Tulsa ANG Fuel Facility

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
w912bv20r0031
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Tulsa OK 74115 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This notice seeks proposals for a Fuel Facility for the Oklahoma Air National Guard in Tulsa County, Oklahoma. The U.S. Army Corps of Engineers Tulsa District will award a fixed-price contract to design and construct three 50,000 gallon above-ground fuel storage tanks, two truck unloading stations, two refueler loading stations, an electrical control house, filter house, operations facility and laboratory building, refueler parking area, and an 8,000 gallon diesel and MOGAS fuel service station with dispensing equipment and buildings. Proposals will be evaluated using lowest price technically acceptable criteria. The anticipated solicitation date is May 26, 2020, with proposals due June 25, 2020.

There is no set-aside designation for this procurement. The NAICS code is 237120 for oil and gas pipeline and related structure construction, with a $36.5 million small business size standard. The project value is estimated between $10-25 million with a 545 calendar day performance period. Small businesses must perform 15% of the work cost, excluding materials, with their own employees to comply with limitations on subcontracting.

Notice text

The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract for a Fuel Facility for the OKANG in Tulsa County, Oklahoma.  The proposed project will be a competitive, firm-fixed price, design/bid/build contract procured in accordance with FAR 15, Negotiated Procurement using the Lowest Price Technically Acceptable selection process.

The Government is seeking qualified, experienced sources capable of performing the following:

 The scope includes constructing three (3) 50,000 gal (each) welded horizontal steel above-ground fuel storage tanks complete with railings and associated necessary appurtenances, two commercial truck unloading stands with equipment canopies, two re-fueler loading stands with optional equipment canopies, enclosed Electrical Control House and Open Shelter Filter house, Fuel Operations Facility(building) with fuel testing laboratory, Re-fueler Vehicle Parking with cement concrete parking, secondary containment, and R-11 maintenance building.

Additionally, the project includes constructing a Military Service Station (MSS) consisting of 8,000 gallons of diesel storage with two dispensing nozzles, 8,000 gallons of Motor Gas (MOGAS) storage with two dispensing nozzles, equipment, optional MSS dispensing area canopy, MSS Control Building, and secondary containment for tanks, offloading and dispensing. Site preparation will include extension of utility systems to site, preparation of site for above listed improvements, local streets and roads to support the above listed improvements, construction of site drainage retention and storm drainage systems; and construction of site security fencing and gates.

In accordance with DFAR 236.204, the estimated magnitude of construction for this project is: Between $10,000,000 and $25,000,000.

Estimated duration of the project is 545 calendar days.

The North American Industry Classification System code for this procurement is 237120 - Oil and Gas Pipeline and Related Structures Construction, which has a small business size standard of $36.5M.

Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, that they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement.

TYPE OF SET-ASIDE: This is an Unrestricted procurement.

Anticipated solicitation issuance date is on or about 26 May 2020, and the estimated proposal due date will be on or about 25 June 2020.

Notice history

Notice Type Posted
Tulsa ANG Fuel Facility Latest solicitation Solicitation
This notice Pre-Solicitation
Tulsa ANG Fuel Facility Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WWYK240015 - Rehab Tanks 62501E & 62501W Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center No set-aside
Child Development Center (CDC), Tinker Air Force Base, Oklahoma NAICS 236220 ENDIST Tulsa No set-aside
Mather Fueling System Repairs Mather, California 95655, United States · NAICS 237120 ENDIST Omaha Total Small Business
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan Yokota Air Base, Japan · NAICS 237120 ENDIST Japan No set-aside
WWYK250063 - install react VII facility, B9001, post V19 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Woman-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors