Repair Storm Damage to Hangar B at Floyd Bennett Field, Floyd Bennett Field, Brooklyn, NY PMIS GATE 195021

Award Notice Posted

Solicitation number
P15PS00421
Agency
Awarded
to Nagan Construction Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
P15PC00198 Federal contract award
PSC
Not on record
Place of performance
Gateway National Recreation Area Brooklyn, New York 195021, United States

Notice details come from SAM.gov. Updated .

Notice text

10 versions

Update #10 · Latest ·

Contract Award:  P15PC00198, Solicitation Number P15PS00421

Contract Award Dollar Amount $5,524,163.00

Contract Line Item Numbers CLINS 1-5, 8-12 and Option A

Contract Date:  April 30, 2015

Contractor:  Nagan Construction Inc., 226 Wanser Ave., Inwood, NY  11096

Description:  Hurricane Sandy caused significant damage to Floyd Bennett Field in Jamaica Bay, including damage to Hangar B.  The intent of this project is to restore the building envelop of Hangar B to be weather proof and resist hurricane damage.  Work includes roof, windows and miscellaneous repairs.

Place of Contract Performance:  Floyd Bennett Field, NY Kings County

This is a Small Business Set-aside.



Update #9 ·

Amendment No. 006 to P15PS00421
Amendment No. 006 Questions & Answers

1) Amendments have been issued without an SF30. How shall we accomplish proper acknowledgement of them. Please acknowledge all amendments on the SF 1442 issued with this Amendment No. 006.


2) Section L, Factor 1 c. Project Plan states to "provide a narrative on ability to schedule work by developing a critical path schedule". Are we to provide a narrative or a schedule to comply with this request?
Both.


3) Schedule B Price sheet Items 7-12 request unit pricing but do not provide quantities. Please clarify, because if contractors use different quantities, the evaluated prices will not be comparable. This is a firm fixed price contract. Unit pricing information is requested for price comparison only.


4) Asbestos Spec Section 020950 1.8 requests unit prices; however, this is not included on the price sheet Schedule B. This is a firm fixed price contract. Unit pricing information is requested for price comparison only.


5) EPDM Sure Fleece 115 is only offered by Carlisle Syntec. The Government requirement is fleece backed EPDM. There are several suppliers of fleece backed EPDM.
6) Amendment 1 Q&A's question number 2. If the "Contractor is fully responsible for all hazardous material abatement on this project." Then the contractor must abate all hazardous materials in the "Asbestos Survey" which means all of the transite panels including inside panels, pipe insulation, all of the roofing and all of the vinyl floor tiles listed on page 8 of the report. Additionally any lead paint is considered hazardous and must be abated. The answer says "ACM has been identified on the existing canopy roofs in the transite panels." It appears by the quantities on page 8 of the report (Roofing 105,560 sf.) that the roofing membrane on top of the hangar also must be abated. Is this your instruction to bidders given in the answer to question 2 to abate all hazardous materials recommended for abatement in the report? The roof membrane is not hot, as per the report.


7) An asbestos report was issued with Amendment 1 written by Froehling & Robertson dated June 20, 2014. The original RFP included another asbestos report from Prizm, Inc. dated May 2009. Does the report issued in the amendment replace the report issued with the RFP? The second report is not a replacement. Both reports are part of the contract. If there is a discrepancy between the two reports, the June 20, 2014 report governs.
8) Hand delivered proposals will be checked in and dated at the Guard Station.
9) The Question and Answer period is closed.
10) The proposal due date is extended. Proposals are due no later than 0600 MT, March 24, 2015.


 

Update #8 ·

Amendment No. 005 provides SF 1442 for offerors to acknowledge all amendments; provides questions and answers and updates Davis Bacon Wage Rates.

Update #7 ·

Amendment No. 0005 to P15PS00421
Questions and Answers
1. The scope of work indicates painting the top flanges of the trusses and the purlins. For clarification, we are not painting the underside of the existing roof deck we are only to paint the deck boards replaced as indicated on Sheet S3?
Correct.

2. The scope of work indicates removing rust, clean and grease the steel tracks. In the event that the track is non-functional due to pitting or excessive corrosion, is there a provision for replacing sections of track? If not, do you want us to provide a price per 3' liner section for replacement upon site determination?
The Scope of Work does not call for replacement of tracks, only removal of rust, cleaning and greasing. Sandy storm damage did not dent the tracks. Do not price what is not in scope.


3. The solicitation indicates to deliver one (1) original and four (4) copies of our proposal. Can we submit an electronic version with hard copies to follow?
No.
4. East lean wall, are we replacing the entire CMU?
Yes, as per wall section A/A11.
5. After removing the windows, will we be replacing the window sills?
For east wall, yes, as per wall section A/A11, if west wall, as per wall section B/A11.

Update #6 ·

Amendment No. 004 - Electronic proposals will not be accepted.

Update #5 ·

Amendment No. 003 answers offeror(s) questions.  The proposal due date is unchanged.

Update #4 ·

Amendment No. 002 changes Specification 085117-4 Steel Window Repair and Finishing in accordance with the attached Amendment No. 002.

Update #3 ·

This Amendment No. 001 to Solicitation P15PS00421 for the Repair of Storm Damage to Hanger B at Floyd Bennett Field is issued to 1) answer offeror's questions, 2) update Davis Bacon Wage Rates, and provide a Non-Invasive Asbestos Survey Report for Hanger B.

Update #2 ·

This Amendment No. 001 sets the pre-proposal site visit for 10:00 am - 12:00 pm on Monday,March 2, 2015.  Participants shall meet at Hanger B, Gateway Recreation Area, Brooklyn, New York. 

Please email a list of attendees to victoria_nosal@nps.gov by 12:00 p.m. MT on February 27, 2015.  The list should include company name and participant name(s).

All other terms and conditions remain unchanged.

Update #1 ·

Hurricane Sandy, a category one storm, made landfall on the New Jersey coast on October 29, 2012. The storm caused significant damage to Floyd Bennett Field in the Jamaica Bay Unit, including damage to Hangar B. The intent of this project is to restore the building envelope to be weather proof and resist hurricane damage.


The National Park Service requests your proposal in accordance with the attached documents.


 

Files

File Type Posted
P15PS00421_amendment_6.pdf PDF
Amendment_No._005.docx DOCX document
General_Decision_Numbe1.docx DOCX document
P15PS00421.pdf PDF
Amendment_No._004_to_P15PS00421.pdf PDF
P15PS00421_Amendment_No._003.pdf PDF
P15PS00421_Amendment_No._002.pdf PDF
Amendment_No._001.pdf PDF
Final_Construction_Drawings.pdf PDF
Gateway_Hangar_B_Specs.pdf PDF
SubcontractorReference.doc DOC document
HazmatForm.doc DOC document
GeneralReferences.doc DOC document
KeyPers.doc DOC document
General_Decision_1-30-15.docx DOCX document
Hangar_B_Asbestos_Survey_Report.pdf PDF
Experience_Form.doc DOC document
P15PS00421.pdf PDF
Past_Performance_Questionnaire.doc DOC document
ProposedEquals.doc DOC document
Show all 20

Notice history

Notice Type Posted
This notice Latest Award Notice
Repair Storm Damage at Historic Hangar B Floyd Bennett Field Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors