About this file

This Amendment does the following (1) Revises Section 00 11 00 Proposal Schedule to reflect Gov's requirement for the Base Bid (Council Grove Lake KS ONLY) and make John Redmond Lake KS Option 2 and (2) Incorporate the drawings for the Seed TO into the SOW/Specs.

View the file

Other files

File Type Posted
12-R-0031.Amendment 9.pdf PDF
12-R-0031.Amendment 7.pdf PDF
12-R-0031.RFI 64.pdf PDF
12-R-0031 Amendment 6.pdf PDF
12-R-0031 Amendment 6 Attachment 3.pdf PDF
12-R-0031 Amendment 6 Attachment 4.pdf PDF
12-R-0031 Amendment 6 Attachment 1.pdf PDF
12-R-0031 Amendment 6 Attachment 2.pdf PDF
SDVOSB Energy SATOC.12-R-0031.SPECIAL NOTICE.Site Visit for Canton OK.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 3.pdf PDF
Amendment 5.Extend Proposal Due Date.pdf PDF
A22 12-R-0031.Amend 4.Attach 1.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 2.pdf PDF
A22 12-R-0031 Amend 3.Pre-Proposal Conf Seed TO Site Visit Info.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 7.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 8.pdf PDF
A22 12-R-0031 Amend 3.NEW Attach 6.pdf PDF
A22 12-R-0031 Amend 3.REVISED Attach 4.pdf PDF
SDVOSB Energy SATOC.12-R-0031.Additional Drawings for Seed TO.pdf PDF
SDVOSB Energy SATOC.12-R-0031.Revised Specs for Seed TO.pdf PDF
SDVOSB Energy SATOC.12-R-0031.RFIs Set 1.pdf PDF
A22 12-R-0031 Amend 2.Revised Date for Site Visit.pdf PDF
12-R-0031 Amend 1 Attach 1.pdf PDF
12-R-0031 Amend 1.Site Visit Set Up.pdf PDF
A22 SOL W912BV-12-R-0031.pdf PDF
SOL Attachment 1 - Section 00 22 11 - Attach 1 - Experience Info.pdf PDF
SOL Attachment 3 - SOW - SDVOSB Energy SATOC.pdf PDF
SOL Attachment 4 - SOW - Seed TO - SDVOSB Energy SATOC.pdf PDF
SOL Attachment 5 - Wage Rates - Seed Task Order.pdf PDF
SOL Attachment 2 - Section 00 22 11 - Attach 2 - PP Questionnaire.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

(1) Revise Section 00 11 00, Proposal Schedule, to reflect the Government's revised requirement for the Base Bid and to add Option 2 -- (Base Bid w ill be Turbine Installation at Council Grove Lake, KS only; Option 1 is still Turbine Installation at Canton Lake, OK; Option 2 w ill now be Turbine Installation at John Redmond Lake, KS). -- This change is reflected in Revision 2 of the SOW for the Seed TO (Attachment 4).

(2) Incorporate Attachment 6 (Draw ings for Seed TO) into Attachment 4. Attachments 7 & 8 w ill be come 6 & 7.

Acknow ledgment of this Amendment 4 w ill also be an acknow ledgment of your receipt of the Answ ers to RFI Set 2 previously posted separately on FBO.gov.

No other changes are being made w ith this amendment including the hour and date for receipt of offers.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-12-R-0031

X 9B. DATED (SEE ITEM 11)

13-Mar-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2012

CODE

CONTRACTING DIV

USAED, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV-12-R-0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Section 00 22 11 - Attach

1 - Experience Info

Attachment 2 Section 00 22 11 - Attach 2 - PP Questionnaire

Attachment 3 Statement of Work - SDVOSB Energy SATOC

Attachment 4 Revised Specs/SOW for Seed TO

10 29-MAR-2012

Attachment 5 Wage Rates - Seed Task Order

Attachment 6 Additional Drawings for Seed TO

5 29-MAR-2012

Attachment 7 Agenda for Pre-Proposal Conf/Seed TO Site Visit

1 22-MAR-2012

Attachment 8 Sign-In Sheets for Pre- Proposal Conf/Seed TO Site Visit

3 22-MAR-2012

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Section 00 22 11 - Attach

1 - Experience Info

Attachment 2 Section 00 22 11 - Attach 2 - PP Questionnaire

Attachment 3 Statement of Work - SDVOSB Energy SATOC

Attachment 4 Rev 2, SOW/Specs - Seed

TO

14 04-APR-2012

Attachment 5 Wage Rates - Seed Task Order

Attachment 6 Agenda for Pre-Proposal Conf/Seed TO Site Visit

1 22-MAR-2012

Attachment 7 Sign-In Sheets for Pre- Proposal Conf/Seed TO Site Visit

3 22-MAR-2012

(End of Summary of Changes)