Repairs to Bldg. 168 Wellness Center at Selfridge ANGB
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S8520B0007
- Agency
-
Michigan National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Selfridge Angb Mi 48045 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to perform repairs to Building 168 Wellness Center at Selfridge Air National Guard Base in Michigan. Work includes converting an existing bell tower to a clock tower, replacing the tower's lower roof, repairing masonry including concrete units, and demolishing and replacing windows. The Department of the Army Michigan Army National Guard is the issuing agency seeking performance in accordance with the statement of work and specifications. A mandatory pre-bid site visit was held on August 13, 2020. Sealed bids were due by August 28, 2020 and will be evaluated based on price.
The opportunity is set aside as a total small business contract under NAICS 236220 with an estimated value between $500,000 to $1,000,000. The single award firm-fixed price contract has a period of performance of 180 days for work to be completed at Selfridge Air National Guard Base in Harrison Charter Township, Michigan. Sixteen contractors submitted bids ranging from $345,000 to $601,821.34. The pre-solicitation site visit and bid opening were well attended.
Notice text
4 versions
Update #4 · Latest ·
****NOTICE****
Bid Opening Abstract with results and Bid Opening Attendance Sheet uploaded.
****29 August update:
Added Pre-Proposal Conference Minutes, Site Visit Attendance Sheet and submitted RFI Questions & Answers for this solicitation.
****28 August update:
The purpose of this amendment is to make the following changes IAW with the enclosed: Summary of Changes:
1. Extend the Bid Due date to 2 September at 10:00 AM local time.
2. Updated and add various clauses and provisions.
3. There are no other changes and all other terms and conditions shall remain the same.***********
Contractor shall perform all work in accordance with the statement of work (SOW) and all attached specs/drawings. VGLZ 182033 Repair Building 168 Wellness Center consists of the conversion of the existing bell tower to a clock tower, replacement of the tower’s lower roof, repair of the towers masonry to include concrete units, and window demolition /replacement. The conversion of the clock tower includes the installation of clock faces along with electrical work and materials to provide necessary power to accommodate new exterior clock installation as noted in the drawings and specifications. The window replacement consists of the demolition of existing window systems. The historic sizing of window openings is to remain as is and new windows are to mimic the originals as closely as possible. Please also note the SOW Addendum 001 deleting the requirement of exterior clocks. Pre-Solicitation site visit for this project will be conducted on Thursday, 13 August at 11:30 am EST. All interested contractors are HIGHLY encouraged to attend. Please see solicitation attachment for further details.
Update #3 ·
****29 August update:
Added Pre-Proposal Conference Minutes, Site Visit Attendance Sheet and submitted RFI Questions & Answers for this solicitation.
****28 August update:
The purpose of this amendment is to make the following changes IAW with the enclosed: Summary of Changes:
1. Extend the Bid Due date to 2 September at 10:00 AM local time.
2. Updated and add various clauses and provisions.
3. There are no other changes and all other terms and conditions shall remain the same.***********
Contractor shall perform all work in accordance with the statement of work (SOW) and all attached specs/drawings. VGLZ 182033 Repair Building 168 Wellness Center consists of the conversion of the existing bell tower to a clock tower, replacement of the tower’s lower roof, repair of the towers masonry to include concrete units, and window demolition /replacement. The conversion of the clock tower includes the installation of clock faces along with electrical work and materials to provide necessary power to accommodate new exterior clock installation as noted in the drawings and specifications. The window replacement consists of the demolition of existing window systems. The historic sizing of window openings is to remain as is and new windows are to mimic the originals as closely as possible. Please also note the SOW Addendum 001 deleting the requirement of exterior clocks. Pre-Solicitation site visit for this project will be conducted on Thursday, 13 August at 11:30 am EST. All interested contractors are HIGHLY encouraged to attend. Please see solicitation attachment for further details.
Update #2 ·
****28 August update:
The purpose of this amendment is to make the follow ing changes IAW with the enclosed: Summary of Changes:
1. Extend the Bid Due date to 2 September at 10:00 AM local time.
2. Updated and add various clauses and provisions.
3. There are no other changes and all other terms and conditions shall remain the same.***********
Contractor shall perform all work in accordance with the statement of work (SOW) and all attached specs/drawings. VGLZ 182033 Repair Building 168 Wellness Center consists of the conversion of the existing bell tower to a clock tower, replacement of the tower’s lower roof, repair of the towers masonry to include concrete units, and window demolition /replacement. The conversion of the clock tower includes the installation of clock faces along with electrical work and materials to provide necessary power to accommodate new exterior clock installation as noted in the drawings and specifications. The window replacement consists of the demolition of existing window systems. The historic sizing of window openings is to remain as is and new windows are to mimic the originals as closely as possible. Please also note the SOW Addendum 001 deleting the requirement of exterior clocks. Pre-Solicitation site visit for this project will be conducted on Thursday, 13 August at 11:30 am EST. All interested contractors are HIGHLY encouraged to attend. Please see solicitation attachment for further details.
Update #1 ·
Contractor shall perform all work in accordance with the statement of work (SOW) and all attached specs/drawings. VGLZ 182033 Repair Building 168 Wellness Center consists of the conversion of the existing bell tower to a clock tower, replacement of the tower’s lower roof, repair of the towers masonry to include concrete units, and window demolition /replacement. The conversion of the clock tower includes the installation of clock faces along with electrical work and materials to provide necessary power to accommodate new exterior clock installation as noted in the drawings and specifications. The window replacement consists of the demolition of existing window systems. The historic sizing of window openings is to remain as is and new windows are to mimic the originals as closely as possible. Please also note the SOW Addendum 001 deleting the requirement of exterior clocks. Pre-Solicitation site visit for this project will be conducted on Thursday, 13 August at 11:30 am EST. All interested contractors are HIGHLY encouraged to attend. Please see solicitation attachment for further details.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repairs to Bldg. 168 Wellness Center at Selfridge ANGB | Award Notice | |
| This notice | Solicitation | |
| Repairs to Bldg. 168 Wellness Center at Selfridge ANGB | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F-15EX 8-Bay Maintenance Hangar Complex-Industry Day | Michigan National Guard | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity