Renovate Marshall Gulch Picnic Area & Trailhead
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1148960
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Tucson, Arizona 85701, United States
- Points of contact
-
- Blaine Greenwalt blaine.greenwalt@usda.gov (800) 832-1355
- Troy A. McCullough troy.mccullough@usda.gov (757) 349-5638
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking contractors for the renovation of Marshall Gulch Picnic Area & Trailhead in the Coronado National Forest's Santa Catalina Ranger District. The project primarily involves constructing a 1,100-foot single-lane asphalt road with 32 roadside parking spaces and installing two precast prestressed beam bridges measuring 64 and 76 feet in length, both 30 feet wide with 8-foot clear heights. Additional work includes relocating a CXT vault restroom, constructing new picnic areas while demolishing existing ones, installing and removing culverts, removing retaining walls, and reconstructing a small channel along with various improvements to the picnic areas and trailhead facilities. The contractor must provide comprehensive deliverables including construction schedules, material certifications, quality control plans, traffic control plans, and testing reports while adhering to accessibility guidelines, concrete design specifications, and environmental protection measures. This pre-solicitation notice was posted on June 24, 2025, with a due date of July 8, 2025, though specific evaluation criteria were not detailed in the available documentation.
This opportunity is designated as a Competitive 8(a) set-aside, restricting participation to certified small disadvantaged businesses in the SBA's 8(a) Business Development Program. The project falls under NAICS code 237310 for Highway, Street, and Bridge Construction, indicating the specialized nature of the infrastructure work required. Construction activities are scheduled to begin August 1st for main and initial additive bid items, with subsequent additive items permitted to start September 1st, suggesting a phased approach to project execution. The site experiences significant traffic with over 65,000 vehicle visits during summer months and serves as a trailhead access point for multiple hiking trails, emphasizing the importance of maintaining public access during construction. No current contractor or incumbent information was provided in the documentation, nor were specific contract values or budget ranges disclosed at this pre-solicitation stage.
Notice text
WorkWork primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small improvements associated with the picnic areas and trailhead.
Attachments
| File | Type | Posted |
|---|---|---|
| Marshall Gulch SOW_2025.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Renovate Marshall Gulch Picnic Area & Trailhead | Award Notice | |
| Renovate Marshall Gulch Picnic Area & Trailhead | Solicitation | |
| Renovate Marshall Gulch Picnic Area & Trailhead | Pre-Solicitation | |
| Renovate Marshall Gulch Picnic Area & Trailhead | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity