Scenic Byway Creek Fire Road Repair - Phase 2
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 12970223B0001
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- North Fork, California 93611, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This notice seeks a firm-fixed-price contract for the Department of Agriculture Forest Service to repair 42.35 miles of Minarets Road within the Sierra National Forest. Work will include cleaning and repairing culverts and drainage structures, placing base rock and hot mix asphalt, applying a double chip seal, and installing concrete curb stops and permanent pavement markings. Bids are due by November 30th and will be evaluated based on technical acceptability and price. Anticipated contract award is December 1st, with construction to begin on April 1st, 2023 and be completed within 60 days.
This requirement has a total small business set-aside under NAICS code 237310 for highway, street, and bridge construction. The budget range is between $1 million to $5 million. Approximately 15 tons per mile of base rock and 20 tons per mile of hot mix asphalt will be used. Vendors must register in SAM by November 1st to obtain the full IFB released that date. Interested parties may arrange site visits by contacting the specified Forest Service representative.
Notice text
Pre-Solicitation Notice
Scenic Byway Creek Fire Road Repairs – Phase 2, Sierra National Forest
Site Visit
Interested vendors may arrange to view the site by contacting Pablo Gonzalez at (559) 392-0423 or pablo.gonzalez@usda.gov or at the Sierra National Forest Office, 1600 Tollhouse Road, Clovis, CA 93611, between the hours of 8:00 AM and 4:00 PM, Monday through Friday, except Federal holidays.
Some of the road requiring repair is above 8,000 feet and may have snow accumulation starting in October that might affect access to the road. Interested vendors are encouraged to view the site as soon as possible to avoid chances of inclement weather.
Description of Work
Project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to repair 42.35 miles of Minarets Road:
- Clean and recondition the culverts and all other drainage structures along the road.
- Place approximately 15 Tons per mile of base rock to improve the surface and drainage on turn outs along the project area and place approximately 20 Tons per mile of HMA to repair potholes per the specification.
- Prepare the road to crack seal the road surface, place a double chip seal for 42.35 miles, the first pass should only be applied to the travel way and the second pass should be applied to the travel way and shoulder areas. The double chip seal includes Mile High vista point and Arch Rock parking areas, see drawings for details. The area of both parking area has been included on the quantity of crack sealing and double chip seal.
- Install concrete curb stops at Mile High and permanent pavement markings along the road and Arch Rock.
The awarded contractor shall, without additional expense to the government, be responsible for obtaining any necessary licenses, permits, which comply with any federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. Project drawings will be provided as attachments to the Invitation for Bid (IFB).
Project Location
Travel East from North Fork, CA on Country Road 225 for approximately four point four (4.4) miles until Minarets, continue traveling East for five (5) miles until reaching the start of this project.
Contract Time
The anticipated project performance period for this project is 60 days, including delays for weather, locating, transporting supplies and materials, and final project inspection and site cleanup.
Anticipated Schedule for solicitation, award, and completion of project is as follows:
IFB Posted: November 1, 2022
IFB Close: November 30, 2022
Bid Opening: December 1, 2022
Construction Start: April 1, 2023 (depending on road conditions)
Magnitude
Per FAR 36.204, the magnitude of the project is between $1,000,000 and $5,000,000.
This requirement is being solicited as a Total Small Business set-aside, under North American Industry Classification System (NAICS) code 237310 – Highway, Street, and Bridge Construction, with a Small Business Size Standard of $39.5M. The Forest Service intends to award one (1) Firm-Fixed-Price (FFP) contract resulting from this solicitation.
All interested vendors must be registered in the System for Award Management (SAM) database at SAM.gov | Entity Registrations before award of contract; failure to register in the SAM database may cause your firm to be ineligible for award and removed from consideration.
Interested vendors must obtain complete solicitation package on SAM.gov, copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov and vendors will be solely responsible for viewing the solicitation posting in SAM.gov for amendments to the IFB.
This notice does not obligate the government to award a contract, nor does it obligate the government to pay for any proposal preparation costs.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Scenic Byway Creek Fire Road Repair - Phase 2 | Award Notice | |
| Scenic Byway Creek Fire Road Repair- Phase 1 | Solicitation | |
| Scenic Byway Creek Fire Road Repair - Phase 2 | Solicitation | |
| Scenic Byway Creek Fire Road Repair | Pre-Solicitation | |
| This notice | Pre-Solicitation | |
| Scenic Byway Creek Fire Road Repair | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| ND OMAD 2025(1) Minuteman Missile Access Road | Federal Highway Administration | Total Small Business | |
| GAOA Mesa Falls VC Roof Repairs in Caribou-Targhee National Forest, Idaho | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity