Snake River National Cemetery Flagpole Repair-

Closed Solicitation Posted

Solicitation number
36C78625Q0110
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Place of performance
Buhl, Idaho 83316, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs National Cemetery Administration is seeking a contractor to repair two flagpoles at the Snake River Canyon National Cemetery in Buhl, Idaho. The scope of work includes repairing a 60-foot main flagpole and a 30-foot secondary flagpole by replacing revolving trucks, internal halyard systems, flashings, collars, finial balls, and associated components, as well as replacing one floodlight and its baseplate. The damage was caused by a recent windstorm that resulted in broken cables, entangled flags, damaged truck mechanisms, and a broken floodlight. Contractors must demonstrate at least 3 years of installation experience, while manufacturers must have at least 5 years of experience, and all work must meet strict quality standards for deluxe internal halyard fixed high dimensional flagpoles with specific material requirements including aluminum and stainless steel components. The evaluation will be based solely on price, with the award going to the lowest responsive, responsible offeror. The solicitation closes on July 23, 2025 at 2:00 PM EDT, and Amendment 1 addressing Request for Information responses was posted on July 21, 2025.

This opportunity is set aside exclusively for Service-Disabled Veteran-Owned Small Business (SDVOSB) contractors who must be certified and listed in the SBA certification database. The project value is estimated to be under $25,000, falling below the simplified acquisition threshold, and will be awarded as a firm-fixed-price contract. The contractor will have 30 calendar days to complete all work from the Notice to Proceed, with operations restricted to 8:00 AM to 4:30 PM, Monday through Friday to minimize disruption to cemetery operations. Work must be performed at the Snake River Canyon National Cemetery located in Buhl, Idaho 83316, and subcontracting is limited to no more than 50% of the contract value to non-SDVOSB firms. The contractor must provide a one-year workmanship guarantee and coordinate all activities with the Contracting Officer's Representative, Robert Looney, while adhering to strict conduct standards appropriate for a national cemetery environment.

Notice text

2 versions

Update #2 · Latest ·

Snake River National Cemetery Flagpole repair

amend 1 RFIs posted 7/21

Update #1 ·

Snake River National Cemetery Flagpole repair

Files

File Type Posted
IMG_3347.jpg JPG image
IMG_3348.jpg JPG image
AMEND 1.docx DOCX document
IMG_3346.jpg JPG image
RFIs-AMEND 1.docx DOCX document
Attachment B - Section 10 75 00 Flagpoles Specification.pdf PDF
SOW.docx DOCX document
Attachment A - Pictures of damage to flagpoles.pdf PDF
36C78625Q0110 RFQ-Snake River Flagpole Repair.docx DOCX document
wage determination.pdf PDF
Attachment C - Flagpole Detail Drawing.pdf PDF
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors