Shell Falls Primary Power

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LT26Q0038
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Greybull, Wyoming 82426, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service Region 2 is soliciting construction services for the Shell Falls Primary Power project at Shell Falls Wayside in the Bighorn National Forest, Wyoming. The project requires a contractor to provide all labor, materials, equipment, licenses, and permits to address the site's primary power supply, wastewater system revisions, and water system reinstallation. Key requirements include installation of an approximately 18 kilowatt photovoltaic solar array with battery bank and propane generator backup, a 200 square foot prefabricated utility building, a 1,000-gallon buried propane tank, rehabilitation of septic and wastewater holding tanks, and water system upgrades, with all work to be completed within 24 months of the Notice to Proceed. Contractors will be evaluated on three factors: Experience and Past Performance, Technical Approach, and Price, with award based on best value determination. Written questions must be submitted by April 8, 2026 at 12:00 PM Central Time to erick.plamann@usda.gov, and proposals are due May 4, 2026 at 12:00 PM Central Time, with a mandatory pre-bid site visit scheduled for April 1, 2026 at 10:00 AM Mountain Time.

This solicitation is designated as a 100% small business set-aside under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45 million. The estimated construction magnitude is between $1,000,000 and $5,000,000, and contractors must submit a firm fixed price bid based on four lump sum work schedules: Mobilization, Site Utilities Water & Wastewater, Prefabricated Building, and PV Power Battery Bank with Propane Generator. Performance and payment bonds are required at 100% of the contract award price, due within 10 calendar days after award, and contractors must demonstrate experience on three similar previous projects. The project is located approximately 26 miles east of Greybull and 69 miles west of Sheridan along U.S. Highway 14 in Bighorn County, Wyoming, with an estimated performance period of 540 days after Notice to Proceed.

Notice text

Shell Falls Primary Power

The project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete the improvements at the Bighorn National Forest, Shell Falls Wayside addressing the site¿s primary power supply. This project aims to address on-site generated power, wastewater system revisions and water system reinstallation IAW the Statement of Work, drawings and applicable specifications.


NAICS:237990. NAICS Small Business Size Standard: $45M


Magnitude of Construction is between $1,000,000 and $5,000,000


This is solicited 100% Small Business

Organized Site Visit
Name: Christopher Wolffing
Address: Approximately 26 miles east of Greybull, and 69 miles west of Sheridan, along U.S.
Highway 14 in Bighorn County, Wyoming. The site legal description is the East ½ Section 7, T53N,
R89W.
Date and Time: April 1, 2026, 10:00 AM Mountain
Telephone: 307-674-2647
Email: Christopher.wolffing@usda.gov

Questions shall be submitted via email to erick.plamann@usda.gov and are due no later than April 8, 2026, at 12:00 PM Central Time. No other means will be accepted

Files

File Type Posted
1240LT26Q0038 A0003.pdf PDF
1240LT26Q0038 A0002.pdf PDF
Attachment 5_Packaged Engine Generators.pdf PDF
1240LT26Q0038 A0001.pdf PDF
Q and A.pdf PDF
Attachment 6 Geanerator Specs.pdf PDF
Attachment 2 SOW.pdf PDF
Attachment 1 SOI.pdf PDF
Attachment 4 Shell Falls Specs.pdf PDF
1240LT26Q0038.pdf PDF
Attachment 3 BNF Shell Falls VC plans.pdf PDF
Attachment 5 Wage Determination.pdf PDF
Show all 12

Notice history

Notice Type Posted
Shell Falls Primary Power Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming Mc Kinnon, Wyoming 82935, United States · NAICS 237110 Forest Service Total Small Business
GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho Idaho Falls, Idaho 83401, United States · NAICS 238160 Forest Service Total Small Business
GAOA Grizzly Bear Campground South Dakota, United States · NAICS 237990 Region 2 - Rocky Mountain Region Total Small Business
GRTE 237343 - Rehab 4 Lazy F Ranch NAICS 237110 National Office Total Small Business
GAOA Star Meadows MEP Repairs Utility Installations Flathead NF Whitefish, Montana 59937, United States · NAICS 238220 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity