Floor Pic 1.jpg

JPG image 64 KB Posted

Attached to
Static Dissipative Flooring
Solicitation number
ISD-348175-SCM
Issued by

About this file

This document appears to be a Solicitation for the procurement of static dissipative flooring for the G-WEST (G723) laboratory in the HEERC building at the Department of Energy Fermi National Accelerator Laboratory. The scope of work includes preparing the existing concrete floor, installing an ESD protective epoxy flooring system, and laying out copper grounding stripes. The required performance period is 30 days. The flooring system must meet ESD resistance requirements of 10^6-10^9 Ohms. Key tasks include grinding the existing concrete, honoring service trenches, priming the floor, applying the ESD epoxy base coat, and laying the copper grounding. The contractor will require direct dock access for deliveries and specific power requirements. Pricing is based on an open box installation, and the contractor should plan to work all areas simultaneously to complete the project within the 5-6 day installation duration.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .