About this opportunity
The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood is seeking proposals for a construction contract to repair Range Road 21 (RR21) at White Sands Missile Range in New Mexico. The project involves milling the existing asphalt pavement, processing the subgrade, backfilling and reshaping the edges, placing geotextile fabric and Type II base course, and applying Type III asphalt paving and pavement markings. Proposals will be evaluated in a two-step sealed bidding process, with technical proposals due on August 28, 2024 and sealed bids due on September 20, 2024. The evaluation will focus on the contractor's technical approach and methodologies, and the contract will be awarded to the lowest responsive and responsible bidder.
This is a competitive 8(a) set-aside with a small business size standard of $45 million. The estimated contract value is between $5 million and $10 million, and the period of performance is 180 calendar days after the notice to proceed. The work must be performed simultaneously, and the contractor must provide a Superintendent who cannot be subcontracted.
Notice text
6 versions
Update #6 · Latest ·
**STEP TWO Technical Proposals (Bid Opening) are due no later than 10:00 AM MST on
20 September 2024.**
SOLICITATION UPDATE WILL BE PROVIDED MONDAY 9/16/2024
RFI QUESTIONS HAVE BEEN UPDATED #31, #32 NO NEW QUESTIONS WHERE ADDED.
FURTHER MORE ELECTRONIC BIDS ARE ACCEPTED FOR STEP 1ONLY.
This amendment is issued to notify all potential offerors that electronic bids w ill be accepted f or Step 1 of this solicitation. A ll electronic submissions must be received no later than the established date and time specif ied in the solicitation. Bids r eceived after the designated deadline w ill not be considered. Ensure that all submissions comply w ith the format and submissions comply w ith the format and submission guidlines outlined in the solicitation. Bids can be emailded to jennifer.m.contreras13.civ @army.mil or flor.f .sanchez.civ@army.mil
Provision 14.202-8 Electronic bids as been included.
CHANGES
The purpose of this amendment is to extend the solicitation due date to allow additional time for prospective offers to prepare and submit their proposals.
UPDATED BID SCHEDULE
STEP 1 Due August 28, 2024, at 11:00 AM MST
STEP 2 Due September 11, 2024, at 11:00 AM MST
REMOVED experience,and capacity to perform.
ACKNOLEGMENT OF SF 30 IS REQUIRED.
RFI QUESTIONS HAVE BEEN POSTED
Project Title: Repair RR21 project consist of milling RR21, processing subgrade,
backfill edge of pavement on both sides of the roadway, reshaping and compacting
to the required density, proof rolling with the COR as a witness, place geotextile
TY I filter fabric. Place TY II base course, SP III asphalt paving and pavement
markings that are indicated on the drawings (See Part 11-Narative of Specific
Work Requirements). Provide all material, equipment, and labor to repair RR21
consisting of milling, processing subgrade, backfill edges, reshape, compacting ect,
per the design drawings and SOW.
Update #5 ·
SOLICITATION UPDATE WILL BE PROVIDED MONDAY 9/16/2024
**STEP TWO Technical Proposals (Bid Opening) are due no later than 11:00 AM MST on
17 September 2024.**
RFI QUESTIONS HAVE BEEN UPDATED #31, #32 NO NEW QUESTIONS WHERE ADDED.
FURTHER MORE ELECTRONIC BIDS ARE ACCEPTED FOR STEP 1ONLY.
This amendment is issued to notify all potential offerors that electronic bids w ill be accepted f or Step 1 of this solicitation. A ll electronic submissions must be received no later than the established date and time specif ied in the solicitation. Bids r eceived after the designated deadline w ill not be considered. Ensure that all submissions comply w ith the format and submissions comply w ith the format and submission guidlines outlined in the solicitation. Bids can be emailded to jennifer.m.contreras13.civ @army.mil or flor.f .sanchez.civ@army.mil
Provision 14.202-8 Electronic bids as been included.
CHANGES
The purpose of this amendment is to extend the solicitation due date to allow additional time for prospective offers to prepare and submit their proposals.
UPDATED BID SCHEDULE
STEP 1 Due August 28, 2024, at 11:00 AM MST
STEP 2 Due September 11, 2024, at 11:00 AM MST
REMOVED experience,and capacity to perform.
ACKNOLEGMENT OF SF 30 IS REQUIRED.
RFI QUESTIONS HAVE BEEN POSTED
Project Title: Repair RR21 project consist of milling RR21, processing subgrade,
backfill edge of pavement on both sides of the roadway, reshaping and compacting
to the required density, proof rolling with the COR as a witness, place geotextile
TY I filter fabric. Place TY II base course, SP III asphalt paving and pavement
markings that are indicated on the drawings (See Part 11-Narative of Specific
Work Requirements). Provide all material, equipment, and labor to repair RR21
consisting of milling, processing subgrade, backfill edges, reshape, compacting ect,
per the design drawings and SOW.
Update #4 ·
**STEP TWO Technical Proposals (Bid Opening) are due no later than 11:00 AM MST on
17 September 2024.**
RFI QUESTIONS HAVE BEEN UPDATED #31, #32 NO NEW QUESTIONS WHERE ADDED.
