B08_ATT_6_Phase_3A_Detail.zip
ZIP file 839 B Posted
- Attached to
- SPRNCA Boundary Fence Reconstruction Phase II
- Solicitation number
- 140L0625B0003
About this file
This appears to be a technical specification file related to Phase 3A details for the SPRNCA Boundary Fence Reconstruction project, though the actual file contents are not provided in the excerpted text.
The file is associated with a Bureau of Land Management (BLM) solicitation (#140L0625B0003) for fence reconstruction and maintenance in Cochise County, Arizona. The project involves five phases of work at the San Pedro Riparian National Conservation Area (SPRNCA) including phases 1B, 1C, 1D, Option 2B and Option 3A. The scope includes vegetation clearing, installation of T-posts, stress panels, stretch panels, end and corner panels, panel gates, and removal of old/unused fencing materials. Required equipment includes trucks, equipment trailers, UTVs, skid steer loaders with attachments, backhoes or excavators, and pneumatic drivers.
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .