Attachment 10 - Schedule of Items.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Renovate Marshall Gulch Picnic Area & Trailhead
- Solicitation number
- 127EAX25R0015
- Issued by
-
Department of Agriculture Forest Service
About this file
The document is a Schedule of Items Excel spreadsheet for the Renovate Marshall Gulch Picnic Area and Trailhead project by the U.S. Forest Service. The project involves constructing a 1,100-foot single-lane asphalt road with 32 parking spaces and two precast beam bridges (64 and 76 feet long, 30 feet wide). The detailed line-item schedule includes multiple construction activities such as mobilization, clearing and grubbing, excavation, bridge staking, riprap placement, concrete work, drainage pipe installation, road base and asphalt placement, and landscaping elements like seeding and signage.
The comprehensive bid schedule is divided into two main sections: Main Bid Items and Option Items, with quantities specified for each line item using various measurement units including linear feet (LF), cubic yards (CY), square yards (SY), and lump sum (LS). Key construction components include structural excavation, foundation fill, retaining walls, geocell abutment stabilization, and infrastructure elements like culverts, bridge rails, and roadway markings. The project scope also involves relocating an existing vault restroom, removing existing picnic areas, and reconstructing a small channel, with a total focus on infrastructure improvement and site renovation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX25R0015 0001.pdf | ||
| All Mashall Questions updated 9_12_2025.docx | DOCX document | |
| MarshallGulch_SOI2025.xlsx | XLSX spreadsheet | |
| signup sheet 8_28_2025.jpg | JPG image | |
| All Mashall Questions up to date 9_3_2025.docx | DOCX document | |
| Staging Area Map_Marshall Gulch.pdf | ||
| 604269001 R Geotech Eval.pdf | ||
| 127EAX25R0015 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Renovate Marshall Gulch Picnic Area and Trailhead |
| SCHEDULE OF ITEMS |
| Main Bid Items (Proposed Road and Bridge Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15205 | Bridge Staking, Precision Class A | LSQ | LS | 1 | ||
| 15212 | Slope, Reference, and Clearing and Grubbing Staking, Method 1, Tolerance A | LSQ | LS | 1 | ||
| 15221 | Grade Finishing Stakes, Subgrade, Base Course, and Pavement | LSQ | LS | 1 | ||
| 15713 | Soil Erosion, Pollution Control, Stream Diversion, & Dewatering Plan | LSQ | LS | 1 | ||
| 20101 | Clearing and Grubbing | LSQ | LS | 1 | ||
| 20301 | Removal of Individual Trees and Stumps | LSQ | LS | 1 | ||
| 20302 | Removal of Low Water Crossing and all retaining walls, Disposal Method A | LSQ | LS | 2 | ||
| 20431 | Roadway Excavation and Embankment | LSQ | LS | 1 | ||
| 20804 | Structural Excavation | LSQ | LS | 1 | ||
| 20805 | Foundation Fill | LSQ | LS | 1 | ||
| 20806 | Structural Backfill | LSQ | LS | 1 | ||
| 20807 | Stream Excavation | AQ | CY | 250 | ||
| 25101 | Placed Riprap, Class 6 | AQ | CY | 568 | ||
| 25805 | Reinforced Split Face Concrete Masonry Unit Retaining Walls | AQ | SF | 3338 | ||
| 27250 | Geocell Abutment Stabilization, 6 inch depth | AQ | SY | 96 | ||
| 30103 | Aggregate Base, Compaction Method D | AQ | TON | 584 | ||
| 40304 | Asphalt Concrete, Arizona State DOT, Section 406, 3/4-Inch Mix | AQ | TON | 418 | ||
| 55201 | Cast-in-Place Concrete Curbs, Grade Beams, and Wingwalls | AQ | CY | 155 | ||
| 55301 | Precast, Prestressed Concrete Structural Members, Box Beams | AQ | EA | 16 | ||
| 55401 | Reinforcing Steel | AQ | LS | 1 | ||
| 55601 | Steel Bridge Rail | AQ | LF | 222 | ||
| 60201 | 24" Drainage Corrugated Metal Pipe | AQ | LF | 36 | ||
| 61301 | Simulated Stone Masonry Treatment | AQ | SY | 162 | ||
| 61302 | Simulated Stone Masonry Test Walls | AQ | EA | 1 | ||
| 62528 | Seeding and Mulching, Dry Method | LSQ | LS | 1 | ||
| 63301 | Sign System | AQ | EA | 11 | ||
| 63306 | Posts, Wood | AQ | LF | 80 | ||
| 63307 | Object Markers Type 3 | AQ | EA | 8 | ||
| 63406 | Pavement Markings, Type H | LSQ | LS | 1 | ||
| Main Bid Item Total without Mobilization | ||||||
| Main Bid Items Total |
| Option Items 1 (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 10010 | Relocate Existing CXT Vault Restroom (Sheets S-02 & D-03) | LSQ | LS | 1 | ||
| 15214 | Survey and Staking, Establish Project Control Points | LSQ | LS | 1 | ||
| 20307 | Removal of 1 Restroom w/ Stairs & 6 Picnic Areas (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 20308 | Removal of Stone Masonry Rubble, <10CY Total (Sheet S-01) | LSQ | LS | 1 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheets S-01 & D-01) | AQ | EA | 2 | ||
| 20310 | Relocate Bulletin Board (Sheet S-01) | AQ | EA | 1 | ||
| 20311 | Relocate Trash and Recycle Bins, 3 total (Sheet S-01) | AQ | EA | 3 | ||
| 25101 | Placed Riprap, Class 4, Restroom fillslope (Sheet S-02) | AQ | CY | 20 | ||
| 60101 | Concrete Staircase w/Handrail, Integral Color (Sheets S-01 & D-02) | LSQ | LS | 1 | ||
| 61501A | Sidewalk, Concrete, 4-inch (Sheets S-02 & D-04) | AQ | SY | 25 | ||
| 61501C | Sidewalk, Aggregate, 4-inch (Sheets S-02 & D-04) | AQ | SY | 25 | ||
| 61801 | Precast Concrete Picnic Tables (Sheets S-01 & D-01) | AQ | EA | 3 | ||
| 63306 | Metal Post Pedestal Grills (Sheets S-01 & D-01) | AQ | EA | 3 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 62510 | Seeding, Dry Method (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheets S-01 & D-01) | LSQ | LS | 1 | ||
| 63601 | System Installation, VenTek Model M600XC (Sheets S-01 & D-05) | LSQ | LS | 1 | ||
| Additive Bid Items 1 Total without Mobilization | ||||||
| Additive Bid Items 1 Total |
Main + Additive 1 Bid items Total
| Option Items 2 - Picnic Areas South (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 20307 | Removal of Picnic Areas (Sheets S-02 & D-01) | AQ | EA | 2 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheets S-02 & D-01) | AQ | EA | 4 | ||
| 20311 | Relocate Trash and Recycle Bins, 3 total (Sheet S-02) | AQ | EA | 3 | ||
| 61501B | Sidewalk, Decomposed Granite (Sheets S-02 & D-01) | AQ | SY | 180 | ||
| 61801 | Precast Concrete Picnic Table (Sheets S-02 & D-01) | AQ | EA | 4 | ||
| 63306 | Metal Post Pedestal Grills (Sheets S-02 & D-01) | AQ | EA | 4 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheets S-02 & D-01) | LSQ | LS | 1 | ||
| 62510 | Seeding, Dry Method (Sheets S-02 & D-01) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheets S-02 & D-01) | LSQ | LS | 1 | ||
| Additive Bid Items 1-2 Total without Mobilization | ||||||
| Additive Bid Items 1-2 Total |
Main + Additive 1-2 Bid items Total
| Option Items 3 - Additional Vault Restroom (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 61501A | Sidewalk, Concrete, 4-inch (Sheets S-01 & D-04) | AQ | SY | 25 | ||
| 61501C | Sidewalk, Aggregate, 4-inch (Sheets S-01 & D-04) | AQ | SY | 25 | ||
| 64603 | Fixture, Vault Toilet, includes labor and materials (Sheets S-01 & D-03) | LSQ | LS | 1 | ||
| Additive Bid Items 3 Total without Mobilization | ||||||
| Additive Bid Items 3 Total |
Main + Additive 1-3 Bid Items Total
| Option Items 4 - Ramp To Old Road (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15221 | Grade Finishing Stakes, Subgrade, Base Course, and Pavement | LSQ | LS | 1 | ||
| 20401 | Roadway Excavation (Sheets S-01 & D-06) | LSQ | LS | 1 | ||
| 30103 | Aggregate Base, Compaction Method D (Sheet D-06) | AQ | TON | 70 | ||
| 40304 | Asphalt Concrete, ADOT, Section 406, 3/4-Inch Mix (Sheet D-06) | AQ | TON | 70 | ||
| 62625 | Bollard, Metal, Removable (Sheets S-01, D-06 & D-07) | AQ | EA | 2 | ||
| Additive Bid Item 4 Total without Mobilization | ||||||
| Additive Bid Items 4 Total |
Main + Additive 1-4 Bid items Total
| Option Items 5 - Marshall Creek Reconstruction (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 15713 | Soil Erosion, Pollution Control, Stream Diversion, & Dewatering Plan | LSQ | LS | 1 | ||
| 20301 | Removal of Pipe Culvert (Sheet S-02) | AQ | EA | 2 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheet D-08) | AQ | EA | 20 | ||
| 20402 | Subexcavation (Sheet S-02) | LSQ | LS | 1 | ||
| 60103 | Concrete Headwall (Sheet D-11) | AQ | EA | 2 | ||
| 60221 | Reinforced Concrete Box Culvert (Sheet D-11) | AQ | EA | 1 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheet D-08) | LSQ | LS | 1 | ||
| 62510 | Seeding, Dry Method (Sheet D-08) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheet D-8) | LSQ | LS | 1 | ||
| 62901 | Rolled Biodegradable Erosion Control Product (Sheet D-08) | LSQ | LS | 1 | ||
| Additive Bid Items 5 without Mobilization | ||||||
| Additive Bid Items 5 Total |
Main + Additive 1-5 Bid items Total
| Option Items 6 - Sabino Creek Demo Retaining Wall and Recontouring Parking Lot (Renovate Marshall Gulch Picnic Area & Trailhead Plans) | ||||||
| Pay Item | Description | Method of Measurement | Unit | Quantity | Unit Cost | Total |
| 15101 | Mobilization | LSQ | LS | 1 | ||
| 15214 | Survey and Staking | LSQ | LS | 1 | ||
| 15713 | Soil Erosion, Pollution Control, and Stream Diversion Plan | LSQ | LS | 1 | ||
| 20305 | Removal of Stone Masonry (Sheets S-02 & D-09) | LSQ | LS | 1 | ||
| 20309 | Relocate Boulders, 2'-4' Dia. (Sheet D-10) | AQ | EA | 15 | ||
| 20402 | Subexcavation (Sheet S-02) | LSQ | LS | 1 | ||
| 27001 | Grout (Sheet D-09) | LSQ | LS | 1 | ||
| 62405 | Place Conserved Topsoil, 8" Depth (Sheet D-10) | AQ | CY | 25 | ||
| 62510 | Seeding, Dry Method (Sheet D-10) | LSQ | LS | 1 | ||
| 62516 | Mulching, Hydraulic Method (Sheet D-10) | LSQ | LS | 1 | ||
| 62631 | Planting, propagate willows, in addition to seeding (Sheets D-08 & D-10) | LSQ | LS | 1 | ||
| 62901 | Rolled Biodegradable Erosion Control Product (Sheet D-10) | LSQ | LS | 1 | ||
| Additive Bid Items 6 Total without Mobilization | ||||||
| Additive Bid Items 6 Total |
Main + Additive 1-6 Bid Items Total