Road reconstruction and culvert replacement on Antelope Lake Road. 2 miles 0. 0 to 2. 0. Plumas National Forest. USDA Forest Service.

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
127EAW23R0005
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
California 95983, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for road reconstruction and culvert replacement services along two miles of Antelope Lake Road within the Plumas National Forest. The USDA Forest Service is soliciting these services under request for proposal number 127EAW23R0005. Offerors must submit pricing and technical proposals by March 24, 2023 at 12:00 PM Pacific Standard Time outlining their qualifications and approach to reconstructing the road and replacing culverts per the drawings, specifications, and supplemental documents provided. Proposals will be evaluated based on technical qualifications, past performance, and price.

This is a 100% total small business set-aside. The project's NAICS code is 237110, with an estimated value between $1-5 million to be performed in Taylorsville, California. The work includes reconstructing approximately two miles of road and replacing culverts from milepost 0.0 to 2.0. The firm fixed price contract is to be awarded by May 2023, with all work to be completed by September 2024.

Notice text

3 versions

Update #3 · Latest ·

03/01/2023. Amendment 1 is published. Extends the proposal due date to NLT March 24, 2023, by 12pm (1200) PST.

Current weather conditions at the project site may limit or prevent prospective bidders from visiting the site. The due date extension is intended to allow time for weather conditions to improve to the extent that bidders may access the site for self-guided visits.

Prospective bidders must ensure this amendment is acknowledged as part of the proposal submission per the instructions in Block 11.

--------------------------------------------------------------------------------------------

02/01/2023. Request for Proposal and RFP attachments 1-5 published.

Proposal due date is NLT March 3, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: Road reconstruction and culvert replacement on Antelope Lake Road. Miles 0.0 to 2.0. Plumas National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $1M and $5M.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Update #2 ·

03/01/2023. Amendment 1 is published. Extends the proposal due date to NLT March 27, 2023, by 12pm (1200) PST.

Current weather conditions at the project site may limit or prevent prospective bidders from visiting the site. The due date extension is intended to allow time for weather conditions to improve to the extent that bidders may access the site for self-guided visits.

Prospective bidders must ensure this amendment is acknowledged as part of the proposal submission per the instructions in Block 11.

--------------------------------------------------------------------------------------------

02/01/2023. Request for Proposal and RFP attachments 1-5 published.

Proposal due date is NLT March 3, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: Road reconstruction and culvert replacement on Antelope Lake Road. Miles 0.0 to 2.0. Plumas National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $1M and $5M.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Update #1 ·

02/01/2023. Request for Proposal and RFP attachments 1-5 published.

Proposal due date is NLT March 3, 2023, by 3pm PST.

USDA Forest Service Request for Proposal.

PROJECT: Road reconstruction and culvert replacement on Antelope Lake Road. Miles 0.0 to 2.0. Plumas National Forest.

IAW FAR 32.204 Disclosure of Magnitude of the Construction Projects: between $1M and $5M.

Total Small Business Set Aside

Section L.1-3 provides the complete proposal (price and technical) submission instructions and requirements.

Section L.5 includes Site Visit information.

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
Camptonville Housing Decommissioning Nevada City, California 95959, United States · NAICS 238910 Forest Service Total Small Business
Jake Rocks Road Reconstruction Warren, Pennsylvania 16365, United States · NAICS 237310 Forest Service Total Small Business
GAOA Brainard Lake Recreation Area Deferred Maintenance Ward, Colorado 80481, United States · NAICS 237310 Forest Service Total Small Business
GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest Garden City, Utah, United States · NAICS 237990 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors