This document is a Solicitation Amendment (SF 30) for the San Joaquin/Port of Stockton Deep Water Ship Channel (DWSC) FY25 Maintenance Dredging Project. The amendment updates the pricing schedule for a maintenance dredging contract with the U.S. Army Corps of Engineers Engineering District San Francisco. The project involves dredging multiple reaches of the ship channel to a depth of -35 feet Mean Lower Low Water (MLLW) plus 1 foot of over-depth, with one sediment trap reach to be dredged to -38.5 feet MLLW. The total estimated dredging volume is 147,043 cubic yards across 15 different reaches, with disposal to occur at either government-furnished or contractor-furnished upland sites.
The solicitation requires bidders to submit complete pricing for all line items, provide a dredging plant and equipment schedule, and comply with specified work requirements. The contract will be awarded using sealed bidding procedures, with the government reserving the right to direct dredged material placement to alternate disposal sites. Bidders must demonstrate equipment availability and commitment, and all dredged material is considered suitable for upland disposal or potential beneficial reuse in accordance with permit requirements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Contract Line Item No.(CLIN)
Description of Supplies and Services *Quantity Unit Unit
Price($) Amount($)
Mobilization, Demobilization and Disposal Site Prep 1 Job
0002 Dredge Reach 1 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
8,357 CY
0003 Dredge Reach 2 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
2,652 CY
0004 Dredge Reach 3 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
2,102 CY
0005 Dredge Reach 4 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
8,052 CY
0006 Dredge Reach 5 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
52,506 CY
0007 Dredge Reach 6 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
3,587 CY
SECTION 00 10 00
PRICING SCHEDULE
SAN JOAQUIN/STOCKTON DWSC FY25 MAINTENANCE DREDGING
SO
LIC
ITATIO
N
0008 Dredge Reach 7 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
3,851 CY
0009 Dredge Reach 8 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
1,013 CY
0010 Dredge Reach 9 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
2,280 CY
0011 Dredge Reach 10 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
1,110 CY
0012 Dredge Reach 11 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
5,095 CY
0013 Dredge Reach 12 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
3,340 CY
0014 Dredge Reach 13 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
7,691 CY
0015 Dredge Reach 14 to -35-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
23,814 CY
SO
LIC
ITATIO
0016 Dredge Reach 15 to -38.5-ft MLLW plus 1 foot of paid Over-depth with disposal at Government-furnished upland site or Contractor-furnished upland beneficial reuse site
21,593 CY
Total (Item 0001 and 0016)
Notes:
1 .
2 .
3 .
4 .
5 .
6 .
7 .
8 .
End of Document
The Government reserves the right to direct the Contractor to place dredged material at an environmentally acceptable alternate disposal site in accordance with the Change Clause FAR 52.243-4.
The Contractor shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.
Dredged material placement shall meet the requirements in Specification Section
01 11 00 SUMMARY OF WORK.
CLIN 001's reference to site prep refers only to sites the bidder anticipates using for disposal.
147,043 CY + 1 Job
* - ALL QUANTITIES ARE ESTIMATES. SEE FAR 52.211-18, SECTION 00 72 00 (GENERAL CONDITION)
OF THE CONTRACT.
To be considered responsive, prices must be submitted on all individual items within Pricing Schedule. Failure to do so may be cause for rejection of bids.
Bidders must complete and submit attached “Dredging Plant and Equipment Schedule”, forms Page 1 and Page 2 as part of their solicitation package for bid evaluation. Failure to do so may cause the bid to be considered nonresponsive. The Contractor shall demonstrate that all necessary equipment will be available and committed to this contract.
The term "Job", which appears on the Pricing Schedule (Section 00 01 00) under “Unit” for Bid Item No. 0001 shall be considered as a Lump Sum. The Variation in Estimated Quantities contract clause, FAR 52.211-18, shall not apply to Bid Item No. 0001.
BASIS of AWARD: The contract will be awarded in accordance with FAR 52.214-19 Contract Award – Sealed Bidding – Construction.
SO
LIC
ITATIO
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 29 APR 2025 |
| ReqNo: |
| ProjNo: 0000 |
| IssCode: W912P7 |
| AdmCode: |
| IssuedBy: W075 ENDIST SAN FRAN |
KO CONTRACTING DIVISION, 450 GOLDEN GATE AVENUE
SAN FRANCISCO, CA 94102-3406
UNITED STATES
SUNTOK MCGUINNESS, EMAIL: SUNTOK.MCGUINNESS@USACE.ARMY.MIL TELEPHONE: (415) 503-2953 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912P725BA003 |
| SolDate: 29 APR 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: THE PURPOSE OF THIS AMENDMENT IS TO UPDATE THE PRICING (BID) SCHEDULE. |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .