SPRNCA Boundary Fence Reconstruction Phase II
Closed Solicitation Posted
Not the latest version. See the latest special notice from .
- Solicitation number
- 140L0625B0003
- Agency
-
National Office
Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238990 All Other Specialty Trade Contractors
- Points of contact
-
- Paula Johnson pjohnson@blm.gov
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management (BLM) is seeking a small business contractor to perform boundary fence reconstruction at the San Pedro Riparian National Conservation Area (SPRNCA) in Cochise County, Arizona. The project involves five phases (1B, 1C, 1D, Option 2B, and Option 3A) that will reconstruct approximately 28.54 miles of boundary fencing to conserve and protect the conservation area's values as outlined in Public Law 100-696. Key contract requirements include vegetation clearing, installing T-posts, stress panels, stretch panels, end and corner panels, panel gates, and removing non-functioning fence materials. Contractors must use specific equipment including trucks, UTVs, skid steer loaders, backhoes, and pneumatic drivers. The solicitation is an Invitation for Bid (IFB) with questions due by January 17, 2025, and bids are to be submitted by February 10, 2025 at 10:00 AM Mountain Time.
The contract is a total small business set-aside under NAICS code 238990 with a size standard of $19.0M and an estimated contract value between $1-5 million. The period of performance is 455 calendar days, with work scheduled to begin on February 21, 2025, and conclude on May 22, 2026. Contractors must perform at least 25% of the work with their own employees and will be required to maintain specific insurance coverages, including workers' compensation, general liability, and automobile liability. Performance and payment bonds of 100% of the final contract amount will be required, along with a bid guarantee. The work will be conducted in the Fairbank area of Cochise County, Arizona, with complex terrain including dense vegetation and steep drainages that will require specialized fence installation techniques following BLM Manual H-1741-1 wildlife-friendly fencing standards.
Notice text
SPRNCA Boundary Fence Reconstruction Phase 1B, 1C, 1D, Option 2B and Option 3A
The Bureau of Land Management (BLM) has a construction requirement in Cochise County, Arizona for five phases of the San Pedro Riparian National Conservation Area (SPRNCA) boundary fence reconstruction and maintenance project to conserve, protect, and enhance the SPRNCA conservation values outlined in Public Law 100-696.
Reconstruction of the fence will include vegetation clearing; installation of T-posts; stress, stretch, end and corner panels; installation of panel gates; and removal of non-functioning and remnant fence or unused fence materials. Equipment needed to implement construction may include trucks, equipment trailer, UTV, skid steer loader (hydraulic driver, possibly mower, bucket), backhoe or excavator, and/or pneumatic drivers.
Files
Show all 21
Notice history
| Notice | Type | Posted |
|---|---|---|
| SPRNCA Boundary Fence Reconstruction Phase 1B, 1C, 1D, 2B and Option 3A | Special Notice | |
| This notice | Solicitation | |
| SPRNCA Boundary Fence Reconstruction, Phase II | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| Lowline Area Burned Fence Construction Project | Forest Service | Total Small Business | |
| Hickman Wildlife Water Catchment and Pipe Fence | New Mexico Region | Total Small Business | |
| Bassie spring improvement project | Nevada Region | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity