About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory is seeking bids for the installation of static dissipative epoxy flooring in the G-WEST (G723) laboratory of the HEERC building, covering approximately 3,000 square feet. The scope of work includes preparing the existing concrete surface, installing an ESD primer with copper grounding, applying an ESD-protective epoxy base coat, and a final urethane topcoat. The flooring must meet ESD resistance requirements of 10^6-10^9 Ohms. This is a Lowest Price Technically Acceptable (LPTA) competitive solicitation, with proposals due by 3:00 PM CST on May 29, 2024. Offerors must demonstrate at least 10 years of experience with similar projects, provide a bid guarantee, and submit required safety documentation.
This solicitation has no set-aside designations and does not mention any incumbent contractors. The period of performance is 30 days, and the contractor will require specific electrical power and direct dock access for deliveries. The installation is expected to take 5-6 days working all areas simultaneously. The place of performance is Batavia, Illinois, 60510.
Notice text
3 versions
Update #3 · Latest ·
On 5/23/2024, Amendment 01 was added to this solicitation. Please see documents titled, "Amendment 01" & "Floor Pic 1-3."
On 5/29/2024, Amendment 02 was added to this solicitation. Minor changes to SOW description and proposal due date extension until 06/07/2024.
Scope of Work: STATIC DISSIPATIVE FLOORING
The general scope of this project is to prepare and lay ESD protective epoxy floor in G-WEST (G723) laboratory in the HEERC building (approximately 3,000 sqf).
Grind and/or shotblast existing surface for proper adhesion of applied product
Install Dur-A-Flex Dur-A-Gard ESD Primer with copper grounding tape, grounding points provided by others.
Install Dur-A-Flex ESD Gard
Install Dur-A-Flex Armor Top ESD urethane
Per site visit all existing caulk to remain, installation will terminate at caulk lines
Installation duration 5-6 days working all areas simultaneously
Pricing based on open box install if walls have been installed need to see wall plan and/or visit site.
Requirements: ESD protective floor within the range 10^6-10^9 Ohms.
Tasks:
1. Grind existing concrete floor to remove sealer and open up new concrete
2. Honour service trenches and vibration isolation trenches
3. Slope floor to level floor around trenches
4. Prime floor with penetrating moisture tolerant primer
5. Base coat floor with appropriate ESD protective epoxy
6. Lay out copper stripes and ground floor
7. Finish and clean-up floor.
Period of Performance: 30 Days
Update #2 ·
On 5/23/2024, Amendment 01 was added to this solicitation. Please see documents titled, "Amendment 01" & "Floor Pic 1-3."
Scope of Work: STATIC DISSIPATIVE FLOORING
The general scope of this project is to prepare and lay ESD protective epoxy floor in G-WEST (G723) laboratory in the HEERC building (approximately 3,000 sqf).
Grind and/or shotblast existing surface for proper adhesion of applied product
Install Dur-A-Flex Dur-A-Gard ESD Primer with copper grounding tape, grounding points provided by others.
Install Dur-A-Flex ESD Gard
Install Dur-A-Flex Armor Top ESD urethane
Per site visit all existing caulk to remain, installation will terminate at caulk lines
CCI will require specific power as noted below, CCI will provide pigtails to be wired by others.
CCI must have direct dock access for deliveries
Installation duration 5-6 days working all areas simultaneously
Pricing based on open box install if walls have been installed need to see wall plan and/or visit site.
Requirements: ESD protective floor within the range 10^6-10^9 Ohms.
Tasks:
1. Grind existing concrete floor to remove sealer and open up new concrete
2. Honour service trenches and vibration isolation trenches
3. Slope floor to level floor around trenches
4. Prime floor with penetrating moisture tolerant primer
5. Base coat floor with appropriate ESD protective epoxy
6. Lay out copper stripes and ground floor
7. Finish and clean-up floor.
Period of Performance: 30 Days
Update #1 ·
Scope of Work: STATIC DISSIPATIVE FLOORING
The general scope of this project is to prepare and lay ESD protective epoxy floor in G-WEST (G723) laboratory in the HEERC building (approximately 3,000 sqf).
Grind and/or shotblast existing surface for proper adhesion of applied product
Install Dur-A-Flex Dur-A-Gard ESD Primer with copper grounding tape, grounding points provided by others.
Install Dur-A-Flex ESD Gard
Install Dur-A-Flex Armor Top ESD urethane
Per site visit all existing caulk to remain, installation will terminate at caulk lines
CCI will require specific power as noted below, CCI will provide pigtails to be wired by others.
CCI must have direct dock access for deliveries
Installation duration 5-6 days working all areas simultaneously
Pricing based on open box install if walls have been installed need to see wall plan and/or visit site.
Requirements: ESD protective floor within the range 10^6-10^9 Ohms.
Tasks:
1. Grind existing concrete floor to remove sealer and open up new concrete
2. Honour service trenches and vibration isolation trenches
3. Slope floor to level floor around trenches
4. Prime floor with penetrating moisture tolerant primer
5. Base coat floor with appropriate ESD protective epoxy
6. Lay out copper stripes and ground floor
7. Finish and clean-up floor.
Period of Performance: 30 Days
Files
| File | Type | Posted |
|---|---|---|
| Floor Pic 3.jpg | JPG image | |
| Floor Pic 1.jpg | JPG image | |
| Amendment 01.pdf | ||
| Floor Pic 2.jpg | JPG image | |
| Construction Insurance Requirements.pdf | ||
| Section 013300_Submittals.docx | DOCX document | |
| 348175 Floor Epoxy Scope of Work.docx | DOCX document | |
| 013100_ESH_Requirements_3-2022 (1).docx | DOCX document | |
| FL-42 (Rev 12.22) - Payment Bond.pdf | ||
| WD IL20240008 (1-05-2024).pdf | ||
| Statement and Acknowledgment SF1413.pdf | ||
| ESH_Requirements_3-2022 (1).docx | DOCX document | |
| PUR-466_Proposal Certifications.pdf | ||
| FRA General Terms and Conditions for Construction (03.2024).pdf | ||
| Fermilab Subcontractor Safety Information Questionnaire.pdf | ||
| 1.0 RFP Instructions to Offerors.pdf | ||
| SARC_Subcontractor Annual RepsCerts Rev 3.pdf | ||
| FL-41 (Rev 12.22) - Bid Bond.pdf | ||
| Section 014100 Quality Requirements - March 2022.pdf | ||
| Proposal Form.doc | DOC document | |
| 010010_General_Requirements_3_2022 (1).docx | DOCX document |
Show all 21
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity