About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to replace the HVAC control system in Building 200 at the Naval Surface Warfare Center, Carderock Division (NSWCCD) Acoustic Research Detachment (ARD) in Bayview, Idaho.

The SOW requires the contractor to furnish all necessary supervision, transportation, labor, tools, supplies, and equipment to remove and replace the existing Carrier Comfort Network Controller with a new commercial off-the-shelf HVAC control system. Key tasks include installing a new PC workstation with control software and a graphical interface, replacing zone thermostats, providing air balancing, integrating with chillers and heating/cooling pumps, and incorporating control of the snow melt system. The contractor must also provide training to ARD personnel and a one-year warranty on parts, labor, and craftsmanship. The work must be completed by September 30, 2024. The related federal contract opportunity, Solicitation Number N0016724Q0233, is being issued by the Department of the Navy, Naval Sea Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Building 200 HVAC Control System - Bayview, ID, newest first.
File Type Posted
N0016724Q02330001 ARD B200 Bayview.pdf PDF
Wage Determination.pdf PDF
N0016724Q0233 B200 HVAC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Replace Building 200 HVAC Control System

1. Background The Naval Surface Warfare Center, Carderock Division (NSWCCD) Acoustic Research Detachment (ARD) at Bayview, Idaho has a requirement to replace the 25 year old control system on the building 200 HVAC system. The system being upgraded has direct control over the mission critical ATACS server room, ARD LAN room, as well as 37 other control zones which provide conditioned air to personnel work spaces and conference rooms. The system to be replaced is a single point of failure with repair components that are no longer commercially available. Neglecting the system upgrade will have a direct impact on Virginia, Columbia, SSN(X), BUTEC, AMFIB, and all subsequent data produced by the Acoustic Research Detachment Bayview.

1. Scope of Work The work to be completed under this contract consist of furnishing all necessary supervision, transportation, labor, tools, supplies, equipment required to remove and replace the existing Carrier Comfort Network Controller in Building 200 with a like in kind replacement system.

General Description:

· Propose to install new commercial off the shelf HVAC Control system

· Shall provide a new on-site PC workstation with full system control

· Design and install a software graphical package with a floorplan for zone identification.

· Design and provide an alarm notification system.

· Replace zone thermostats with compatible COTS units.

· Provide air balancing to all VAV zones.

· Provide linkage to chillers for full control

· Provide start and stop control to heating and cooling pumps

· Incorporate control of snow melt system

1. Start-up of control system with air balancing per original drawing specifications

1. Provide training to ARD personnel in the maintenance, troubleshooting, and operation of the new control system.

1. Manufactures standard warranty and one-year parts and labor warranty.

NOTE: If required for unloading, forklift and cranes will be provided by the ARD.

3.0 Applicable Documents

Standard Original Equipment Manufacturer warranty, maintenance and operation documentation.

4.0 Place of Performance

The contractor shall perform the work at the following location:

NSWCD ARD Bayview 33964 N Main Avenue Building 200 Bayview, ID 83803

5.0 Tasks

The contractor shall provide all transportation, labor, materials and supervision to perform the following tasks:

5.1 Contractor shall install new control work station and controllers in a manner that does not impede on base operations by ensuring cooling in server rooms is maintained thought all phases of work.

5.2 Contractors shall provide a “nonproprietary” control system that can be serviced by non-affiliated service technicians.

5.3 Contractors shall install new control cabinets and install conduit for all control wires and power supply cables that are ran in the mechanical room.

5.4 Contractors shall install control and status sensors to hot water pumps and motors, chill water pumps and motors, snow melt pump and motor, chillers, boilers, and air handler units.

5.5 Contractor shall replace/install outdoor air temperature sensors, freeze protection sensors, air filter differential pressure transducers.

5.6 Contractor shall replace/install intake and exhaust louver controller as well as status.

5.7 Contractors shall replace a total of thirty nine VAV controllers with new universal COTS controllers, room sensor, temperature probes, flow sensors, and damper control.

5.8 Contractors shall replace the hot water strainers and shut off valves and update with COTS hose and valve kits.

5.9 Contractors shall test the glycol cooling loop for leaks and recycle the glycol system to 40% concentration using the government furnished glycol supply.

5.10 Contractors shall test the heating loop for leaks and recycle the corrosion inhibitor the appropriate PH levels using the government furnished corrosion inhibitor supply.

5.11 Contractors shall test the snow melt loop for leaks and recycle the glycol levels to 30% using the government furnished glycol supply.

5.12 Contractors shall provide a 1-year warranty on all parts and components installed.

5.13 Contractors shall provide a 1-year warranty on all craftsmanship work including, but not limited to, plumping, electrical, programming, and system balancing.

1. Government owned Property:

0. The current network control computer located inside the mechanical room shall remain in control by NSWCCD ARD Bayview and shall not be removed or disposed of by outside contractors.

0. All extra controllers, glycol, corrosion inhibitor, valves, and replacement parts will remain with NSWCCD ARD Bayview.

7.0 Other Requirements

N/A

8.0 Period of Performance:

The contractor shall perform the above tasks no later than September 30, 2024.