Renovate Marshall Gulch Picnic Area & Trailhead
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAX25R0015
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Tucson, Arizona 85701, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking a contractor to renovate the Marshall Gulch Picnic Area & Trailhead in the Coronado National Forest, Arizona, through solicitation 127EAX25R0015. The project involves constructing a 1,100-foot single-lane asphalt road with 32 roadside parking spaces and installing two precast and prestressed beam bridges measuring 64 and 76 feet long, both 30 feet wide with 8-foot clear heights. Additional work includes relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing and removing culverts, removing retaining walls, reconstructing a small channel, and implementing various improvements to the picnic areas and trailhead. Proposals will be evaluated using a tradeoff process considering past performance, experience, technical approach, and price, with non-price factors being approximately equal to price. The proposal due date has been extended to September 22, 2025, at 1:00 PM Central Time, following a site visit that occurred on August 28, 2025.
This opportunity is designated as a Competitive 8(a) set-aside contract with no current incumbents identified in the documentation. The project has an estimated magnitude between $1,000,000 and $5,000,000 and will be awarded as a firm-fixed price contract with Davis-Bacon wage requirements. The period of performance extends from October 1, 2025, to September 30, 2026, with a 180-day completion timeline after notice to proceed. The work will be performed at Marshall Gulch Picnic Area on Mount Lemmon in Tucson, Arizona, within the Coronado National Forest. The solicitation includes both main bid items and additive bid items, with contractors required to submit a 20% bid bond and handle all aspects of construction from mobilization through final landscaping and restoration activities.
Notice text
4 versions
Update #4 · Latest ·
Amendment 1 - This amendment updates Q&A's, incorporates updated SOI and extends the Proposal Due date to September 22nd, 2025, 1300 CD.
Q&A's and attachments have been published.
Site Visit has been scheduled for August 28th, 2025 @10:00 am Local Time. Location will be Marshall Gulch Picnic Area, Mt. Lemmon, AZ 85619. Coordinates - 32.4283560, -110.7556069. The proposal due date will be extended from September 1st, 2025 to September 15th, 2025.
Work primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small improvements associated with the picnic areas and trailhead.
Update #3 ·
Q&A's and attachments have been published.
Site Visit has been scheduled for August 28th, 2025 @10:00 am Local Time. Location will be Marshall Gulch Picnic Area, Mt. Lemmon, AZ 85619. Coordinates - 32.4283560, -110.7556069. The proposal due date will be extended from September 1st, 2025 to September 15th, 2025.
Work primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small improvements associated with the picnic areas and trailhead.
Update #2 ·
Site Visit has been scheduled for August 28th, 2025 @10:00 am Local Time. Location will be Marshall Gulch Picnic Area, Mt. Lemmon, AZ 85619. Coordinates - 32.4283560, -110.7556069. The proposal due date will be extended from September 1st, 2025 to September 15th, 2025.
Work primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small improvements associated with the picnic areas and trailhead.
Update #1 ·
Work primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small improvements associated with the picnic areas and trailhead.
Files
| File | Type | Posted |
|---|---|---|
| MarshallGulch_SOI2025.xlsx | XLSX spreadsheet | |
| All Mashall Questions updated 9_12_2025.docx | DOCX document | |
| 127EAX25R0015 0001.pdf | ||
| All Mashall Questions up to date 9_3_2025.docx | DOCX document | |
| 604269001 R Geotech Eval.pdf | ||
| Staging Area Map_Marshall Gulch.pdf | ||
| signup sheet 8_28_2025.jpg | JPG image | |
| Attachment 10 - Schedule of Items.xlsx | XLSX spreadsheet | |
| 127EAX25R0015 Solicitation.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Renovate Marshall Gulch Picnic Area & Trailhead | Award Notice | |
| This notice | Solicitation | |
| Renovate Marshall Gulch Picnic Area & Trailhead | Pre-Solicitation | |
| Renovate Marshall Gulch Picnic Area & Trailhead | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Forest Wide Decommissioning Project | Forest Service | Total Small Business | |
| Chino Emergency Repairs | Forest Service | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity