Pre-Proposal Conference Minutes - Repair Bldg. 168 Wellness Center.pdf
PDF 252 KB Posted
- Solicitation number
- W50S8520B0007
About this file
The document outlines the pre-proposal conference minutes for a federal contract solicitation to perform repairs to Building 168 Wellness Center at Selfridge Air National Guard Base. The scope of work includes converting an existing bell tower to a clock tower, replacing the tower's lower roof, repairing the tower's masonry, and demolishing and replacing existing windows. Interested contractors were required to attend the pre-proposal site visit on August 13, 2020. Final bids are due by August 28, 2020. The contract is set aside for small businesses and has an estimated value between $500,000 to $1 million. The period of performance is 180 days and payment and performance bonds will be required. The solicitation was issued by the Department of the Army Michigan Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B168 Wellness Center Bid Opening Attendance Sheet.pdf | ||
| Bid Opening Abstract - W50S8520B0007 Bldg 168 Wellness Center.xls | XLS spreadsheet | |
| Pre-Proposal Site Visit Attendance Sheet.pdf | ||
| RFI Q A W50S8520B0007.docx | DOCX document | |
| 168 ACM Summary.pdf | ||
| Amendment 1 20B0007.pdf | ||
| SANG 100 RPR BLDG 168 EXT Specs - 6MAR2019.pdf | ||
| ADDENDUM 001 SOW.docx | DOCX document | |
| RPR B168 - Specs Drawings 182033.pdf | ||
| W50S85-20-B-0007.pdf | ||
| 21JUL2020 - 168 - Drawings Addendum 1.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MICHIGAN AIR NATIONAL GUARD
127th MISSION SUPPORT GROUP
SELFRIDGE ANG BASE MICHIGAN
13 August 2020
MEMORANDUM FOR RECORD
FROM: 127 MSC
Contracting Division 43200
Maple St, Bldg. 105
Selfridge ANGB, MI 48045-5213
SUBJECT: Pre-Bid Conference for IFB Solicitation W912JB-20-B-0007 – Repairs to Bldg. 168 Wellness Center –
Selfridge ANGB, MI (48045)
1. Site visit held this date at the Contracting Division outside Bldg. 105 conference room commencing at:
11:30am EST in conjunction with interested contractors. For list of attendees see sign in sheet.
2. Daniel Taliaferro, MSgt (127th Contracting), Ms. Verene Goulette (127th Civil Engineering) and
Mr. Darren Burton (127th Civil Engineering) introduced themselves.
A. PROJECT DESCRIPTION:
3. Contractor shall perform all work in accordance with the statement of work and drawings. VGLZ 182033
Repair Building 168 Wellness Center consists of the conversion of the existing bell tower to a clock tower, replacement of the tower’s lower roof, repair of the towers masonry to include concrete units, and window demolition /replacement. The conversion of the clock tower includes the installation of clock faces along with electrical work and materials to provide necessary power to accommodate new exterior clock installation as noted in the drawings and specifications. The window replacement consists of the demolition of existing window systems. The historic sizing of window openings is to remain as is and new windows are to mimic the originals as closely as possible.
ADDENDUM 001 (21 July): This requirement has now changed to remove the surface mounted exterior face clock on the tower requirement from the construction project.
Solicitation #: W50S85-20-B-0007
Location: Selfridge ANGB, MI (Harrison Twp., MI - 48045)
Period of Performance (POP): 180 Days
Set-aside: This requirement will be 100% Set-Aside for Small Business. Small
Business Size Standard: $39.5M
NAICS Code: (W50S8520B0007) 236220 – Commercial & Institutional Building Construction
Project Magnitude: Between $500,000 and 1,000,000
Submit Bids no later than: 28 August 2020, @ 2:00 pm EST Payment and Performance Bonds are required.
4. Bids are due NLT 28 August 2020 at 2:00 pm ET. A public bid opening will take place at Bldg. 105
Conference Room at Selfridge ANGB.
a. Facsimile transmission of bid is NOT authorized.
b. Bids may be mailed in or hand carried. A bid repository is provided for hand carried bids and is located at 43200 Maple Street, Bldg. 105, Contracting Front Office (Directly across from Room 20), Selfridge ANGB, MI 48045. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. See instructions to obtain access to the base in the Site Visit instruction. Follow the same instruction for obtaining entry to hand carry bid. Late receipt of bids due to entry delays may not be deemed excusable and the Contracting
Officer may declare the bid “late” in accordance with FAR 14.304.
c. Electronic submission of bids will not be accepted.
d. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications.
e. A Site Visit was held immediately after this pre-proposal conference at the construction site.
f. When amendments are issued they will be posted to the beta.sam.gov website.
g. Bid Bonds will be required for this project. (At time of Bid Opening) If greater than $35,000.00 payment bond will be required; $150,000.00, a performance bond will be required. (At time of
Award)
h. Liquidated damages of $719.11 per day apply to this project.
i. Warranty of Construction clause is incorporated and applies to this project.
j. The most current wage determination is incorporated into the solicitation and will be made part of the resultant contract but it is the contractor's responsibility to keep track of the most current wage rate.
Currently MI2020091 07/24/2020 Mod 5.
k. Safety measures are always a part of Government contracts and the Army Corp of Engineers manual is incorporated in the contract.
l. RFI procedures were reviewed as follows:
i. Email technical questions in RFI format to Contracting Office for resolution.
ii. All RFI questions and answers posted to beta.sam.gov, as soon as possible, and if applicable to all.
m. Please recall that only the Contracting Officer can approve changes such as price, schedule, specifications, and clauses with formal written notice typically in the form of a solicitation amendment or task order modification. Work undertaken regarding changes not formally approved by the Contracting Officer (save for COR approved no cost field changes) is at the Contractor’s risk.
n. This requirement is currently unfunded. Prospective offerors were requested to ensure that bids are validated through 30 September 2020.
o. The Government intends to award a contract to the low price responsible bidder without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer, in his/her sole discretion, later determines them to be necessary or appropriate.
i. Evaluation Factors for Award:
1. Price
2. Price-Related Factors
5. The project description was stated in the beta.sam.gov announcement package W50S85-20-B-0007.
6. All/ all project specific questions were referred to the RFI submittal process. It was advised to submit all RFIs NLT COB on 24 August 2020. It was also advised that any changes would be issued with an addendum.
7. It is extremely important to submit all requirements within quote.
8. The site visit concluded at Selfridge ANGB on Thursday, 13 August 2020 @ 1230 EST.
DANIEL T. TALIAFERRO
Contract Officer, 127th MSC
| 2020-08-27T19:49:01-0400 | |
| TALIAFERRO.DANIEL.THOMAS.1098199981 |
File details come from the government source that posted it. Updated .