FURTHER MORE ELECTRONIC BIDS ARE ACCEPTED FOR STEP 1ONLY.
This amendment is issued to notify all potential offerors that electronic bids w ill be accepted f or Step 1 of this solicitation. A ll electronic submissions must be received no later than the established date and time specif ied in the solicitation. Bids r eceived after the designated deadline w ill not be considered. Ensure that all submissions comply w ith the format and submissions comply w ith the format and submission guidlines outlined in the solicitation. Bids can be emailded to jennifer.m.contreras13.civ @army.mil or flor.f .sanchez.civ@army.mil
Provision 14.202-8 Electronic bids as been included.
CHANGES
The purpose of this amendment is to extend the solicitation due date to allow additional time for prospective offers to prepare and submit their proposals.
UPDATED BID SCHEDULE
STEP 1 Due August 28, 2024, at 11:00 AM MST
STEP 2 Due September 11, 2024, at 11:00 AM MST
REMOVED experience,and capacity to perform.
ACKNOLEGMENT OF SF 30 IS REQUIRED.
RFI QUESTIONS HAVE BEEN POSTED
Project Title: Repair RR21 project consist of milling RR21, processing subgrade,
backfill edge of pavement on both sides of the roadway, reshaping and compacting
to the required density, proof rolling with the COR as a witness, place geotextile
TY I filter fabric. Place TY II base course, SP III asphalt paving and pavement
markings that are indicated on the drawings (See Part 11-Narative of Specific
Work Requirements). Provide all material, equipment, and labor to repair RR21
consisting of milling, processing subgrade, backfill edges, reshape, compacting ect,
per the design drawings and SOW.
Update #3 ·
RFI QUESTIONS HAVE BEEN UPDATED #31, #32 NO NEW QUESTIONS WHERE ADDED.
FURTHER MORE ELECTRONIC BIDS ARE ACCEPTED FOR STEP 1ONLY.
This amendment is issued to notify all potential offerors that electronic bids w ill be accepted f or Step 1 of this solicitation. A ll electronic submissions must be received no later than the established date and time specif ied in the solicitation. Bids r eceived after the designated deadline w ill not be considered. Ensure that all submissions comply w ith the format and submissions comply w ith the format and submission guidlines outlined in the solicitation. Bids can be emailded to jennifer.m.contreras13.civ @army.mil or flor.f .sanchez.civ@army.mil
Provision 14.202-8 Electronic bids as been included.
CHANGES
The purpose of this amendment is to extend the solicitation due date to allow additional time for prospective offers to prepare and submit their proposals.
UPDATED BID SCHEDULE
STEP 1 Due August 28, 2024, at 11:00 AM MST
STEP 2 Due September 11, 2024, at 11:00 AM MST
REMOVED experience,and capacity to perform.
ACKNOLEGMENT OF SF 30 IS REQUIRED.
RFI QUESTIONS HAVE BEEN POSTED
Project Title: Repair RR21 project consist of milling RR21, processing subgrade,
backfill edge of pavement on both sides of the roadway, reshaping and compacting
to the required density, proof rolling with the COR as a witness, place geotextile
TY I filter fabric. Place TY II base course, SP III asphalt paving and pavement
markings that are indicated on the drawings (See Part 11-Narative of Specific
Work Requirements). Provide all material, equipment, and labor to repair RR21
consisting of milling, processing subgrade, backfill edges, reshape, compacting ect,
per the design drawings and SOW.
Update #2 ·
CHANGES
The purpose of this amendment is to extend the solicitation due date to allow additional time for prospective offers to prepare and submit their proposals.
UPDATED BID SCHEDULE
STEP 1 Due August 28, 2024, at 11:00 AM MST
STEP 2 Due September 11, 2024, at 11:00 AM MST
REMOVED experience,and capacity to perform.
ACKNOLEGMENT OF SF 30 IS REQUIRED.
RFI QUESTIONS HAVE BEEN POSTED
Project Title: Repair RR21 project consist of milling RR21, processing subgrade,
backfill edge of pavement on both sides of the roadway, reshaping and compacting
to the required density, proof rolling with the COR as a witness, place geotextile
TY I filter fabric. Place TY II base course, SP III asphalt paving and pavement
markings that are indicated on the drawings (See Part 11-Narative of Specific
Work Requirements). Provide all material, equipment, and labor to repair RR21
consisting of milling, processing subgrade, backfill edges, reshape, compacting ect,
per the design drawings and SOW.
Update #1 ·
Project Title: Repair RR21 project consist of milling RR21, processing subgrade,
backfill edge of pavement on both sides of the roadway, reshaping and compacting
to the required density, proof rolling with the COR as a witness, place geotextile
TY I filter fabric. Place TY II base course, SP III asphalt paving and pavement
markings that are indicated on the drawings (See Part 11-Narative of Specific
Work Requirements). Provide all material, equipment, and labor to repair RR21
consisting of milling, processing subgrade, backfill edges, reshape, compacting ect,
per the design drawings and SOW.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Repair Range Road 21 (RR21) | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance | MICC Fort Hood | Competitive 8(a) |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity