This document is a federal contract solicitation amendment (SF 30) for the San Joaquin/Port of Stockton Deep Water Ship Channel (DWSC) FY25 Maintenance Dredging Project. The amendment addresses several key modifications, including incorporating the government's responses to two Request for Information (RFI) sets, correcting the title of the dredging plan and equipment schedule, and deleting the FAR 52.246-21 Warranty of Construction clause.
The amendment includes responses to contractor questions covering topics such as dredging reaches, fish monitoring requirements, sediment trap overdepth specifications, and disposal suitability. Notably, the government clarified that contractors must use a methodology to monitor for entrained fish with a goal of monitoring at least 30 percent of dredged material. The project involves annual maintenance dredging of the San Joaquin River/Stockton DWSC to -35-ft MLLW with 1-ft paid overdepth, with the sediment trap to be dredged to -38.5-ft MLLW plus 1-ft paid overdepth. The effective date of the amendment is 05 MAY 2025.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 70 00 - Conditions of the Contract
Additional Information/Notes
The following clauses were deleted:
FAR Clauses Incorporated by Full Text 52.246-21 Warranty of Construction. (Mar 1994)
As prescribed in , the contracting officer may insert a clause substantially as follows in 46.710(e)(1) solicitations and contracts when a fixed-price construction contract (see (c)) is contemplated, and 46.705 the use of a warranty clause has been approved under agency procedures:
Warranty of Construction (Mar 1994)
In addition to any other warranties in this contract, the Contractor warrants, except as provided in (a) paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If (b) the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In (c) addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-
The Contractor's failure to conform to contract requirements; or(1)
Any defect of equipment, material, workmanship, or design furnished.(2)
The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. (d) The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the (e) discovery of any failure, defect, or damage.
If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt (f) of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.
W912P725BA0030002
With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers (g) for work performed and materials furnished under this contract, the Contractor shall-
Obtain all warranties that would be given in normal commercial practice;(1)
Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the (2) Contracting Officer; and
Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.(3)
In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government (h) may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.
Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, (i) the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of (j) this contract with respect to latent defects, gross mistakes, or fraud.
(End of clause)
W912P725BA0030002
SAN JOQUIN-PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT
AS OF: 25APR 2025
QUESTIONS & RESPONSES
SOLICITATION NUMBER W912P725BA003
2462143
The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.
Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.
Changes to any previous responses in this document will be struck-through and new, updated responses will be provided.
RFI # 1
SPEC SECTION/DRAWING RFI QUESTION RESPONSES
1 Topic: Dredging Reaches
Drawing: G-002
Section: Bid Schedule
Subpart: N/A
Specification Language:
1.1 Question: The Bid Schedule lists 23 reaches to be dredged and based on the depths shown, Reach 22 corresponds to the Sediment
Trap. However, the Plans and language in the specifications reference 15 dredging reaches with Reach 15 corresponding to the
Sediment Trap. Please clarify which is correct and update the documents for consistency between the Bid Schedule and the
Specifications and Drawings
The Bid Schedule is incorrect. For the 15 correct reaches please refer to the plans. The Amendment 0001 Schedule has been issued in SAM.gov.
2 Topic: Reporting of Biobased Products
Drawing: N/A
Section: 00 70 00
Subpart: FAR 52.223-2 Reporting of Biobased
Products Under Service and Construction
Contracts. May 2024
Specification Language:
2.1 Question: Upon careful review, the Contract does not set forth any minimum biobased content percentage for any product within any Biobased Product Category. Because the contract will not involve the use of biobased products in USDA-designated product categories at https://www.biopreferred.gov or 7 CFR part 3201, we respectfully request that you remove FAR 52.223-2 from this
Contract.
Due to the uncertainty of whether the prospective awardee will utilize any biobased products in the USDA-designated product categories, the clause is required at this time.
3 Topic: Warranty of Construction
Drawing: N/A
Section: 00 70 00
Subpart: 52.246-21 Warranty of Construction.
(Mar 1994)
Specification Language:
3.1 Question: Unlike land-based construction, completed dredging activities are subject to natural forces that are entirely outside the control of the Contractor. To clarify the intent of the warranty, please confirm that the warranty provisions do not apply to the dredging portion(s) of the work. With respect to dredging, upon
Contractor’s advising Owner that the dredging has been completed, Owner shall inspect the Work and, if acceptable, shall advise Contractor of Owner’s acceptance thereof. Contractor in no way represents, guarantees or warrants that any dredging or excavation will stay open, dredged or excavated for any period of time whatsoever.
FAR 52.246-21 Warranty of
Construction is deleted from the solicitation via Amendment 0002.
QUESTIONS & RESPONSES
4 Drawing: N/A
Section: 01 57 19
Subpart: 3.1.4 and 3.1.4.1
Specification Language: 3.1.4: The Contractor will either utilize a fish entrainment device at the point of discharge of the dredged material, sample scows (if dredging is conducted using a clamshell), utilize a fish entrainment device fashioned to work with a clamshell, or other similar methods.
3.1.41: The Contractor shall furnish a fish monitoring apparatus and transport the apparatus to the various dredged material placement sites as well as within each placement sites.
4.1 Question: If 30% of dredged material is
sampled at the dredged site (scow or bucket), is the fish monitoring apparatus still required at the point of discharge?
No, a fish monitoring apparatus is not required at the point of discharge, per the United States Fish and Wildlife Service (USFWS) Stockton Deep Water Ship Channel Biological Opinion (2023-2028) attached to the specifications. The Contractor can propose any methodology so long as the goal of at least 30 percent of dredged material monitored can be met. The Government will review and approve of the methodology via the Submittal: Fish Entrainment and Biological Resources Monitoring Work Plan.
5 Topic: Sediment Trap Overdepth
Drawing: N/A
Section: 35 20 23 and 01 11 00
Subpart: 1.5.1.5 and 1.1.1.
Specification Language 1.5.1.5: Dredging in this 2' Prism is authorized but not required except Reach 15 (the sediment trap). Dredging within the Allowable (Unpaid)2' Overdepth
Prism is NOT permitted for the sediment trap.
Specification Language 1.1.1: Dredge the specified dredge reaches to -35-ft MLLW plus
1-ft of allowable paid overdepth in San
Joaquin River / Stockton DWSC in all
Reaches, except for the Sediment Trap, which shall be dredged to -38.5-ft MLLW with 1-ft of allowable paid overdepth.
5.1 Question: The above referenced specification
language is unlcear. Please clarify what, if any, overdepth dredging is allowed for the Sediment
Trap. Does the Sediment Trap include 1’ of paid overdepth to -39.5’ MLLW? If so, is any additional dredging/disturbance allowed beyond this?
The sediment trap includes 1’ of paid overdepth to 39.5’. No dredging below 39.5’ is allowed in the sediment trap per environmental restrictions.
6 Topic: Environmental
Drawing: N/A
Section: Sacramento DWSC BO 2023-2028 (1)
Subpart:
Specification Language: Engineering Research and Design Center Fish Screen:
The Corps Engineering Research and Design
Center is currently in the process of designing a fish monitoring screen for use with mechanical dredgers which would function similarly to the
6.1 Question: Is the Government requiring the
Contractor, if utilizing a mechanical dredge, to use an
“experimental device” for the San Joaquin/Port of
Stockton DWSC FY25 Maintenance Dredging
Project?
6.2 Question: If yes, what is the device, how will it
be implemented, and what is required of the
Contractor regarding the use of the device?
6.1 - Yes, the Contractor must use a methodology to monitor for entrained fish, with goal of at least 30 percent of dredged material monitored.
6.2 - The Contractor can propose any device so long as the goal of at least 30 percent of dredged material monitored can be met. The Government will review and approve of the device and how it will be
QUESTIONS & RESPONSES
fish entrainment monitoring device in use for hydraulic dredgers. To further this effort to quantify take of listed species in real time, maintenance dredging completed under this project would utilize the experimental device and provide reports to determine the feasibility of permanently including this monitoring measure.
6.3 Question: Can the Owner please provide
information on how the fish monitoring requirement has been fulfilled with clamshell dredges in the past?
implemented via the Submittal: Fish Entrainment and
Biological Resources Monitoring Work Plan.
6.3 - Offloading upland, where a screening device was furnished that was able to sift out water and sediment away that made it able to monitor for entrained fish.
AS OF: 28 APR 2025
QUESTIONS & RESPONSES
The intent of this section is to provide questions & comments received from interested parties on the above solicitation, and our responses to those questions and comments. It is possible that the information below does not reflect 100% of the questions and responses. The questions and comments do not necessarily represent questions received from any particular contractor.
Questions and responses are provided for information only and are not made part of the solicitation. Only a formal amendment (SF30) to the solicitation changes the solicitation.
Changes to any previous responses in this document will be struck-through and new, updated responses will be provided.
RFI # 2 SPEC SECTION/DRAWING RFI QUESTION RESPONSES
1 1. Topic: Disposal Suitability Determination Drawing: N/A Section: N/A Subpart: N/A Specification Language:
N/A
1.1 Question: If the Contractor elects to utilize Montezuma for the disposal of dredge material, can the Government indicate whether the material will be classified as “cover” or “foundation” material?
The most recent pre-dredge sediment sampling report was included in the specifications. Please contact Montezuma directly for material classification based on the results described in the report.
SO
LI
C
IT
AT
IO
N
W912P725BA003
San Joaquin/Port of Stockton DWSC FY25 Maintenance Dredging Project
DREDGING PLANT AND EQUIPMENT SCHEDULE
Available Plant to be Used
Age and Overall No. Type Capacity Manufacturer Condition Location Dimensions
Dredges:
Scows:
Tugboats:
Quantity Measurement Equipment:
Quality Control:
DDLS:
1. In preparing the above tabulation the bidder shall insert the following information under the appropriate heading, using a separate line for each major item and an additional page if necessary.
Section 00 10 00 Dredging Plant & Equipment Schedule
a. Number. For dredges give identifying number or name.
b. Type. Under this heading give description as follows: For clamshell dredge show bucket capacity in in-situ cubic yards, for clamshell and/or pipe-line dredges show inside diameter of intake and discharge pipe, horsepower of pump engine, and type of power; for hopper dredges show capacity at overflow, number of dredge pumps, suction pipe size, propulsion type and horsepower, dredge length O/A and beam O/A.
c. Capacity. Under this heading, state the estimated capacity of the plant in cubic yards per month when working materials similar to those which it is anticipated will be encountered in the performance of the work for clamshell, hopper, pipeline, and scow.
d. Overall Dimensions. State overall length and beam.
e. DDLS. List the DDLS equipment and number of each that will be used in accordance with Appendix 5 of the specifications.
2. List two dredging projects with location, dates of completion, and name of project owner:
(a)
(b)
Section 00 10 00
SO
LI
C
IT
AT
IO
N
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 05 MAY 2025 |
| ReqNo: |
| ProjNo: 0000 |
| IssCode: W912P7 |
| AdmCode: |
| IssuedBy: W075 ENDIST SAN FRAN |
KO CONTRACTING DIVISION, 450 GOLDEN GATE AVENUE
SAN FRANCISCO, CA 94102-3406
UNITED STATES
SUNTOK MCGUINNESS, EMAIL: SUNTOK.MCGUINNESS@USACE.ARMY.MIL TELEPHONE: (415) 503-2953 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912P725BA003 |
| SolDate: 29 APR 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE OF THIS AMENDMENT IS TO: A) INCORPORATE THE GOVERNMENT'S RESPONSE TO TWO SETS OF RFIS (REQUEST FOR INFORMATION) THAT WERE RECEIVED, B) CORRECT THE TITLE OF THE DREDGING PLAN AND EQUIPMENT SCHEDULE FROM "RICHMOND INNER HARBOR DREDGING PROJECT" TO READ "SAN JOAQUIN/PORT OF STOCKTON DWSC FY 25 MAINTENANCE DREDGING PROJECT" AND DELETE FAR 52.246-21 WARRANTY OF CONSTRUCTION. BID DUE DATE REMAIN UNCHANGED (19 MAY 2025). |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |