SPRNCA Boundary Fence Reconstruction, Phase II

Closed Pre-Solicitation Posted

Not the latest version. See the latest special notice from .

Solicitation number
140L0625B0003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management (BLM) is seeking a contractor to perform boundary fence reconstruction for the San Pedro Riparian National Conservation Area (SPRNCA) in Cochise County, Arizona. The project involves five phases of fence reconstruction totaling 28.21 miles, with work including vegetation clearing, T-post installation, panel placement, gate installation, and removal of non-functioning fence materials. Contractors must have an active SAM registration and unique entity identifier (UEI) number to be eligible. The solicitation will be issued as an Invitation for Bid around January 3, 2025, with proposals due 30 days after issuance. A site visit is planned for 1-2 weeks after Request for Proposal (RFP) issuance, and the government will review and potentially use submitted comments without restriction.

The contract is classified under NAICS code 238990 for All Other Specialty Trade Contractors, with a small business set-aside and a $19 million size standard. The estimated contract value ranges between $1 million and $5 million, with a total project performance period of 455 days. Equipment requirements include trucks, equipment trailers, UTVs, skid steer loaders, backhoes, excavators, and pneumatic drivers. The project is part of a broader conservation effort to protect the SPRNCA as outlined in Public Law 100-696, with specific focus on reconstructing boundary fencing across five distinct project phases. Phase lengths vary, with the longest being Phase 1C at 8 miles and the shortest being Phase 2B at 3.87 miles.

Notice text

The Bureau of Land Management (BLM) has a construction requirement in Cochise County, Arizona for five phases of the San Pedro Riparian National Conservation Area (SPRNCA) boundary fence reconstruction and maintenance project to conserve, protect, and enhance the SPRNCA conservation values outlined in Public Law 100-696. The total mileage for these five phases is 28.21 miles. All distances in this document are estimates only.

Reconstruction of the fence will include vegetation clearing; installation of T-posts; stress, stretch, end and corner panels; installation of panel gates; and removal of non-functioning and remnant fence or unused fence materials. Equipment needed to implement construction may include trucks, equipment trailer, UTV, skid steer loader (hydraulic driver, possibly mower, bucket), backhoe or excavator, and/or pneumatic drivers.

Files

File Type Posted
B01_PreSolNotice_L0625B0003_1.pdf PDF
B01_SPRNCA_II_Boundary_Fence_Specs_-_Sept17_2024_1.docx DOCX document

Notice history

Notice Type Posted
SPRNCA Boundary Fence Reconstruction Phase 1B, 1C, 1D, 2B and Option 3A Latest special notice Special Notice
SPRNCA Boundary Fence Reconstruction Phase II Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Lowline Area Burned Fence Construction Project Gunnison, Colorado, United States · NAICS 238990 Forest Service Total Small Business
Hickman Wildlife Water Catchment and Pipe Fence NM · NAICS 238910 New Mexico Region Total Small Business
AZ BL COLO 7528(1) Burro Creek Road Kingman, Arizona 86401, United States · NAICS 237310 Federal Highway Administration Total Small Business
AS3507 Fence Camp Lejeune, North Carolina 28547, United States · NAICS 236220 Naval Facilities Engineering Command Total Small Business
Bassie spring improvement project NAICS 238990 Nevada Region Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors