SDVOSB Set-Aside IDIQ SATOC for Construction of Renewable Energy, Energy Conservation & Mechanical/Electrical Projects in the Southwestern Division of the USACE. (SDVOSB Energy SATOC)

Award Notice Posted

Solicitation number
W912BV-12-R-0031
Agency
Awarded
to Terra Construction, LLC
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
W912BV-12-D-0010 Federal IDV award
PSC
Not on record
Place of performance
The Sbdvosb Energy Satoc is be used primarily for Tulsa District customers, but may encompass work in other states covered by the geographic region included in the SWD Boundaries and other SWD customers., United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

The awarded amount of the Seed Task Order was $50,963.00.

Update #5 ·

The formal title of this project is: Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for Construction of Renewable Energy, Energy Conservation & Mechanical/Electrical Projects in the Southwestern Division of the USACE. ("SDVOSB Energy SATOC")

Requirement: The SDVOSB Energy SATOC (W912BV-12-R-0031) may include renewable energy projects utilizing all types of technology including, but not limited to, solar photo voltaic arrays (both ground and roof mounted); 1KW to 50 KW wind turbines; ground source heat pumps; geothermal; Heating, Ventilating, Air Conditioning (HVAC) systems with associated controls; pump repair/replacement (all types, from small sump pumps to large flood control pumps); valve replacement; electric motors; variable frequency drives; motor soft start systems; switchgear; and wiring. Location of projects could be anywhere in the USACE Southwestern Division area of responsibility, which includes all of Oklahoma, Texas, Arkansas; and portions of Kansas, Missouri, Louisiana, and New Mexico. The Offerors/Contractors must have the resources to work on multiple projects at multiple locations simultaneously. Experience with renewable energy technologies, mechanical, and electrical projects is required. Most projects will be Design-Build type projects with the Contractor responsible for the design of the entire project. A geotechnical investigation or geothermal well test boreholes may be required to be used as a basis for design.

The SDVOSB Energy SATOC will be a five year firm-fixed-price contract (base year plus four option years). The aggregate capacity will be $25M. It is to be used primarily for Tulsa District customers, but may encompass work in other states covered by the geographic region included in the SWD Boundaries and other SWD customers.

The Government intends to award this SDVOSB Energy SATOC through FAR Part 15 One-Step-Best Value Design-Build (Single Award) Source Selection. The offeror will be evaluated on the following factors: (1) Performance Capability for SDVOSB Energy SATOC; (2) Past Performance; (3) Performance Capability for a Seed Task Order (described in detail in the package) and (4) Price Proposal for Seed Task Order.


NOTE: The Seed Task Order is only the first task order to be awarded through the SATOC; other task orders for other renewable energy projects will be awarded throughout the life of the SATOC. The Contractor must be prepared to provide support for the many different types of projects described in the requirement paragraph above.

Update #4 ·

SEE AMENDMENT 2 FOR DATE CHANGE FOR PRE-PROPOSAL CONFERENCE/SITE VISIT - Due to anticipated bad weather in the Burlington, KS area, the conference/site visit will take place on THURSDAY, 22 MARCH 2012 - same place and time as given in Amendment 1.

SEE AMENDMENT 1 FOR DETAILS REGARDING THE PRE-PROPOSAL CONFERENCE/SITE VISIT SCHEDULED FOR TUESDAY, 20 MARCH 2012 AT THE USACE PROJECT OFFICE JOHN REDMOND RESERVOIR, BURLINGTON, KS.

THIS IS THE REQUIREMENTS PACKAGE FOR THE PRE-SOLICITATION NOTICE POSTED ON 2/29/2012 AND PROJECT PREVIOUSLY POSTED IN JAN 2012 AS SOURCES SOUGHT W912BV-SS(EnergySATOC).

The formal title of this project is: Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for Construction of Renewable Energy, Energy Conservation & Mechanical/Electrical Projects in the Southwestern Division of the USACE. ("SDVOSB Energy SATOC")

Requirement: The SDVOSB Energy SATOC (W912BV-12-R-0031) may include renewable energy projects utilizing all types of technology including, but not limited to, solar photo voltaic arrays (both ground and roof mounted); 1KW to 50 KW wind turbines; ground source heat pumps; geothermal; Heating, Ventilating, Air Conditioning (HVAC) systems with associated controls; pump repair/replacement (all types, from small sump pumps to large flood control pumps); valve replacement; electric motors; variable frequency drives; motor soft start systems; switchgear; and wiring. Location of projects could be anywhere in the USACE Southwestern Division area of responsibility, which includes all of Oklahoma, Texas, Arkansas; and portions of Kansas, Missouri, Louisiana, and New Mexico. The Offerors/Contractors must have the resources to work on multiple projects at multiple locations simultaneously. Experience with renewable energy technologies, mechanical, and electrical projects is required. Most projects will be Design-Build type projects with the Contractor responsible for the design of the entire project. A geotechnical investigation or geothermal well test boreholes may be required to be used as a basis for design.

The SDVOSB Energy SATOC will be a five year firm-fixed-price contract (base year plus four option years). The aggregate capacity will be $25M. It is to be used primarily for Tulsa District customers, but may encompass work in other states covered by the geographic region included in the SWD Boundaries and other SWD customers.

The Government intends to award this SDVOSB Energy SATOC through FAR Part 15 One-Step-Best Value Design-Build (Single Award) Source Selection. The offeror will be evaluated on the following factors: (1) Performance Capability for SDVOSB Energy SATOC; (2) Past Performance; (3) Performance Capability for a Seed Task Order (described in detail in the package) and (4) Price Proposal for Seed Task Order.


NOTE: The Seed Task Order is only the first task order to be awarded through the SATOC; other task orders for other renewable energy projects will be awarded throughout the life of the SATOC. The Contractor must be prepared to provide support for the many different types of projects described in the requirement paragraph above.

Update #3 ·

SEE AMENDMENT 1 FOR DETAILS REGARDING THE PRE-PROPOSAL CONFERENCE/SITE VISIT SCHEDULED FOR TUESDAY, 20 MARCH 2012 AT THE USACE PROJECT OFFICE JOHN REDMOND RESERVOIR, BURLINGTON, KS.

Update #2 ·

THIS AMENDMENT JUST CORRECTS THE FORMAL TITLE IN THE NOTICE.  NO OTHER CHANGES WERE MADE TO THE PACKAGE OR THE NOTICE.


THIS IS THE REQUIREMENTS PACKAGE FOR THE PRE-SOLICITATION NOTICE POSTED ON 2/29/2012 AND PROJECT PREVIOUSLY POSTED IN JAN 2012 AS SOURCES SOUGHT W912BV-SS(EnergySATOC).

The formal title of this project is: Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for Construction of Renewable Energy, Energy Conservation & Mechanical/Electrical Projects in the Southwestern Division of the USACE. ("SDVOSB Energy SATOC")

Requirement: The SDVOSB Energy SATOC (W912BV-12-R-0031) may include renewable energy projects utilizing all types of technology including, but not limited to, solar photo voltaic arrays (both ground and roof mounted); 1KW to 50 KW wind turbines; ground source heat pumps; geothermal; Heating, Ventilating, Air Conditioning (HVAC) systems with associated controls; pump repair/replacement (all types, from small sump pumps to large flood control pumps); valve replacement; electric motors; variable frequency drives; motor soft start systems; switchgear; and wiring. Location of projects could be anywhere in the USACE Southwestern Division area of responsibility, which includes all of Oklahoma, Texas, Arkansas; and portions of Kansas, Missouri, Louisiana, and New Mexico. The Offerors/Contractors must have the resources to work on multiple projects at multiple locations simultaneously. Experience with renewable energy technologies, mechanical, and electrical projects is required. Most projects will be Design-Build type projects with the Contractor responsible for the design of the entire project. A geotechnical investigation or geothermal well test boreholes may be required to be used as a basis for design.

The SDVOSB Energy SATOC will be a five year firm-fixed-price contract (base year plus four option years). The aggregate capacity will be $25M. It is to be used primarily for Tulsa District customers, but may encompass work in other states covered by the geographic region included in the SWD Boundaries and other SWD customers.

The Government intends to award this SDVOSB Energy SATOC through FAR Part 15 One-Step-Best Value Design-Build (Single Award) Source Selection. The offeror will be evaluated on the following factors: (1) Performance Capability for SDVOSB Energy SATOC; (2) Past Performance; (3) Performance Capability for a Seed Task Order (described in detail in the package) and (4) Price Proposal for Seed Task Order.


NOTE: The Seed Task Order is only the first task order to be awarded through the SATOC; other task orders for other renewable energy projects will be awarded throughout the life of the SATOC. The Contractor must be prepared to provide support for the many different types of projects described in the requirement paragraph above.

Update #1 ·

THIS IS THE REQUIREMENTS PACKAGE FOR THE PRE-SOLICITATION NOTICE POSTED ON 2/29/2012 AND PROJECT PREVIOUSLY POSTED IN JAN 2012 AS SOURCES SOUGHT W912BV-SS(EnergySATOC).

The formal title of this project is: Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside Independent Delivery Independent Quantity (IDIQ) Single Award Task Order Contract (SATOC) for Construction of Renewable Energy, Energy Conservation & Mechanical/Electrical Projects in the Southwestern Division of the USACE. ("SDVOSB Energy SATOC")


Requirement: The SDVOSB Energy SATOC (W912BV-12-R-0031) may include renewable energy projects utilizing all types of technology including, but not limited to, solar photo voltaic arrays (both ground and roof mounted); 1KW to 50 KW wind turbines; ground source heat pumps; geothermal; Heating, Ventilating, Air Conditioning (HVAC) systems with associated controls; pump repair/replacement (all types, from small sump pumps to large flood control pumps); valve replacement; electric motors; variable frequency drives; motor soft start systems; switchgear; and wiring. Location of projects could be anywhere in the USACE Southwestern Division area of responsibility, which includes all of Oklahoma, Texas, Arkansas; and portions of Kansas, Missouri, Louisiana, and New Mexico. The Offerors/Contractors must have the resources to work on multiple projects at multiple locations simultaneously. Experience with renewable energy technologies, mechanical, and electrical projects is required. Most projects will be Design-Build type projects with the Contractor responsible for the design of the entire project. A geotechnical investigation or geothermal well test boreholes may be required to be used as a basis for design.


The SDVOSB Energy SATOC will be a five year firm-fixed-price contract (base year plus four option years). The aggregate capacity will be $25M. It is to be used primarily for Tulsa District customers, but may encompass work in other states covered by the geographic region included in the SWD Boundaries and other SWD customers.


The Government intends to award this SDVOSB Energy SATOC through FAR Part 15 One-Step-Best Value Design-Build (Single Award) Source Selection. The offeror will be evaluated on the following factors: (1) Performance Capability for SDVOSB Energy SATOC; (2) Past Performance; (3) Performance Capability for a Seed Task Order (described in detail in the package) and (4) Price Proposal for Seed Task Order.


NOTE: The Seed Task Order is only the first task order to be awarded through the SATOC; other task orders for other renewable energy projects will be awarded throughout the life of the SATOC. The Contractor must be prepared to provide support for the many different types of projects described in the requirement paragraph above.

Files

File Type Posted
12-R-0031.Amendment 9.pdf PDF
12-R-0031.Amendment 7.pdf PDF
12-R-0031.RFI 64.pdf PDF
12-R-0031 Amendment 6 Attachment 2.pdf PDF
12-R-0031 Amendment 6 Attachment 1.pdf PDF
12-R-0031 Amendment 6 Attachment 3.pdf PDF
12-R-0031 Amendment 6 Attachment 4.pdf PDF
12-R-0031 Amendment 6.pdf PDF
SDVOSB Energy SATOC.12-R-0031.SPECIAL NOTICE.Site Visit for Canton OK.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 3.pdf PDF
Amendment 5.Extend Proposal Due Date.pdf PDF
A22 12-R-0031.Amend 4.pdf PDF
A22 12-R-0031.Amend 4.Attach 1.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 2.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 7.pdf PDF
A22 12-R-0031 Amend 3.Pre-Proposal Conf Seed TO Site Visit Info.pdf PDF
A22 12-R-0031 Amend 3.REVISED Attach 4.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 8.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 6.pdf PDF
SDVOSB Energy SATOC.12-R-0031.Additional Drawings for Seed TO.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 1.pdf PDF
SDVOSB Energy SATOC.12-R-0031.Revised Specs for Seed TO.pdf PDF
A22 12-R-0031 Amend 2.Revised Date for Site Visit.pdf PDF
12-R-0031 Amend 1 Attach 1.pdf PDF
12-R-0031 Amend 1.Site Visit Set Up.pdf PDF
SOL Attachment 3 - SOW - SDVOSB Energy SATOC.pdf PDF
SOL Attachment 4 - SOW - Seed TO - SDVOSB Energy SATOC.pdf PDF
SOL Attachment 5 - Wage Rates - Seed Task Order.pdf PDF
SOL Attachment 1 - Section 00 22 11 - Attach 1 - Experience Info.pdf PDF
SOL Attachment 2 - Section 00 22 11 - Attach 2 - PP Questionnaire.pdf PDF
A22 SOL W912BV-12-R-0031.pdf PDF
Show all 31

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors