Proposal Form.doc
DOC document 38 KB Posted
- Attached to
- Static Dissipative Flooring
- Solicitation number
- ISD-348175-SCM
About this file
This document is a Proposal Form related to a federal contract opportunity for Static Dissipative Flooring, Solicitation Number ISD-348175-SCM, issued by the Department of Energy Fermi National Accelerator Laboratory.
The scope of work requires preparing and laying ESD protective epoxy floor in the G-WEST (G723) laboratory in the HEERC building, approximately 3,000 square feet. The key tasks include grinding the existing concrete floor, honoring service and vibration isolation trenches, priming the floor with a moisture tolerant primer, applying a base coat of ESD protective epoxy, laying out copper stripes and grounding the floor, and final cleanup. The flooring must meet ESD resistance requirements between 10^6-10^9 Ohms. The period of performance is 30 days. The contract will require specific electrical power, and the contractor will need direct dock access for deliveries. Installation is expected to take 5-6 days working all areas simultaneously.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Floor Pic 3.jpg | JPG image | |
| Floor Pic 2.jpg | JPG image | |
| Floor Pic 1.jpg | JPG image | |
| Amendment 01.pdf | ||
| Construction Insurance Requirements.pdf | ||
| Section 013300_Submittals.docx | DOCX document | |
| 348175 Floor Epoxy Scope of Work.docx | DOCX document | |
| SARC_Subcontractor Annual RepsCerts Rev 3.pdf | ||
| FL-41 (Rev 12.22) - Bid Bond.pdf | ||
| Section 014100 Quality Requirements - March 2022.pdf | ||
| 010010_General_Requirements_3_2022 (1).docx | DOCX document | |
| WD IL20240008 (1-05-2024).pdf | ||
| Statement and Acknowledgment SF1413.pdf | ||
| ESH_Requirements_3-2022 (1).docx | DOCX document | |
| PUR-466_Proposal Certifications.pdf | ||
| FRA General Terms and Conditions for Construction (03.2024).pdf | ||
| Fermilab Subcontractor Safety Information Questionnaire.pdf | ||
| 1.0 RFP Instructions to Offerors.pdf | ||
| 013100_ESH_Requirements_3-2022 (1).docx | DOCX document | |
| FL-42 (Rev 12.22) - Payment Bond.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT II
REFERENCE
| REQUEST FOR PROPOSAL |
| REQUEST FOR PROPOSAL NO. |
| FERMILAB |
| 343522 |
| C O N S T R U C T I O N S U B C O N T R A C T |
| DATE |
| September 8, 2023 |
NAME AND LOCATION OF PROJECT
ICB Cavity Storage shed The project is located at the ICB Building on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois, in DuPage County.
TO:
Fermi National Accelerator Laboratory
P. O. Box 500 – Mail Station 210
Batavia, Illinois 60510-0500
(Date of Offer)
Please enter your total cost in words and numbers:
(Dollars) ($
) Lump Sum Price
TERM OF PAYMENT: ___________________ (Net 30 Days unless otherwise specified)
This Offer may be accepted for a period of Ninety (90) calendar days after the opening date unless the offeror specifies a longer acceptance period than Fermilab’s minimum requirement. The REPRESENTATIONS, CERTIFICATIONS & ACKNOWLEDGEMENTS (FL-6) is made a part of this subcontract.
ENCLOSED IS BID GUARANTEE, CONSISTING OF:
IN THE AMOUNT OF
NAME OF BIDDER (Type or Print)
FULL NAME OF ALL PARTNERS (Type or Print)
BUSINESS ADDRESS (Type or Print) Include Zip Code
EMPLOYER I.D. NO.
BY (Signature in ink) (Print or Type Name)
TITLE (Print or Type)
DIRECTIONS FOR SUBMITTING OFFERS
ENVELOPES CONTAINING OFFER, GUARANTEE, ETC., SHALL BE SEALED AND MARKED AS FOLLOWS
(See Paragraph 26.0, Addendum to FL-14 – Submissions of Offers)
| REQUEST FOR PROPOSAL NO: |
| 343522 |
| TITLE OF PROJECT: |
| ICB CAVITY STORAGE SHED |
| DUE DATE AND TIME: |
| September 15, 2023 |
3:00 P.M. Central Standard Time
LOCATION:
Email: smercil@fnal.gov Proposal submission via the online solicitation platform (Cloud) is encouraged.
THE OFFEROR SHALL SUBMIT THIS COMPLETED FORM WITH THEIR WRITTEN PROPOSAL
File details come from the government source that posted it. Updated .