About this file

This attachment is the Agenda that was used at the Pre-Proposal Conference/Seed TO Site Visit held on 22 March 2012.

View the file

Other files

File Type Posted
12-R-0031.Amendment 9.pdf PDF
12-R-0031.Amendment 7.pdf PDF
12-R-0031.RFI 64.pdf PDF
12-R-0031 Amendment 6.pdf PDF
12-R-0031 Amendment 6 Attachment 3.pdf PDF
12-R-0031 Amendment 6 Attachment 4.pdf PDF
12-R-0031 Amendment 6 Attachment 1.pdf PDF
12-R-0031 Amendment 6 Attachment 2.pdf PDF
SDVOSB Energy SATOC.12-R-0031.SPECIAL NOTICE.Site Visit for Canton OK.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 3.pdf PDF
Amendment 5.Extend Proposal Due Date.pdf PDF
A22 12-R-0031.Amend 4.pdf PDF
A22 12-R-0031.Amend 4.Attach 1.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 2.pdf PDF
A22 12-R-0031 Amend 3.Pre-Proposal Conf Seed TO Site Visit Info.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 8.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 6.pdf PDF
A22 12-R-0031 Amend 3.REVISED Attach 4.pdf PDF
SDVOSB Energy SATOC.12-R-0031.Additional Drawings for Seed TO.pdf PDF
SDVOSB Energy SATOC.12-R-0031.Revised Specs for Seed TO.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 1.pdf PDF
A22 12-R-0031 Amend 2.Revised Date for Site Visit.pdf PDF
12-R-0031 Amend 1 Attach 1.pdf PDF
12-R-0031 Amend 1.Site Visit Set Up.pdf PDF
A22 SOL W912BV-12-R-0031.pdf PDF
SOL Attachment 1 - Section 00 22 11 - Attach 1 - Experience Info.pdf PDF
SOL Attachment 3 - SOW - SDVOSB Energy SATOC.pdf PDF
SOL Attachment 4 - SOW - Seed TO - SDVOSB Energy SATOC.pdf PDF
SOL Attachment 5 - Wage Rates - Seed Task Order.pdf PDF
SOL Attachment 2 - Section 00 22 11 - Attach 2 - PP Questionnaire.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Army Tulsa District, Corps of Engineers

SDVOSB IDIQ SATOC for Construction of Renewable Energy, Energy Conservation & Mechanical/Electrical

Projects in the SW Division of the USACE (“SDVOSB Energy SATOC”)

SEED TO: Wind Turbine Installation at

Council Grove Lake, KS, John Redmond Lake, KS and Canton Lake, OK (“Wind Turbine Installation at Various Lakes”)

Solicitation (RFI) #: W912BV-12-R-0031

Pre-Proposal Conference/Site Visit for Seed TO – Thursday, 22 March 2012

USACE Project Office John Redmond Reservoir, Burlington, KS

AGENDA

Introductions: Contract Specialist Pamela Moody

General Information on the SDVOSB Energy SATOC: Contract Specialist Pamela Moody

General Information on Section 00 22 11 – Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best-Value Design-Build (Single Award) Contract Specialist Pamela Moody

Discussion of RFIs Submitted Prior to Conference/Site Visit

Contract Specialist Pamela Moody and Engineer Stephan Isaacs

Discussion of General Questions (see Note 1 below) Contract Specialist Pamela Moody and Engineer Stephan Isaacs

Site Visit of John Redmond site

Kansas Area Manager Gene Goff and Engineer Stephan Isaacs

NOTES:

1. General items of discussion during the Conference/Site Visit are non-binding. Questions must be formally submitted in writing via e-mail to Contract Specialist Pamela Moody at pamela.s.moody@usace.army.mil.

2. Written answers to all RFIs submitted prior to the Conference/Site Visit will be issued via Amendment 3.

Amendment 3 will also include (1) the Agenda for this conference/site visit; (2) the Sign-in Sheets for this date and the “unofficial” site visit held on Tuesday, 20 April 2012 and (3) instructions for submitting further RFIs.

Prepared by:

Pamela Moody Contract Specialist 918-669-7457 Pamela.s.moody@usace.army.mil