ProposedEquals.doc

DOC document 35 KB Posted

Attached to
Repair Storm Damage to Hangar B at Floyd Bennett Field, Floyd Bennett Field, Brooklyn, NY PMIS GATE 195021
Solicitation number
P15PS00421
Issued by

About this file

Proposal Submission Package Form 6 of 7

View the file

Other files

File Type Posted
P15PS00421_amendment_6.pdf PDF
P15PS00421.pdf PDF
Amendment_No._005.docx DOCX document
General_Decision_Numbe1.docx DOCX document
Amendment_No._004_to_P15PS00421.pdf PDF
P15PS00421_Amendment_No._003.pdf PDF
P15PS00421_Amendment_No._002.pdf PDF
Amendment_No._001.pdf PDF
General_Decision_1-30-15.docx DOCX document
P15PS00421.pdf PDF
GeneralReferences.doc DOC document
HazmatForm.doc DOC document
Final_Construction_Drawings.pdf PDF
Past_Performance_Questionnaire.doc DOC document
KeyPers.doc DOC document
Gateway_Hangar_B_Specs.pdf PDF
SubcontractorReference.doc DOC document
Hangar_B_Asbestos_Survey_Report.pdf PDF
Experience_Form.doc DOC document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable. Use additional sheets of paper as necessary.

Section No.
Paragraph No.
Product/Model No.
Proposed Product/Model No.

A.

By submitting the proposed equal, the contractor certifies that it:

1.

Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2.

Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3.

Has determined that the proposed item is compatible with interfacing items.

4.

Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5.

Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

File details come from the government source that posted it. Updated .