Amendment_No._005.docx
DOCX document 16 KB Posted
- Attached to
- Repair Storm Damage to Hangar B at Floyd Bennett Field, Floyd Bennett Field, Brooklyn, NY PMIS GATE 195021
- Solicitation number
- P15PS00421
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P15PS00421_amendment_6.pdf | ||
| P15PS00421.pdf | ||
| General_Decision_Numbe1.docx | DOCX document | |
| Amendment_No._004_to_P15PS00421.pdf | ||
| P15PS00421_Amendment_No._003.pdf | ||
| P15PS00421_Amendment_No._002.pdf | ||
| Amendment_No._001.pdf | ||
| General_Decision_1-30-15.docx | DOCX document | |
| P15PS00421.pdf | ||
| GeneralReferences.doc | DOC document | |
| HazmatForm.doc | DOC document | |
| Final_Construction_Drawings.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| ProposedEquals.doc | DOC document | |
| KeyPers.doc | DOC document | |
| Gateway_Hangar_B_Specs.pdf | ||
| SubcontractorReference.doc | DOC document | |
| Hangar_B_Asbestos_Survey_Report.pdf | ||
| Experience_Form.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 0005 to P15PS00421 Questions and Answers
1. The scope of work indicates painting the top flanges of the trusses and the purlins. For clarification, we are not painting the underside of the existing roof deck we are only to paint the deck boards replaced as indicated on Sheet S3?
Correct.
2. The scope of work indicates removing rust, clean and grease the steel tracks. In the event that the track is non-functional due to pitting or excessive corrosion, is there a provision for replacing sections of track? If not, do you want us to provide a price per 3’ liner section for replacement upon site determination?
The Scope of Work does not call for replacement of tracks, only removal of rust, cleaning and greasing. Sandy storm damage did not dent the tracks. Do not price what is not in scope.
3. The solicitation indicates to deliver one (1) original and four (4) copies of our proposal. Can we submit an electronic version with hard copies to follow?
No.
4. East lean wall, are we replacing the entire CMU?
Yes, as per wall section A/A11.
5. After removing the windows, will we be replacing the window sills?
For east wall, yes, as per wall section A/A11, if west wall, as per wall section B/A11.
File details come from the government source that posted it. Updated .