Summit Lake Dam Repairs and Safety Improvements
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12445525Q0063
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
- Place of performance
- Richwood, West Virginia 26261, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is soliciting proposals for comprehensive repairs and safety improvements at Summit Lake Dam, a 43-acre cold water reservoir located within the Monongahela National Forest in Greenbrier County, West Virginia. The project requires contractors to provide all labor, materials, and incidentals to complete four primary deliverables: mobilization and utility preservation, security and safety fencing improvements including gate and grate installations, concrete repairs to the primary spillway outlet involving spalling repair and sealing, and securing safe access to the primary spillway riser through gate installation. The solicitation operates under a firm fixed price procurement structure with specific technical requirements including concrete with minimum 28-day compressive strength of 4000 psi, detailed excavation procedures using crusher run limestone aggregate, and compliance with Davis-Bacon wage determinations ranging from $34.62 to $41.95 per hour depending on job classification. Proposals are due by August 18, 2025 at 1500 local time, with the government maintaining a 30-day acceptance period following submission.
This opportunity is designated as a Total Small Business set-aside under NAICS code 237990 (Other Heavy and Civil Engineering Construction), with no incumbent contractors identified in the solicitation documents. The contract establishes a 90-day performance period beginning September 5, 2025, with completion required by December 5, 2025, and contractors must begin work within 14 calendar days of receiving notice to proceed. Work is restricted to normal business hours of 7 a.m. to 5 p.m., Monday through Friday, and no performance or payment bonds are required unless the contract value exceeds $35,000. The place of performance is specified as Richwood, WV 26261, though the dam is located in Greenbrier County within the Monongahela National Forest. Contractors must maintain sam.gov registration and comply with prevailing wage requirements under Executive Orders 14026 and 13658, with minimum wage rates of $17.75 and $13.30 per hour respectively depending on contract award date.
Notice text
The contractor will provide all labor, materials, and incidentals needed to complete the repairs and safety improvements at the Summit Lake Dam.
Refer to provission FAR 52.236-27 for contact information on accessing the site. No formal site visits are scheduled at this time.
Files
| File | Type | Posted |
|---|---|---|
| Sol_12445525Q0063.pdf | ||
| Att 01_Schedule of Items (250717).docx | DOCX document | |
| Att 04_Wage Rates (250606).pdf | ||
| Att 02_SOW (250626).docx | DOCX document | |
| Att 03_Specifications (250626).docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Summit Lake Dam Repairs and Safety Improvements | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business | |
| GAOA Brainard Lake Recreation Area Deferred Maintenance | Forest Service | Total Small Business | |
| Cableway crane refurbishment | Bureau of Reclamation | No set-aside |