Replace Building 200 HVAC Control System - Bayview, ID

Closed Solicitation Posted

Solicitation number
N0016724Q0233
Agency
Naval Sea Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2HB Repair Or Alteration Of Government-Owned Government-Operated (Gogo) R&D Facilities
Place of performance
Bayview, Idaho 83803, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Naval Surface Warfare Center, Carderock Division (NSWCCD) Acoustic Research Detachment (ARD) in Bayview, Idaho has a requirement to replace the HVAC control system in Building 200. The contract will involve furnishing all necessary supervision, transportation, labor, tools, supplies, and equipment to remove the existing Carrier Comfort Network Controller and install a new commercial off-the-shelf HVAC control system. Key tasks include installing a new on-site PC workstation with a graphical software package, alarm notification system, replacing zone thermostats, providing air balancing, and integrating control of the chillers and heating/cooling pumps. The contractor must also provide training to ARD personnel and a one-year warranty on parts and labor. Proposals are due by July 31, 2024, and the government will award a Firm-Fixed Price contract to the Lowest Price Technically Acceptable offeror.

This opportunity is set aside for small businesses. The estimated value of the contract is between $100,000 and $250,000, and the work must be completed within 60 days of contract award. The place of performance is Bayview, Idaho 83803.

Notice text

2 versions

Update #2 · Latest ·

The Naval Surface Warfare Center, Carderock Division (NSWCCD) Acoustic Research Detachment (ARD) at Bayview, Idaho has a requirement to replace the control system on the Building 200 HVAC system. The work to be completed consists of furnishing all necessary supervision, transportation, labor, tools, supplies, equipment required to remove and replace the existing Carrier Comfort Network Controller in Building 200 with a like in kind replacement system.

General Description:

  • Propose to install new commercial off the shelf HVAC Control system
  • Shall provide a new on-site PC workstation with full system control
  • Design and install a software graphical package with a floorplan for zone identification.
  • Design and provide an alarm notification system.
  • Replace zone thermostats with compatible COTS units.
  • Provide air balancing to all VAV zones.
  • Provide linkage to chillers for full control
  • Provide start and stop control to heating and cooling pumps
  • Incorporate control of snow melt system
  • Start-up of control system with air balancing per original drawing specifications
  • Provide training to ARD personnel in the maintenance, troubleshooting, and operation of the new control system.
  • Manufactures standard warranty and one-year parts and labor warranty.

3.0 Applicable Documents

Standard Original Equipment Manufacturer warranty, maintenance and operation documentation.

4.0 Place of Performance

The contractor shall perform the work at the following location:

NSWCD ARD Bayview

33964 N Main Avenue

Building 200

Bayview, ID 83803

5.0 Tasks

The contractor shall provide all transportation, labor, materials and supervision to perform the following tasks:

5.1 Contractor shall install new control work station and controllers in a manner that does not impede on base operations by ensuring cooling in server rooms is maintained thought all phases of work.

5.2 Contractors shall provide a “nonproprietary” control system that can be serviced by non-affiliated service technicians.

5.3 Contractors shall install new control cabinets and install conduit for all control wires and power supply cables that are ran in the mechanical room.

5.4 Contractors shall install control and status sensors to hot water pumps and motors, chill water pumps and motors, snow melt pump and motor, chillers, boilers, and air handler units.

5.5 Contractor shall replace/install outdoor air temperature sensors, freeze protection sensors, air filter differential pressure transducers.

5.6 Contractor shall replace/install intake and exhaust louver controller as well as status.

5.7 Contractors shall replace a total of thirty nine VAV controllers with new universal COTS controllers, room sensor, temperature probes, flow sensors, and damper control.

5.8 Contractors shall replace the hot water strainers and shut off valves and update with COTS hose and valve kits.

5.9 Contractors shall test the glycol cooling loop for leaks and recycle the glycol system to 40% concentration using the government furnished glycol supply.

5.10 Contractors shall test the heating loop for leaks and recycle the corrosion inhibitor the appropriate PH levels using the government furnished corrosion inhibitor supply.

5.11 Contractors shall test the snow melt loop for leaks and recycle the glycol levels to 30% using the government furnished glycol supply.

5.12 Contractors shall provide a 1-year warranty on all parts and components installed.

5.13 Contractors shall provide a 1-year warranty on all craftsmanship work including, but not limited to, plumping, electrical, programming, and system balancing.

  1.   Government owned Property:
    1. The current network control computer located inside the mechanical room shall remain in control by NSWCCD ARD Bayview and shall not be removed or disposed of by outside contractors.
    2. All extra controllers, glycol, corrosion inhibitor, valves, and replacement parts will remain with NSWCCD ARD Bayview.

7.0 Other Requirements

N/A

8.0     Period of Performance:

The contractor shall perform the above tasks no later than September 30, 2024.

Update #1 ·

The Naval Surface Warfare Center, Carderock Division (NSWCCD) Acoustic Research Detachment (ARD) at Bayview, Idaho has a requirement to replace the control system on the Building 200 HVAC system. The work to be completed consists of furnishing all necessary supervision, transportation, labor, tools, supplies, equipment required to remove and replace the existing Carrier Comfort Network Controller in Building 200 with a like in kind replacement system.

General Description:

  • Propose to install new commercial off the shelf HVAC Control system
  • Shall provide a new on-site PC workstation with full system control
  • Design and install a software graphical package with a floorplan for zone identification.
  • Design and provide an alarm notification system.
  • Replace zone thermostats with compatible COTS units.
  • Provide air balancing to all VAV zones.
  • Provide linkage to chillers for full control
  • Provide start and stop control to heating and cooling pumps
  • Incorporate control of snow melt system
  • Start-up of control system with air balancing per original drawing specifications
  • Provide training to ARD personnel in the maintenance, troubleshooting, and operation of the new control system.
  • Manufactures standard warranty and one-year parts and labor warranty.

Attachments

Files attached to this notice, newest first
File Type Posted
N0016724Q02330001 ARD B200 Bayview.pdf PDF
N0016724Q0233 B200 HVAC.pdf PDF
02. Statement of Work B200 HVAC Controls.docx DOCX document
Wage Determination.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity