Pre Bid Site Visit Meeting Minutes.pdf

PDF 414 KB Posted

Attached to
Upgrade Fire Detection System at MCC San Diego Federal contract opportunity
Solicitation number
15BFA023B00000006
Issued by
Department of Justice Bureau of Prisons Field Acquisition Office

About this file

The document summarizes the minutes from a pre-bid site visit meeting for solicitation number 15BFA023B00000006 to upgrade the fire detection system at the Metropolitan Correctional Center in San Diego. The key details are that the Bureau of Prisons is seeking bids to upgrade the fire detection system with a project magnitude between $1 million to $5 million. The deadline for bids is August 2, 2023 by 2:00 pm CST and bids must be submitted electronically through the JEFS APP BOX. The period of performance is 365 calendar days from notice to proceed with liquidated damages of $678.21 per day for delays. Work hours on site will be weekdays from 6:00 am to 2:00 pm excluding federal holidays. Monthly progress meetings will be required.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Fire Detection System at MCC San Diego, newest first.
File Type Posted
Bid Abstract.pdf PDF
Additional Questions and Answer SDC Final.pdf PDF
AMEND 00002 SDC.pdf PDF
Questions and Answer SDC Final.pdf PDF
AMEND 00001 SDC.pdf PDF
5 - Construction Wage Rate.pdf PDF
2 - Solicitation.pdf PDF
7 - Criminal History Check Form.pdf PDF
1 - Instructions to Bidders.pdf PDF
6 - Bid Bond SF24.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-BID CONFERENCE MEETING MINUTES

15BFA023B00000006 – UPGRADE FIRE DETECTION SYSTEM

MCC SAN DIEGO - PROJECT 23Z6AK2

1 | P a g e

DATE: Wednesday, July 12, 2023, at 9:00 A.M. local time Place: Gary Lee Rowe Conference Room

CONTRACTING OFFICER (KERRI SWITZER):

I. INTRODUCTIONS:

Round table introduction of all attendees:

Kerri Switzer, BOP, Supervisory Contract specialist Jeffrey Spear, BOP, Business Administrator Kyle Ball, BOP, Facilities Manager Eric Hyde, BOP, Engineering Technician Lane Smith, Johnson Controls Sean Reece, Precision Construction Rich Vivrette, American Alarm Joe Tanck, Sygnal Systems

II. PURPOSE OF MEETING:

Indicate the purpose of this meeting is to familiarize the contractor with the unique circumstances and requirements surrounding a correctional setting. This meeting is also to explain the solicitation, as issued, and not to furnish additional information.

State - nothing said here shall be interpreted as a change to the solicitation without the issuance of a formal amendment through the FAO Contracting Officer, Martin Guidry.

III. MINUTES:

Advised minutes will be recorded and distributed via www.sam.gov.

IV. SITE VISIT INFORMATION:

After introductions and simple background information regarding the project, all participants walked through the institution to see the scope of the project in person. The tour went to the roof to look at the elevator, control room, and commissary. The tour then proceeded to the 12th floor housing unit to see a housing unit with cells and then to the 8th floor to see a dormitory style housing unit. Afterwards, the tour went to the basement to see the Facilities, Food Service, and the Warehouse areas. All meeting participants departed at approximately 10:30 a.m.

V. FRONT COVER PAGE FORMS AND INSTRUCTIONS:

Special instructions pertaining to electronic bid submission (FAR 14.302 & FAR 14.304) *Submit: Bid Submission Cover Page, SF1442 pages 1, 2, 4, and 43 through 51, and the Bid Bond, shall be uploaded as a single Adobe PDF attachment at JEFS APP BOX, see link below:

https://jefs.app.box.com/f/654239f7ed2245289553e0a5d5cf187d https://jefs.app.box.com/f/654239f7ed2245289553e0a5d5cf187d

2 | P a g e

Bids submitted by mail or hand carried will not be evaluated. It is the responsibility of the Bidder to confirm receipt of bids by contacting Martin Guidry by email at mguidry@bop.gov. All Bids received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR).

Electronic Bid submissions must include a scanned copy of the original bid guarantee. The original bid guarantee with “wet” signature, raised seal, and bid bond number (if applicable) must be mailed to the below address and received by the bid opening time and date:

Federal Bureau of Prisons U.S. Armed Forces Reserve Complex ATTN: Martin Guidry 346 Marine Forces Drive Grand Prairie, TX 75051

VI. TIME FRAMES AND LOCATION FOR SUBMISSION OF BIDS:

The deadline for submission of bids for this project is August 2, 2023, by 2:00 p.m. CST. See Instruction to Bidders for electronic bid submission guidance.

VII. GENERAL TOPICS:

The following submission/completion items will be addressed:

1. From the solicitation, each bidder SHALL complete and submit the following forms, clauses, and statements with his/her bid. Failure to do so may cause your bid to be considered as non-responsive:

• BID SUBMISSION COVER PAGE: Please include Name of Company, UEI number, and Bid Bond mail (Fedex, UPS, USPS) tracking number.

• STANDARD FORM 1442 Pages 1, 2, 4, and 43 through 51: Please include DUNS number, Tax ID# and e-mail address where indicated in block 10, and complete blocks 14-20c. If your company has a “doing business as” name reflected in your SAM registration, include this name as well in Block 14. Ensure the address typed in Block 14 matches the address in your SAM registration.

• PAST PERFORMANCE SUBMISSION: Please ensure the Cover Letter is reviewed and complied with its entirety. References and banking submissions must be submitted before bid opening directly to mguidry@bop.gov via email. CPARS entries are also acceptable.

• COMMODITY OR SERVICES SCHEDULE (PAGE 4): Complete the Unit Price (JB = job) and

Amount Blocks (these amounts will be the same). Note: The amounts listed in this section should be the same as the amount listed in Block 17 of the SF-1442.

• BID GUARANTEE: See Page 5 of the solicitation. A bid bond must be submitted in original (ink signatures) with your solicitation. The penal sum of the bond must be at least 20% of the bid price, not to exceed $3 million, whichever is less. A blank bid bond was included in the mailto:mguidry@bop.gov mailto:mguidry@bop.gov

3 | P a g e solicitation. The bid bond must be from a government approved surety. A list of approved sureties can be located on the Department of Treasury, Bureau of the Fiscal Service website.

Electronic bid submissions must include a scanned copy of the original bid guarantee. The original bid guarantee with “wet” signature, raised seal and bid bond number (if applicable) must be mailed to the below address and received by the bid opening time and date:

Federal Bureau of Prisons U.S. Armed Forces Reserve Complex ATTN: Martin Guidry 346 Marine Forces Drive Grand Prairie, TX 7505

• REPRESENTATIONS AND CERTIFICATIONS: All contractors submitting a bid must be registered in the System for Award Management (SAM) at www.sam.gov with the North American Industry Classification Standard code (NAICS) 238210 which is applicable to this acquisition.

• FAR PROVISION 52.204-8: Pursuant to the section (b) (1) of this provision, provision 52.204-7 is included in this solicitation. Therefore, offerors should select (i) Paragraph (d).

• FAR PROVISION 52.204-24: Pursuant to the section of this provision, (d). Check either will or will not.

• FAR PROVISION 52.209-7: Pursuant to the section of this provision, (b). Check either has or has not.

• FAR PROVISION 52.209-13: Pursuant to section (b) of this provision, Certification. Bidder shall check either (1) or (2).

• FAR PROVISION 52.229-11: Pursuant to section (d) of this provision, Certification. Bidder shall complete item (d)(1)&(2) as applicable.

• AMENDMENTS: Amendments (if any) must be acknowledged and submitted with the bid by one of the methods as described in item 11 of the Standard Form 30.

2. Other general items to be addressed:

• DAVIS BACON ACT: This contract is subject to the Davis Bacon Act. Wage Decision

CA20230001 is applicable for this area. All applicable workers must be paid according to the terms of the wage decision.

• HIRING GOALS: Hiring goals for this project are 16.9% for minorities and 6.9% for females – A

“Good Faith” effort should be put forth by the contractor to achieve these goals.

• LICENSING AND PERMITS: All required licensing and permits are required to be obtained by the contractor who receives contract award.

http://www.sam.gov/

4 | P a g e

• MAGNITUDE: The magnitude of the project is between $1,000,000 and $5,000,000.

• WORK HOURS: Work hours within the secure perimeter shall be between 6:00 a.m. to 2:00 p.m., Monday through Friday, excluding weekends and federal holidays.

• COR: The Contracting Officer’s Representative (COR) is Mr. Kyle Ball, Facilities Manager, at MCC San Diego.

• PERIOD OF PERFORMANCE: The completion period is 365 calendar days after issuance of notice to proceed.

• TIME EXTENSIONS: Time extensions for inclement weather will not be granted unless the weather is unusually severe and abnormal in comparison to prior years.

• LIQUIDATED DAMAGES: Liquidated damages for this project are in the amount of $678.21 per calendar day of delay after scheduled completion.

• PRE-CONSTRUCTION CONFERENCE: A Pre-Construction conference is required after the contract is awarded and will be scheduled accordingly.

• PROGRESS SCHEDULE: A copy of the progress schedule is to be provided to the Contracting

Officer and COR as soon as possible. Each time the progress schedule is changed, it must be provided to both the Contracting Officer and COR. It is suggested an updated document be provided by the Prime Contractor at the mandatory monthly progress meeting.

• PROGRESS MEETINGS: Progress meetings are mandatory and will be scheduled monthly.

• PAYMENT REQUESTS: Application for payments are to be submitted on AIA G702 (Continuation) or the contractors own form as long as the information is similar to the G702.

Contactors can get these forms from the following website www.aiabookstore.com.

• QUESTIONS: Oral questions asked at Site Visit of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. All questions shall be sent in WORD FORMAT to Martin Guidry, FAO Contracting Officer, via email at mguidry@bop.gov. In order to provide sufficient response time prior to the bid due date, the Government has established that questions be submitted no later than July 14, 2023, at 12:00 p.m., CST.

• ACCESS TO SITE/PARKING OF VEHICLES: Parking will be provided for employee vehicles and contractor work vehicles.

• STORAGE OF MATERIALS: Storage of materials will be coordinated with the COR.

• CONTRACTOR TEMPORARY OFFICE: No temporary office space will be provided.

• INSPECTIONS: "Punch List" items generated by inspections will be corrected and discrepancy http://www.aiabookstore.com/

5 | P a g e items re-inspected and approved before contract closure takes place. Should any work be covered without proper notification, the contractor shall uncover that work for inspection at his own expense.

SAFETY MANAGER DASHMOND SYLVESTER (COVERED BY K. BALL):

3. SAFETY POINTS:

• The contractor is responsible for providing required protective gear to all contractor workers, should it be required. Contractor will ensure that all workers have proper safety gear at all times.

• Contractor is responsible for the prevention of accidents on the project site and has spill kit onsite and containment procedures. OSHA requirements will be adhered to.

• The contractor will have a Safety Representative onsite at all times during the completion of this project.

• Proper storage of any chemicals must be discussed with the Safety Department.

CAPTAIN LUIS GONZALEZ (COVERED BY K. BALL):

4. SECURITY:

• ADVERSE WEATHER: Whenever adverse weather conditions or other institution emergency contingencies are in effect, contract workers will not be permitted passage into the secure institution. Should emergency conditions be implemented while contract workers are inside the secure perimeter, they will be required to secure their tools, remove vehicles and equipment, and leave the institution grounds until the emergency situation has been resolved.

Depending upon the nature of the emergency, this normally will not affect any construction outside of the secure perimeter. Contractor is reminded that fog days will be treated like rain days. The performance period of 365 days will allow adequate time to complete the job, and no consideration will be allowed for normal rain days and normal fog days. The normal rain, snow or fog days will be based on the average over the last ten (10) years for the local community.

• SECURITY CLEARANCES: Contract workers are subject to security investigative procedures.

Please refer to the contract for details. Refer to Page 8 of the solicitation.

• EMPLOYEE IDENTIFICATION: Contractor personnel working on project site must bring valid photo identification to the institution each day. The identification will be surrendered upon entry and returned upon exit from institution property.

• TOOL ACCOUNTABILITY: Strict accountability and control of all contractor tools and hazardous materials must be maintained at all times. All contractor tools to be used inside the secure perimeter must be inventoried and accounted for at the conclusion of the work day.

Contractor tools may not be stored onsite overnight. The contractor should provide for enough

6 | P a g e time at the conclusion of the work day for the return and accounting of all tools issued during the work day. Lost or missing tools must be reported immediately to the COR and the Captain.

• ILLEGAL ITEMS ON FEDERAL PROPERTY: Firearms, ammunition, knives, other weapons, drugs, narcotics, and alcoholic beverages are not permitted inside/outside the secure perimeter or anywhere else on Federal property at any time. This includes the private vehicles of contract workers. Violators will be subject to criminal prosecution. All persons, vehicles, and equipment are subject to search by institution authorities at any time.

• NO CONTACT WITH INMATES: Contract workers are not to have any contact with inmates at any time. No photographs may be taken of inmates.

• CONTRACTOR EMPLOYEE WORK DRESS: Green or khaki‐colored clothing is not allowed, as inmates wear these colors.

• PHOTOGRAPHS: The institution’s Facilities Department maintains a digital camera that will be utilized by BOP staff to document the project work. The contractor may request copies of these photos and may request that photos be taken for specific conditions. Cellular telephones equipped with photographic capabilities are prohibited on the project construction site.

VIII. ADDITIONAL DISCUSSION:

Contractors were advised that any RFI questions or concerns with the statement of work or scope of the requirements were to go through Martin Guidry at FAO. Some vendors had a few technical questions they wanted to get answered.

Meeting minutes recorded by:

Kerri Switzer, Supervisory Contract Specialist MCC San Diego

NOTICE:

MEETING MINUTES ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THEY ARE NOT

INTENDED TO CHANGE ANY SPECIFICATIONS, TERMS OR CONDITIONS OF THE

SOLICITATION. ANY AND ALL CHANGES TO THE SOLICITATION SHALL BE ISSUED IN

SUBSEQUENT AMENDMENTS ISSUED BY THE CONTRACTING OFFICER ON A STANDARD

FORM 30 (SF-30).

NAME

~ c.½~@ .... ~e..~, ./ V

€tz.1t t\'(0€

I{'- \~ - /) i4-u

L, ~It ~.-(1 IT'-f

Se:AN i2e-ec..€

'Dtc~ Vtv~ ~ e ,~c. ~

~=UI S-,u ~

SITE VISIT

METROPOLITAN CORRECTIONAL CENTER SAN DIEGO

PROJECT 23Z6AK2 - FIRE DETECTION SYSTEM

SOLICITATION 15BFAO23800000006

June 12, 2023 @ 0900 hrs

COMPANY SIGNATURE ,.--

/?·() p ~ f3oP A ., l~u ~ ~

(CM '1 f2oL..> ~ (') Jo~~ ~ e~e('..,\ .s Lor-J C,~

~~V'\

A~CAN ALAllzv'\ ~~ ~,~, I ~ - S~?v.JAL- S'<~S '. ~ -, ~ /, c-~H ..-,_ ~

'-J

EMAIL

., )SC)e a 4 luo I "\( 1-1

• '-e(;) ., \..J

.., ~"J, bc11. "'6V - - . - ,-. 1~ '4-l(.. p ~ ,-, ,a • 'f OU

LA~.~ t\ \ I w ~ re L c~w, sr-e.ece e p"-.4's1'0-."l . Wv,'c~ \ e_, \I 1'1 .e e-'I

,A,Nt--At 4 RIY\. ~ Cb M

""Sc,c.t:J.tgc.,o,r-«\"1~~~-~ ~~,TZ~@ e>oP.~

File details come from the government source that posted it. Updated .