Minutes, Q&A, Bid Opening Extended to 8/16.

Update #1 ·

The Federal Bureau of Prisons (FBOP) is issuing solicitation 15BFA023B00000006 for the award of a firm-fixed-price construction contract for a project entitled Upgrade Fire Detection System at the Metropolitan Correctional Center (MCC San Diego), located in San Diego, California.

MCC San Diego is a Federally owned facility located at 808 Union Street San Diego, CA 92101 utilized for detention of both male and female occupants prior to and during court hearings as well as inmates serving sentences.  Constructed approximately in 1974, MCC San Diego is a 12-story building with lower and upper basement, lower roof recreation area, upper roof mechanical and elevator machine room. The work included in this contract includes but is not limited to:

a. New addressable, automatic and manual fire alarm system for entire building. The Contractor will provide detailed shop drawings, prepared as a delegated-design submittal, and sealed and signed by a qualified design professional (NICET Level 3 minimum or Licensed Professional Engineer).

b. The system must include a voice evacuation system as an integral part of the fire alarm system. Voice evacuation speakers are required throughout every area that requires audible notification.

c. Fire-fighters two-way communication system must be provided. Firefighter’s twoway communication phones must be provided throughout requires locations on every floor.

d. The wiring system for this system must meet Level 3 Pathway Survivability, which will required 2-hour rated cables inside metallic conduits in this sprinklered building. All other wiring must meet Level 1 Pathway Survivability.

e. The new fire alarm system will be monitored and controlled using new UL listed central monitoring and control workstation desktop computer connected to the new fire alarm system network. The Control Room will be the location of the workstation and used as an on-premise proprietary monitoring station.

f. Select floors will be equipped with a Fire Alarm Control Units (FACU). The FACUs will generally serve floors above and below the floor where FACU is located.

g. Select floors will be equipped with one or more remote booster power supply (NAC) units and voice evacuation amplifiers for notification appliance circuits.

h. All floors above first floor will be equipped with a graphic remote annunciator near a guard stations.

i. The new fire alarm network, including voice evacuation system and two-way firefighters communication system, will be connected as a Class X system using copper. Two-way firefighters’ communication system must meet Level 3 Pathway Survivability. All other wiring must meet Level 1 Pathway Survivability.

j. Initiating circuits will be Class A. Each floor will have a combination of manual pull stations and automatic detectors.

k. Notification circuits will be Class B. All areas must have complete notification appliance coverage throughout the building.

l. Mechanical units, including roof top units and fan coil units, will be interfaced with fire alarm system for fan shut down.

m. All fire sprinkler system risers flow and tamper switches will be interfaced with the fire alarm system.

n. Post Indicator Valves (PIV) located on the exterior around the site will be interfaced with the fire alarm system. New underground conduit will be required for all PIV locations.

o. Kitchen Fire Suppression (Ansul) systems will be interfaced with the Fire Alarm System.

p. Other Fire Suppression systems, i.e. storage units with chemical or pre-action systems, will be interfaced with the Fire Alarm System.

q. Programming and configuration of the fire alarm network, central monitoring and control workstation, fire alarm control units and all associated devices and equipment.

r. Testing, inspection and commissioning of the entire system and all associated devices and equipment.

s. New 20A, 120V circuit breakers and power branch circuits from existing power panelboards to supply FACU and NAC units in each building.

t. While there are some ceiling and side access panels and hatches available, the ceiling space is congested with existing utilities in many locations. Contractor will be responsible for cutting/patching of ceilings and walls will be required to install new conduit and wiring in existing ceiling spaces.

u. It is expected that hazardous material, including but not limited to, lead-based paints and asbestos will be present at the site. Contractor is responsible for avoiding disruptions to the hazardous material where possible. Where disruption is necessary, provide mitigation as required to complete the scope of work.

v. Many of the walls are CMU/Concrete construction which will require core drilled penetrations to run the new conduit system.

w. Certifications by Contractor’s design professional stating that the installation was completed based on the detailed shop drawings and meets all applicable Code requirements and regulations. 

See the Statement of Work/Specifications attachment included with the solicitation posting for the complete requirements of the work.

The performance period for the project will be 365 Calendar Days from issuance of the notice to proceed.

The NAICS code for this requirement is 238210 with a corresponding small business size standard of $19 million. Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude of the project lies between $1,000,000 and $5,000,000. (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the project has necessarily been estimated/budgeted to the maximum of the selected range. It merely conveys that the estimate/budget lies somewhere within that range.)

The solicitation will be distributed solely through the Contract Opportunity website at https://www.sam.gov. Hard copies of the solicitation will not be made available. The website provides download instructions.

The "Sensitive /Secure package Upload" option will be selected for this procurement. All secure/locked documents uploaded, to include the solicitation, will require an active SAM vendor registration to obtain access. In addition, only those vendors who have been issued a valid Marketing Partner Identification Number (MPIN) from www.sam.gov will be granted access. If your firm does not have the NAICS code listed in www.sam.gov required for this solicitation, an email may be forwarded to your firm requesting an explanation as to why your firm should be granted access.

If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action.

IMPORTANT: Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in https://www.sam.gov. In order to qualify for award, your business size metrics information entered in your www.sam.gov SAM registration must be less than or equal to the size standard specified above.

Each bidder's www.sam.gov registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement. All bidders are urged to double check their www.sam.gov registration and update as necessary, including the size metrics information.

This is a 100 percent small business set-aside. You must be registered in www.sam.gov as a small business (see FAR provision 52.219-1 in the Representations & Certifications section of your www.sam.gov registration).

Pre-Bid Site Visit (See Instructions to Bidders):

(b) An organized site visit has been scheduled for Wednesday, July 12, 2023, at 9:00 A.M. local time

(c) Participants will meet at 808 Union Street San Diego, CA 92101

Electronic Bid Submission (See Instructions to Bidders):
Upload Bid Electronically to https://jefs.app.box.com/f/654239f7ed2245289553e0a5d5cf187d 

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Abstract.pdf PDF
Additional Questions and Answer SDC Final.pdf PDF
AMEND 00002 SDC.pdf PDF
Pre Bid Site Visit Meeting Minutes.pdf PDF
Questions and Answer SDC Final.pdf PDF
AMEND 00001 SDC.pdf PDF
6 - Bid Bond SF24.pdf PDF
5 - Construction Wage Rate.pdf PDF
2 - Solicitation.pdf PDF
7 - Criminal History Check Form.pdf PDF
1 - Instructions to Bidders.pdf PDF
Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Upgrade Fire Detection System at MCC San Diego Award Award Notice
Upgrade Fire Detection System at MCC San Diego This notice · Latest solicitation Solicitation
Upgrade Fire Detection System at MCC San Diego Pre-Solicitation
Upgrade Fire Detection System at MCC San Diego Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity