B08_ATT_6_Phase_3A_Detail.zip

ZIP file 839 B Posted

Attached to
SPRNCA Boundary Fence Reconstruction Phase II
Solicitation number
140L0625B0003
Issued by

About this file

This appears to be a technical specification file related to Phase 3A details for the SPRNCA Boundary Fence Reconstruction project, though the actual file contents are not provided in the excerpted text.

The file is associated with a Bureau of Land Management (BLM) solicitation (#140L0625B0003) for fence reconstruction and maintenance in Cochise County, Arizona. The project involves five phases of work at the San Pedro Riparian National Conservation Area (SPRNCA) including phases 1B, 1C, 1D, Option 2B and Option 3A. The scope includes vegetation clearing, installation of T-posts, stress panels, stretch panels, end and corner panels, panel gates, and removal of old/unused fencing materials. Required equipment includes trucks, equipment trailers, UTVs, skid steer loaders with attachments, backhoes or excavators, and pneumatic drivers.

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .